Permit to Dump
Permit to Dump
This permission for loading/unloading is given to for a single day from ..........AM/PM to….......AM/PM for the
Date........................
Sr.
Check Points Yes No Remark
No.
1 Is floor Condition of loading/unloading area levelled?
2 Is Surface of loading/unloading area sufficiently compacted?
Is approach for the movement of the dumpers free from any
3
obstacle/ Spillage/ Pot holes/ water logging etc.
Does the dumper deployed for unloading activity have all key
4 safety features like- Dala raise interlock, Reverse camera, anti-
tilt device, Driver Fatigue Monitoring System?
Is illumination level at loading/unloading area sufficient as per
a r d
5
statutory norms?
n d
ta
6 Is Load profile evenly spread throughout the Dala?
Type of Material to be handled (Dry / Wet)
7
S
(for wet material, safe method of removal of residual sticky
material from dala should be mentioned in SOP)
d
8
unloading point?
a l i
Is there any moving machinery deployed under loading/
9 V
Is Toe wall /Berm Provided at the Edges
(excluding places where unloading activity is to be carried out at
ground level)
Sufficient space available for safe unloading w.r.t. number of
10
vehicles deployed
Specific to RM Division
11 Berm provided across the ramp
(except unloading at ground level)
12 Is there any presence of Surface Run-off?
In case of any deviation found in the checklist, necessary corrections need to be taken before issuing the
work permit.
1. …………………………………………………………………………………………………………………
2…………………………………………………………………………………………………………………..