Sch B Offshor

Uploaded by

RAKESH PRAJAPATI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Welcome to (n)Procure Tender Management System Page 1 of 9

Bill Of Quantity (BOQ)


Note: All Dates are in dd/mm/yyyy hr:min as per Indian Standard Time (IST)

Tender Details
IFB / Tender Notice No. : Tender Notice No-1 of 2011-12 Tender ID : 69914
Constructing canal earth work, lining, structures
and service roads including maintenance &
Name of Work : repair works (for five (5) years) for distributaries ECV(INR) : 286,436,847.76
(D-13 to D-17) and its minors of Morbi branch
canal from Ch. 44 to 65 km.
Last Date & Time For Submission of Bid: 24/01/2012 18:00:00

Company Name : offshore infrastructures limited


BOQ Details
Estimated Submitted
Item SubmittedRate
S.No. Item Description Qty Unit Rate Rate Total Amount
No. in Words
(C) (A)
Clearing the canal land
width including
removing the trees ,
bushes, shrubs etc
1. E-1 113.3900 ha 987.0000 500.0000 five hundred 56,695.0000
including depositing
the materials outside
the canal land width as
directed etc complete.
Stripping the canal
construction width and
borrow areas in all
sorts of soil, soft and
2. E-2 hard murrum including 1,07,405.0000 m3 23.0000 25.0000 twenty five 26,85,125.0000
depositing the stripped
material as and where
directed within a lead
upto 200 m.
Excavation of canal in
all sorts of soil
including yellow, sand
and gravely soils and
murrum including
depositing the
excavated stuff in
E-3
uniform layers in
3. (A) 65,472.9100 m3 106.0000 53.0000 fifty three 34,70,064.2300
banks as and where
(a)
directed including
dressing the section
etc.complete for lead
upto 1 km and all lift .
(a) Canal having
capacity upto 1.50
cumecs
Excavation of canal in
all sorts of soil
including yellow, sand
and gravely soils and
murrum including
depositing the
excavated stuff in
uniform layers in
4. (b) banks as and where 68,735.4000 m3 70.3000 53.0000 fifty three 36,42,976.2000
directed including
dressing the section
etc.complete with all
lifts and lead upto 1
km .(b) Canal having
capacity beyond 1.50
cumecs and less than
8.50 cumecs.

Earthwork in
embankment by pad
method using selected
soil, soft & hard
murrum excavated
from approved borrow
area / village tanks

https://ssnnl.nprocure.com/asp/tmsv2/worldbankworks/ViewSupplierBOQRate.asp 17-02-2012
Welcome to (n)Procure Tender Management System Page 2 of 9

etc. after clearing the


site and stripping the
borrow area excluding
royalty
charges,conveying and
spreading in uniform
layers of 15cm to
20cm. thickness and
using of pad cutting
5. E-4 3,62,242.0800 m3 71.8500 53.0000 fifty three 1,91,98,830.2400
excavated soil, soft &
hard murrum in
embankment after
compaction , breaking
clods and dressing to
designed canal section
etc. with all lifts and
varying lead upto 3.0
km .
Compacton of earth
work in embankment
in uniform layers at
optimum moisture
content to required dry
6. E-5a density including 4,21,415.2500 m3 7.5500 9.0000 nine 37,92,737.2500
watering, rolling with
suitable type of roller
of specific capacity etc
complete. (a) 95 %
FDD
(b) Above key level
7. E-5b 61,695.5500 m3 6.0500 7.0000 seven 4,31,868.8500
(85% density)
Providing and fixing
KM stone of size 45cm
X 30cm X 90cm in
cement concrete
bedding in grade 1:3:6
along the main canal
alignment at an eight hundred
8. E-6 145.0000 Nos 805.5500 850.0000 1,23,250.0000
interval of 1.00 km fifty
including
transportating to site
and fixing in position
and engraving
chainage and painting
etc comp.
Trimming of the canal
section manually for
preparing sub grade
for laying cement
concrete (C.C.) lining
9. L-1 in all sort of soils and 2,82,995.3000 m2 24.8000 25.0000 twenty five 70,74,882.5000
murrum including
watering and
compacting bed and
side slopes etc
complete.
Providing and laying
plain cement concrete
lining of M-15 grade in
bed, side slopes and
curvature including
batching, mixing,
transporting, placing,
vibrating, smooth
L-2 two hundred
10. finishing, curing 45,382.5500 m2 256.9000 250.0000 1,13,45,637.5000
(a) fifty
including dewatering
where required .
(manually with
conventional mixer)
Cement level 240 kg.
(a) 7.5 cm thick lining
in bed with water
curing
(b) 7.5 cm thick lining
L-2 two hundred
11. in slope with 2,23,628.4300 m2 276.2000 260.0000 5,81,43,391.8000
(b) sixty
membrane curing

