EPOS 10
universal control
unit
savings
ecology
control
communication
VERSATILITY THERMAL CAMERA COMPATIBILITY
Spoken info in customer's native language
Location of roads in the area, and facilities that are on the road (bridges etc.) cause the temperature difference
of the pavement . These differences can be very significant.Without the help of thermal camera operator can not
Single chamber function (auger conveyer spreader, observe these differences and respond to them. In such cases the whole section is covered with more salt than
belt conveyer spreader or chain conveyer spreader) is necessary. This is one of the reasons why thousands of tons of salt are thrown unnecessarily into the
Written and spoken information in customer's native environment . The function of thermal camera is to showactual quantity of spreading material needed and not
the quantity that were estimated.
language;
universal Ergonomic, compact, sturdy case with SMD electronics;
Control panel designed in accordance with EMC
control unit 2004/108/CEE ;
CAN-BUS open communication system according to CEN TC
337/WG3 EN15430-1; Dual chamber function;
Du air temperature
4" LCD graphic screen with textual, sound and spoken warning messages pavement temperature
from parameter change and from sensors on spreader; spreading program selected
Contactless user (driver) identification - registration ability for more user for
single spreader;
Screen backlight sensor - adjusts screen brightness according to cab
illumination ; Changeable
Ch spreading pattern What is thermalspreading?
Programmable for work with more than 10 types of spreading material; - symmetrical spreading pattern; Thermalspreading is automatic mode of spreading in
Spreading width changeable from 1.5 to 9 meters in 0.5 meter steps, for left which the amount of spreadnig is automatically
determined by the measured pavement temperature
and right asymmetry;
and the selected program.
Changeable pre-wetting material quantity - 10% do 40% easy adjustable
during driving, without entering the panel setup;
Connectable signal from snow plough;
Auto calibration capability; Thermal cameras spreading curves for EPOS 10
40
Adjustment of spreading quantity (dry and wet material) and width by
highly precise closed regulation circuits; Left spreading track asymmetry; 35
Large memory stores plowing and spreading data for minimum last 200
30
hours without erasing;
Memory card for download, storage and data transfer, but also for control
Quantity [g/m2]
25
unit programming is standard, USB memory stick;
Serial, RS232 interface, available for spreading data transfer from control unit 20
to the base - additional GSM/GPRS mobile unit needed ;
Software compatible and programmable for work with thermo camera; 15
Righ spreading track asymmetry;
Right
Automatically generates various reports;
WLR – Whole Life Report; 10
Etc....
5
0
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 - 4 -3 -2 -1 0 1 2 3 4 5 6 7
Temperature [Co]
Wo
Working with the thermal camera;
The most important advantages of thermalspreading are:
up to 30% material savings in spreading
significantly reduces environmental pollution
optimal spreading in accordance with actual needs greatly increases the safety of traffic on the roads
USB PORT RS 232 PORT
online GPS-GPRS system
REPORTING RASCO-MOBILISIS web application
Reports examples (on users native language):
- Report from EPOS 10 control unit shown on PC display using Rasco EPOS Utilities software;
Report by section
# wet material total amount total duration total distance
(l) (km)
1 CaCl2 45 6min 4.4
Amount of pre-wetting material used
total amount total distance
# dry material (kg) total duration (km)
1 COARSE SALT 943 27min 19.1
Amount of dry spreading material used
amount (kg): amount (l): traveled traveled traveled duration: duration: duration:
# road dry material wet material distance (km): distance (km): distance (km): driving spreading plowing
driving spreading plowing
1 0020 406 34 12.0 7.0 2.0 36min 14min 7min
large number of different reports directly on the LCD screen of the EPOS 10;
reports on the amount of all types of materials spreaded per section, day, month, year or throughout the
lifetime of the device
reports on the operating time spent on driving, spreading and ploughing per section, day, month, year or
throughout the lifetime of the device
if the device is handled by two or more operators (drivers) it is possible to get all of the above information
separately for each operator(driver)
reports can be read directly on the LCD screen of the control unit or transferedto a memory card (USB
memory stick) and archived as solid and unchangeable record on the PC in the user databaseaja EPOS 10 is equipped with RS 232 serial interface used for GPS - GPRS module connection with purpose of monitoring and
data transfer from control unit to the base.
Software solution is RASCO - MOBILISIS web application that in user’s native language allows:
Report by driver online monitoring of fleet vehicles in winter service
traveled traveled traveled online insight into the current position of each vehicle in fleet
amount (kg): amount (l): distance (km): distance (km): distance (km): duration: duration: duration:
# user dry material wet material driving spreading plowing driving spreading plowing online insight into the activities of each vehicle in the winter service fleet (current activities and used parameters)
archiving of all data on the activities of each vehicle in fleet (route - section - map, information on activities at every point
1 (rasco) 2 0 2.0 2.0 0.0 17min 1min - of section)
all data is archived and unchangeable and can be used as evidence in the case of a dispute caused by activities on the
A report on the operating time with EPOS 10 road
large number of reports that are archived can be linked to a section, vehicle, driver, spreading material, time spent
value duration traveled distance (km) spent material (kg,l) driving, time spent working with the spreader, time spent working with the snowplough, etc.
Drive 1h 38min 32.0 -
Spreading 27min 19.0 -
Kolodvorska 120 b, HR-48361 Kalinovac Dealer
Spreading - chamber 1 27min 19.0 943 tel: +385 (48) 883 112; fax: +385 (48) 280 146
Spreading - chamber 2 - 0.0 0 e-mail: [email protected]
Spreading - wet 6min 4.0 44
www.rasco.hr
Plow work 10min 5.0 -
Main plow work 10min 5.0 -
Side plow work - 0.0 -