Annex 19 - Placing of Concrete Checklist Rev1

Uploaded by

qpl.work
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views2 pages

Annex 19 - Placing of Concrete Checklist Rev1

Uploaded by

qpl.work
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Annex 19 Form no.

Republic of the Philippines


PHILIPPINE RURAL DEVELOPMENT PROJECT (PRDP)
Province of Bukidnon, Region 10

CLEARANCE FOR PLACING OF CONCRETE


Reference No.:
Subproject Name: CONSTRUCTION OF GREEN COFFEE BEANS FACILITIES Proposed Date:
Location: Brgy. Pigtauranan, Pangantucan, Bukidnon Type of Structure:
Part of Structure: Type/Strength of Conc.: 3,000 psi
Drawing Ref: Concrete Quantity:

INSPECTION CHECKLIST Yes No N/A Remarks INSPECTION CHECKLIST Yes No N/A Remarks
1.0 Excavation 3.0 Reinforcement
1.2 Is the excavation correct in size? 3.1 Are the rebars free from excessive rust?
1.3 Is the base properly compacted? 3.2 Is the spacing correct?
1.4 Is the excavation dry? 3.3 Is the concrete cover as per specs?
1.5 Is the selected fill/blinding concrete in place? 3.4 Are all tie wires in place and correctly tied?
2.0 Formwork 3.5 Are there adequate spacers/all specified intervals?
2.1 Is the bracing adequate? 3.6 Correct number of bars in the reinforcement?
2.2 Has mould oil been applied evenly and thoroughly? 3.7 Are all bars of the correct size?
2.3 Is the formwork vertical 3.8 Are the starter bars in the correct position?
2.4 Is horizontal alignment correct? 3.9 Are the starter bars and splices the correct
2.5 Is access adequate? size and number?
3.0 Cement 4.0 General
3.1 Are there sufficient quantity of cement? 4.1 Is the site clean and free from all debris?
3.2 Is the quality test being carried out 4.2 Are there adequate vibratory pokers on site?
and passed proj specs. requirement? 4.3 Is curing material available on site?
3.3 Is the Concrete Mix Design approved? 4.4 Have slump test and concrete sampling
4.0 Aggregates been organized?
4.1 Are there sufficient qty. of aggregates(C.A & F.A)? 4.5 Has adequate lighting been organized?
4.2 Is the quality test being carried out 4.6 Are stop blocks on site?
and passed proj. specs. requirement? 4.7 Is the access safe?
5.O Concrete 4.8 Other/Special Requirements?
5.1 Placing of Concrete Remarks:
5.2 a. Manual b.Chute c.Pump d.Crane & Bucket
e. Others(Specify)

Contractor: Inspected by:


Approved
ENGR. GEORWIN F. ALWAG ENGR. BON JAY M. PAANO Disapproved
Project Engineer PPMIU Engineer
Contractor
3.0 This forms shall be attached to the Inspection Request Form (IRF).