Providing and laying


reinforced cement
concrete lining of M-15
grade in bed, side
slopes and curvature
including batching,
mixing, transporting,
placing, vibrating,

https://ssnnl.nprocure.com/asp/tmsv2/worldbankworks/ViewSupplierBOQRate.asp 17-02-2012
Welcome to (n)Procure Tender Management System Page 3 of 9

smooth finishing,
curing including
dewatering where
required as directed
etc. complete.
L-3 three hundred
12. (manually with 2,313.7500 m2 403.6500 316.0000 7,31,145.0000
(a) sixteen
conventional mixer)
Cement level 240 kg.
(a) 12.5 cm thick
lining in bed with
water curing
(b) 12.5 cm thick
L-3 three hundred
13. lining in slope with 11,271.4300 m2 426.1500 325.0000 36,63,214.7500
(b) twenty five
membrane curing
Providing and filling
the bituminous sealing
compound of approved
make in the expansion
and contraction joints
14. L-4 80,211.0000 m 33.6500 50.0000 fifty 40,10,550.0000
in cement concrete
lining work including
clearing the joints with
air water jet etc.
complete.
Providing and laying
M15 grade plain
concrete of cement,
sand and crushed
metal for 0.75 m wide
step on the canal
slopes with 0.10 m
wide side wall
two hundred
15. L-5 including dressing the 720.0000 No. 146.9000 234.0000 1,68,480.0000
thirty four
sub grade to correct
profile, mixing,
placing, vibrating form
work, finishing and
curing the concrete
etc, complete as per
drawing with all leads
and lift.
Providing and placing
in position
reinforcement bars
including cutting,
sixty one
16. L-6 bending, welding joints 49.5700 MT 46,680.3000 61,000.0000 30,23,770.0000
thousand
where necessary,
hooking etc. complete
as per drawing for all
leads and lifts. (B) TMT
Excavation for
foundation in all sorts
of soil including yellow
sandy & gravelly soils,
soft and hard murrum
etc. including
S-1 depositing the
17. 27,262.0900 m3 61.2000 54.0000 fifty four 14,72,152.8600
(a) excavated stuff in
uniform layers in
banks or as and where
directed etc. complete
for lead upto 1 km and
all lift (By machinery)
(a) Above water table.
Excavation for
foundation in SOFT
ROCK including
depositing the
S-1 excavated stuff as and one hundred
18. 3,205.4800 m3 120.9000 120.0000 3,84,657.6000
(b) where directed etc. twenty
complete for lead up to
1.0 Km and all lift( By
machinery) (a) Above
water table

Excavation for
foundation in HARD
ROCK including
blasting and chiseling
S-1 if necessary sorting two hundred
19. 1,603.7600 m3 216.3000 250.0000 4,00,940.0000
(c) out and stacking fifty
seperately the usable
rubble, depositing the
excavated stuff etc.
complete for lead upto

https://ssnnl.nprocure.com/asp/tmsv2/worldbankworks/ViewSupplierBOQRate.asp 17-02-2012
Welcome to (n)Procure Tender Management System Page 4 of 9

