Please indicate whether each of the following statements is true or false by circling ‘T’ for
True or ‘F’ for False. If false, provide correct answer in the box below each statement. [1
mark each]
T F Gathering Data is done during the concept phase of the project [1 mark]
T F The work content of a WBS item is the sum of the WBS items below it. [1 mark]
Page 2 of 7
MENG 3446 Midterm 1 Fall 2022
Activity
Mean Variance
5 0.333
A
7 2.167
B
4 0.444
C
3 1.333
D
6 0.333
E
4 1
F
5 1.333
G
6 0.875
H
Page 3 of 7
MENG 3446 Midterm 1 Fall 2022
b. [3 marks] Draw the activity on arrow network based on the mean duration of the
project.
D(3,1.333,90,1)
C(4,0.444,30,3)
c. [2 mark] Determine the critical path and the minimum duration required for project
completion and its associated variance.
ADF 12 2.666
AGH 16 2.541
BEGH 24 4.708
CGH 15 2.652
Minimum
Critical Duration 4.708
BEGH 24 Variance
Path for Project
Completion
d. [3 marks] Determine the project duration of the project with a confidence level of
92%.
Mean = 24 Variance= 4.708 Standard Deviation= 2.169 [0.5 mark]
P(Z) = 0.5- 0.92/2 = 0.04 [1 mark] From Table Z = 1.75 [0.5 mark]
Project duration with 92% confidence is 24 ± 1.75 (2.169)
20.2 ≤ X ≤ 27.8 [1 mark]
Page 4 of 7
MENG 3446 Midterm 1 Fall 2022
Page 5 of 7
MENG 3446 Midterm 1 Fall 2022
e. [4 marks] Draw the activity on node diagram based on the mean duration of the
activities.
0 5 5 8 8 12
8 A 5 12 D 3 12 F 4
8 13 17 20 20 24
0 7
Dummy 0 B 7 7 13 13 18 18 24
0 7 0 E 6 0 G 5 0 H 6 Dummy
7 13 13 18 18 24
0 4
9 C 4
9 13
f. [2 marks] Determine the amount of total slack and free slack for each activity with
slack.
Page 6 of 7
MENG 3446 Midterm 1 Fall 2022
g. [6 marks] Draw the Gantt Chart, the cost profile, and the resource profile based on the
mean duration.
A 80 (2)
B 100 (1) 2 marks layout and data
C 30 (3)
D 90 (1)
E 80 (1)
F 40 (2)
G 70 (1)
H 50 (2)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
220
Cost Profile
210
200
190
1 mark $/day
180
1 mark Profile
170
160
150
140
130
Cost ($)
120
110
100
90
80
70
60
50
40
30
20
10
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
10
Resource Profile
9
8
2 marks profile
7
Resources
5
4
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Page 7 of 7