Domain.CFG
This file is a part of bin directory created after TMS configured which maintains TD information means all the systems information taken place in TD. Incase this file has been corrupted, has to be regenerated by TMS tool, but should not be edited manually.
Transport Profile
It is a configuration file of transport domain resides in bin directory gets created by the system when TMS got configured. This transport profile TP_DOMAIN_SID.PFL, which contains all the system
information includes SID, Common transport directory, DB type and DB information, etc in terms of parameters and values. As per the configuration settings maintained in transport profile we are required to use different unconditional modes upon the requirement when importing a TR in to a specific system.
Mention SID and Description and save and repeat the same for other virtual systems also.
Consolidation Route
The route obtained between integrated system and consolidation system is known as consolidation route.
Delivery route
The route obtained between consolidation system to recipient system is called as delivery route.
In case more than one system configured at consolidation level or recipient level, more than one consolidation route or delivery route cannot be created by assigning single transport layer. In this situation, grouping all consolidation systems with naming format /Name/ is called as target group. Now consolidation routes are targeting to this group, from the group to all the consolidation systems route obtained automatically so that a TR which has released an integrated system will be exported to all the systems in the group then can be imported into all. 1. Go to STMS Transport routs Graphical Editor change Drag and drop all the system boxes into
the below area which are required to be configured with the routes. 2. Go to Edit Transport Layer Create Create a customized layer with Z<SID> format. 3. Go to Edit Transport route Create Drag the route to consolidation system 4. Select Consolidation route give standard transport layer name continue 5. Perform the above for delivery route 6. Then y y y y y y y Save So above configuration can be saved then distributed to all the systems in network.
As per the above configuration TMS setup will allow developers to customize R/3 objects and create a TR with the target of quality system. Once the TR is released it will be exported to target system (QAS). As QAS and PRD being as virtual systems a TR could not be imported in to those databases. After quality and production servers are installed as a part of TMS configuration we need to give the information of TDC which is DEV system in QAS and Production systems. Then Log on to TDC go to STMS SAP system Approve. Systems Overview select virtual systems(QAS,PRD) go to
Distribute and activate the configuration to all the systems in landscape so that all three systems in the landscape created in TDC are copied to other system (QAS, PRD). After this is done, TR import is possible in QAS and PRD systems.