1.0 Km and all lift( By


machinery) a Above
water table
Backfilling the
foundation trenches
around the structures
etc with selected
20. S-2 2,911.1900 m3 17.3500 25.0000 twenty five 72,779.7500
excavated stuff
including watering,
ramming, compacting
etc. complete.
Providing and laying
plain ordinary portland
cement concrete of M-
15 grade with cement,
sand and coarse
aggregates including
centering, shuttering,
batching, mixing,
transporting, placing,
three thousand
21. S-3 vibrating, smooth 3,401.9600 m3 3,545.1000 3,800.0000 1,29,27,448.0000
eight hundred
finishing, curing etc.
complete. (Footing of
barrel, Pier, Abutment,
Column, Return wall,
Chute wall, Transition
wall etc.
(Reinforcement to be
paid seperately).(a)
Cement Level 240 Kg.
Providing and laying
reinforced ordinary
cement concrete of M-
15 grade with cement,
sand and coarse
aggregate including
centering, shuttering, ,
batching, mixing,
transporting, placing,
vibrating, smooth four thousand
22. S-4 12,616.7100 m3 4,037.1000 4,200.0000 5,29,90,182.0000
finishing, curing etc. two hundred
complete. (For pier,
abutment, Wing wall,
glacies, R.C.C well
coping, ring beam,
R.C.C slab, approach
slab, barrel etc.)
(Reinforcement to be
paid seperately).(a)
Cement Level 240 Kg
Providing and laying
ordinary portland
cement concrete M-20
grade with cement,
sand and coarse
aggregate including
centering, shuttering,
batching, mixing,
transporting, placing,
vibrating, smooth four thousand
23. S-5 1,556.9300 m3 4,385.5000 4,400.0000 68,50,492.0000
finishing, curing etc. four hundred
complete (For pier,
abutment, wing wall,
breast wall, dirt wall,
retaining wall, glacies,
R.C.C. slab, approach
slab, barrel.
(Reinforcement to be
paid seperately). (a)
Cement Level 300 Kg
Providing and placing
in position
reinforcement bars
including cutting,
sixty one
24. S-6 bending, welding joints 146.0600 M.T. 46,680.3000 61,000.0000 89,09,660.0000
thousand
where necessary,
hooking etc. complete
as per drawing for all
leads and lifts. (B) TMT

Providing and fixing in


position (different
diameter) I.S., NP-3
class reinforced pipe
with caulking the joints

https://ssnnl.nprocure.com/asp/tmsv2/worldbankworks/ViewSupplierBOQRate.asp 17-02-2012
Welcome to (n)Procure Tender Management System Page 5 of 9

with cement mortar


1:1 proportion, using
jute string soked in
cement slurry,
finishing joints and
S-7
25. laying pipes to the 267.5000 m 496.6000 900.0000 nine hundred 2,40,750.0000
(a)
designed grade and
levels, curing etc.
complete for all leads
and lifts. (a)NP-3 class
300 mm dia pipe
S-7 (b)NP-3 class 450 mm one thousand
26. 57.5000 m 927.9000 1,400.0000 80,500.0000
(b) dia pipe four hundred
S-7 (c)NP-3 class 600 mm two thousand
27. 662.5000 m 1,444.6500 2,300.0000 15,23,750.0000
(c) dia pipe three hundred
S-7 (d)NP-3 class 750 mm three thousand
28. 405.0000 m 2,146.8500 3,100.0000 12,55,500.0000
(d) dia pipe one hundred
S-7 (e)NP-3 class 900 mm four thousand
29. 430.0000 m 2,738.0500 4,700.0000 20,21,000.0000
(e) dia pipe seven hundred
S-7 (g)NP-3 class 1200 five thousand
30. 95.0000 m 4,729.7000 5,500.0000 5,22,500.0000
(g) mm dia pipe five hundred
Providing and fixing
marble plate of 20 cm
x 15 cm x 2.54 cm
31. S-8 thick including 287.0000 No. 201.3000 500.0000 five hundred 1,43,500.0000
engraving and filling
oil paint for letters as
directed.
Providing and fixing in
position canal data
boards of standard size
1.2 m x 0.9 m with
M.S. angle 40 mm x
40 mm x 6 mm with 3
mm thick iron plate, two thousand
32. S-9 477.0000 No. 3,753.0000 2,800.0000 13,35,600.0000
3m in height in 1:5:10 eight hundred
proportion concrete
block size 40 cm x 40
cm x 75 cm Including
painting existing data
on the board etc.
complete as directed.
Providing and fixing in
position 450 mm wide
steps (for ladder) of 28
mm diameter bars at a
spacing of 30 cm c/c one hundred
33. S-10 16,344.0000 No. 246.5000 175.0000 28,60,200.0000
with M.S. angle frame seventy five
of 40 X 40 X 6 mmsize
including painting the
same with two coats of
oil paint etc. complete.
Providing and fixing
M.S. steel grill with
angle frame for head
regulator including
fixing arrangement
seventy
34. S-11 supports etc. as per 26.1000 M.T. 62,942.0000 70,000.0000 18,27,000.0000
thousand
design, oil painting
with one coat of primer
and two coat of
approved oil paint etc.
complete.
Providing and fixing 5
mm thick enamelled
gauge plate including two hundred
35. S-12 196.2300 m 284.4500 250.0000 49,057.5000
necessary gradation in fifty
white and blue etc.
complete.16 mm wide.
Providing 300 mm
thick pucca rubble
pitching in C.M. 1:5
proportion with the
36. S-13 surface pointed with 2,901.5300 m2 631.7000 500.0000 five hundred 14,50,765.0000
cement mortar of 1:3
proportion etc.
complete for all leads
and lifts.

Providing and fixing


M.S. shutter of 3.15
mm thick as per
drawing and including

https://ssnnl.nprocure.com/asp/tmsv2/worldbankworks/ViewSupplierBOQRate.asp 17-02-2012
Welcome to (n)Procure Tender Management System Page 6 of 9

fabrication, fixing in
position, and applying
two coats of red oxide
37. S-14 tagged by chain to 25.3100 m2 1,585.5000 2,000.0000 two thousand 50,620.0000
anchor bar embedded
in cement block etc. as
directed.
Earthwork in
embankment using
selected soil, soft &
hard murrum
excavated from
approved borrow
area / village tanks
38. S-15 etc. conveying, 3,203.1000 m3 71.8500 60.0000 sixty 1,92,186.0000
spreading in uniform
layers, breaking clods
and dressing to the
designed canal section
etc. with lead upto 3
km and all lift.
Excluding Royalty.
Compaction of
earthwork in
embankment in
uniform layers at
optimum moisture
39. S-16 content to required dry 3,203.1000 m3 7.5500 9.0000 nine 28,827.9000
density including
watering, rolling with
suitable type of roller
of specified capacity
etc. complete. )
Providing and fixing
guard stone of size 20
40. S-17 cm x 20 cm x 75 cm 214.0000 No. 68.6000 70.0000 seventy 14,980.0000
including white
washing in two coats.
Providing temporary
moterable service road
during construction
including cleaning the
seventeen
S-18 site in 7m width,
41. 11.2000 Km 19,013.0000 17,500.0000 thousand five 1,96,000.0000
(a) cutting undulations,
hundred
filling depressions,
watering & maintaining
the same etc.
complete (a) CTC
seventeen
S-18
42. (b) VRB 1.4000 Km 19,013.0000 17,500.0000 thousand five 24,500.0000
(b)
hundred
Providing and laying
wearing coat 100 mm
thick at center and 50
mm thick at ends of
compacted asphaltic
concrete with tack coat
of 0.50 Kg/m2 using
stone aggregates as
per gradation and
asphalt at 6.5% (which
will vary as per design
of mix in laboratory) to
43. S-19 51.6900 m2 711.2000 1,000.0000 one thousand 51,690.0000
have the required
specific gravity of the
compacted final mix by
weight of total mix per
binder by hot mix hot
laid process including
consolidation and
providing required
plant and machinery,
cost of fuel, oil,
lubricant, labour
charges etc. complete.
Dismentalling the
existing metal road
surface including
44. S-20 73.7600 m2 29.6000 25.0000 twenty five 1,844.0000
disposing off the
dismentalled material
as directed.

Providing and fixing


post and 38 mm dia

https://ssnnl.nprocure.com/asp/tmsv2/worldbankworks/ViewSupplierBOQRate.asp 17-02-2012
Welcome to (n)Procure Tender Management System Page 7 of 9

pipe railing as per


detailed drawing
including angle iron
post of size 80 mm x
50 mm x 10 mm fixed
in C.C. block (1:3:6) of
two thousand
45. S-22 size 0.30 m X 0.30 m 202.9400 m 1,672.6000 2,800.0000 5,68,232.0000
eight hundred
X 0.30 m etc. as per
specifications including
3 coats of oil painting
to steel work and as
directed etc. complete.
(b) Four rows
Collecting, carting and
stacking 40 mm to 63
mm size metal (on
seven hundred
46. S-23 road side) including 353.9500 m3 942.4500 768.0000 2,71,833.6000
sixty eight
filling the standard size
boxes as directed for
all leads and lifts.
Labour charges for
spreading 40 mm to
63 mm size metal (on
road side) to the one hundred
47. S-24 353.9500 m3 68.1000 150.0000 53,092.5000
required grade and fifty
camber including
barreling etc.
complete.
Collecting, carting and
stacking soft murrum
(on road side)
48. S-25 118.0100 m3 108.1500 100.0000 one hundred 11,801.0000
including filling the
standard size boxes as
directed.
Labour charges for
49. S-26 spreading soft murrum 118.0100 m3 41.2000 35.0000 thirty five 4,130.3500
as directed
Consolidation WBM
surface with roller two and fifty
50. S-27 1,972.7000 m2 3.9000 2.5000 4,931.7500
including watering etc. paise
complete as directed.
Manufacture, supply
and erection of vertical
gate consisting gate
leaf, stiffners, rubber
seal, embedded parts
as shown in drawing
including performance
test and all cost of
S-28 materials fabrication, two lacs forty
51. 1.0000 No 2,49,306.0000 2,49,000.0000 2,49,000.0000
(a) painting, erection in nine thousand
position with all
accessories, second
stage concreting etc.
complete as per
drawing and
specification. A) Pipe
mtype Gate (1) 1.53 m
x 1.53 m
S-28 one lac sixty
52. (3) 1.20 m x 1.20 m 23.0000 No 1,53,360.0000 1,60,000.0000 36,80,000.0000
(c) thousand
S-28 seventy
53. (4) 0.80 m x 0.80 m 27.0000 No 68,160.0000 70,000.0000 18,90,000.0000
(d) thousand
Excavation of canal in
all sorts of soils
including yellow sandy
and gravelly soils,soft
and hard murrum
including depositing
the excavated stuff in
54. R-1 21,850.9200 m3 106.0000 54.0000 fifty four 11,79,949.6800
uniform layers in
banks and where
directed including
dressing the section
etc. complete with all
lifts and lead upto 1.0
km.
Collecting, carting and
stacking 40 mm to 63
mm size metal (on seven hundred
55. R-2 21,850.9200 m3 942.4500 768.0000 1,67,81,506.5600
road side) including sixty eight
filling the standard size
boxes as directed.

https://ssnnl.nprocure.com/asp/tmsv2/worldbankworks/ViewSupplierBOQRate.asp 17-02-2012
Welcome to (n)Procure Tender Management System Page 8 of 9

Labour charges for


spreading 40 mm to
63 mm size metal (on
road side) to the one hundred
56. R-3 21,850.9200 m3 68.1000 150.0000 32,77,638.0000
required grade and fifty
camber including
barreling etc.
complete.
Collecting, carting and
stacking soft murrum
(on road side)
57. R-4 7,283.6400 m3 108.1500 100.0000 one hundred 7,28,364.0000
including filling the
standard size boxes as
directed.
Labour charges for
58. R-5 spreading soft murrum 7,283.6400 m3 41.2000 35.0000 thirty five 2,54,927.4000
as directed
Consolidation WBM
surface with roller two and fifty
59. R-6 1,25,580.0000 m2 3.9000 2.5000 3,13,950.0000
including watering etc. paise
complete as directed.
Operation,maintenance
and security of the
Canal canal structures
and gates with all
ancillary system as per
the agreed
norms,terms and
conditions as well as
per the approved
manual of operation
and maintenance as
well as the standard
engineering and
management practices
60. M-1 1.0000 JOB 26,03,971.4300 12,00,000.0000 twelve lacs 12,00,000.0000
for efficent
performance for a
period of five years
( the starting date of
which will be decided
on mutually agreed
basis ) after the date
of issurance of the
completion certificate
for the consruction
contract and on taking
over of works for O &
M.Price for first year
10%
Price for second year
61. M-1 1.0000 JOB 39,05,957.0100 18,00,000.0000 eighteen lacs 18,00,000.0000
15%
Price for third year
62. M-1 1.0000 JOB 52,07,942.6900 24,00,000.0000 twenty four lacs 24,00,000.0000
20%
Price for fourth year
63. M-1 1.0000 JOB 65,09,928.3600 30,00,000.0000 thirty lacs 30,00,000.0000
25%
64. M-1 Price for fifthyear 30% 1.0000 JOB 78,11,914.0300 36,00,000.0000 thirty six lacs 36,00,000.0000
SubWork Total: 26,07,11,057.7700

SubWork Details
S.No. SubWork Name SOR Total Est.Val Total Total
1. Schedule B- EARTH WORK 4,40,53,299.4230 4,40,53,299.4230 3,34,01,546.7700
2. Schedule B- LINING 9,12,99,308.6040 9,12,99,308.6040 8,81,61,071.5500
3. Schedule B- STRUCTURE and SERVICE ROAD 9,90,69,307.9030 9,90,69,307.9030 10,46,12,103.8100
4. Schedule B- WBM ROAD WORK 2,59,75,218.3600 2,59,75,218.3600 2,25,36,335.6400
5. Schedule B- MAINTANANCE and REPAIRS 2,60,39,713.5200 2,60,39,713.5200 1,20,00,000.0000
* 28,64,36,847.8100 28,64,36,847.8100 26,07,11,057.7700
Grand Total
Rebate (in %) NA NA 0.0000
Fixed Deduction Amount : NA NA NA
Net Amount
((Added Subwork Total * (1-Rebate/100)) -
28,64,36,847.8100 28,64,36,847.8100 26,07,11,057.7700
Deducted Subwork Total - Fixed Deduction
Amount) :
*
Added Subwork Total : (Sc+Sc+Sc+Sc+Sc)
Deducted Subwork Total : (dule B+ EARTH WORK +edule B+ LINING +edule B+ STRUCTURE and SERVICE ROAD+edule B+
WBM ROAD WORK +edule B+ MAINTANANCE and REPAIRS )

https://ssnnl.nprocure.com/asp/tmsv2/worldbankworks/ViewSupplierBOQRate.asp 17-02-2012
Welcome to (n)Procure Tender Management System Page 9 of 9

Notes
Schedule B- EARTH WORK
-
Schedule B- LINING
-
Schedule B- STRUCTURE and SERVICE ROAD
-
Schedule B- WBM ROAD WORK
-
Schedule B- MAINTANANCE and REPAIRS
-

Close Export to Excel Print

Powered By: C1India Private Limited Server Time : 17/02/2012 13:01:18