Số: 96/QĐ-HĐTV
Number: /QĐ-HĐTV Hanoi,
Hà date05 tháng
Nội, ngày 2023
9 năm 2023
month
DECISION
On promulgating Technical Standards for voltage distribution transformers
35kV applied in Vietnam National Electricity Group
DECISION:
Article 1.Issued together with this Decision are the Technical Standards for
distribution transformers up to 35 kV applied in the Vietnam National Electricity
Group. The standard symbol is: TCCS 01:2023/EVN.
Article 2.This Decision takes effect 15 days after the date of signing and
promulgation. Decision No. 62/QD-EVN dated May 5, 2017 of Vietnam Electricity
Group on promulgating Technical Standards for distribution transformers up to
35 kV in Vietnam Electricity Group ceases to be effective from the date this
Decision takes effect.
Article 3.The General Director, Deputy General Directors, Chief Accountant,
Heads of Departments under the EVN Board of Members, Chief of Office, Heads
of Departments of EVN Agencies, Heads of units under EVN, Subsidiaries in
which EVN holds 100% of charter capital (Level II LLC), Subsidiaries in which Level
II LLC holds 100% of charter capital; Representatives of EVN's capital, of Level II
LLC at joint stock companies, LLCs; relevant organizations and individuals are
responsible for implementing this Decision./.
Dang Hoang An
1
INDEX
TECHNICAL STANDARDS
DISTRIBUTION TRANSFORMERS UP TO 35 KV APPLIED IN
VIETNAM ELECTRICITY GROUP
(TCCS 01:2023/EVN)
PART I
GENERAL PROVISIONS
1. Scope of adjustment
2. Applicable subjects:
level II).
International.
4
3. ASTM (American Society for Testing and Materials): American Society for Testing and Materials
8. MBA: Transformer.
Other terms and definitions are understood and explained in TCVN 6306-1:2015 and
Electrical Equipment Regulations 2006 issued with Decision No. 19/2006/QD-BCN dated July 11,
2006 of the Ministry of Industry (now the Ministry of Industry and Trade) and subsequent
amendments, supplements and replacements.
Diagram 3 phase
Frequency (Hz) 50 50
PART II
TECHNICAL REQUIREMENTS
Chapter I
1. The MBA is a closed, 1-phase type (primary rated voltage 12.7 kV), machine core
Oil immersed and fully oil charged, natural air cooled type (ONAN).
1. The transformer housing must be designed to ensure that it can be lifted and transported.
without deformation, damage or oil leakage.
2. The case is completely sealed with bolts and lid tightening straps
machine and no auxiliary oil tank.
3. The bottom of the machine case is circular. The machine case must have a crane hook for transportation and a hook
4. The material used to make the machine shell is high-strength steel, with a thickness that ensures it can withstand pressure.
internal pressure (minimum 49 kPa for 8 hours) in normal and fault operating
conditions and protected against explosion by a pressure valve. The pressure valve shall
comply with IEC 60076-22-1. The working pressure of the valve shall be suitable for the
design of the transformer casing.
5. The gas cushion in the machine housing must have enough volume for the oil to expand.
expands when the oil temperature changes during operation or due to impacts
from normal operations (loading, transporting, etc.) or during testing.
6. Grounding for the machine is done for the magnetic circuit and the machine case, ensuring contact
solid electrical contact. The machine case grounding pole is located at the bottom of the tank.
8
low voltage bushing side and marked with earthing symbol. Earthing must be secured with bolts with
threads not smaller than M12.
8. The color of the exterior paint of the case must ensure heat dissipation.
of the transformer as well as avoiding heat absorption from sunlight (light
grey, colour code refer to RAL 7046).
9. For transformers installed in high salinity areas such as
In coastal areas, islands, etc., transformer casings must be treated against rust by hot-dip
galvanizing, with the thickness of the plating layer in accordance with TCVN 5408:2007. When the
transformer casing has been hot-dip galvanized, electrostatic painting as required in Clause 7 of
this Article shall not be applied.
10. The MBA sealing gasket must be made of material resistant to insulating oil.
Withstands mechanical vibration, heat and humidity, suitable for outdoor
working conditions. Technical standards of gaskets are as follows:
a. Swelling in transformer oil of gasket after 96 hours at 80oC: no
more than 02% (tested according to TCVN 2752:2008).
11. Terminals, terminal clamps for primary, secondary and power line conductors
Grounding made of tin-plated or silver-plated copper or brass.
12. Electrically carrying parts such as: ceramic rods, nuts, and copper washers
or brass.
13. Non-electrical parts such as bolts, nuts, washers, etc.
stainless steel or hot dip galvanized steel.
Article 6. Magnetic core and coil
1. The magnetic core is made from electrical steel sheet material (cold rolled silicon steel).
isotropic). The steel sheets are insulated on both sides and have no burrs.
or equivalent.
a. Two (02) similar half coils, rated voltage of each coil is 0.23
kV, the capacity of each low voltage coil is equal to 1/2 of the transformer capacity,
connected to the outside by 4 low voltage bushings and connected in parallel or series
depending on the user.
- The transformation ratio is equal or the difference is not more than 0.5%.
4. The core and coil must be tightly fastened to the housing and have a lifting hook for
Lift and remove the core and coil from the housing. The coil must be designed to be
removed from the core when necessary.
1 Manufacturer Be specific
IEC 60296:2020,
4 Applicable standards ASTM D3487: 2016
or equivalent
5 Viscosity, at 40oC mm2/S ≤ 10
clear, bright, no
6 Outside observation
water and impurities
Breakdown voltage
11 + Before filtering and drying: kV ≥ 30
+ After filtering and drying: kV ≥ 70
12 Neutralization value (acidity) mgKOH/g ≤ 0.01
Antioxidant additive
14 %W [0.08 ÷ 0.4]
content
18 Oxidation stability:
Tested by one of the
following methods:
mgKOH/1g
+ Acid value after oxidation < 0.3
oil
mgKOH/1g
+ Acid value after oxidation < 0.3
oil
- GOST 981-75 method: 14
18.4
hours
Not detected
19 PCBs
(allowable < 2 mg/kg)
1. The bushing must withstand the rated current and allowable overload current of the
MBA. The bushings shall be of the outdoor type and shall be of the same type at each voltage level. The
bushings shall be subjected to the high voltage surge test at industrial frequency and the lightning impulse
2. All bushings must be reasonably arranged outside the transformer housing, of the same level.
1. The primary side of the transformer must have a non-electric voltage regulator, with 05 steps.
Adjustment: ± 2 x 2.5%. In case of long lines and unstable voltage, consider using
a transformer with adjustment steps of ± 2 x 5%.
2. The voltage regulator is manually operated on the machine surface, which can be
easily adjusted from the outside without affecting the machine structure, with
clear indications and instructions on site and in the accompanying manual. The
operating handle (step adjustment knob) must be made of stainless alloy
material.
3. The voltage regulator must have a rated current rating ≥ 1.3 times and must
Withstand short-term test ≥ 2.5 times the primary rated current of the transformer.
The machine is located in an easily visible location towards the low-voltage bushing, the numbers are
engraved and covered with non-fading paint. The language on the label is in Vietnamese and/or
English. The machine label is securely attached to the machine housing with rivets or welding, in an
easily visible location.
a. MBA type.
b. Standard number.
e. Year of manufacture.
k. Short circuit voltage (Uk%) includes: Uk% medium voltage coil 12.7 kV/coil
Low voltage 1: 0.23 kV, Uk% medium voltage coil 12.7 kV/low voltage coil 2: 0.23 kV.
2. Each MBA has a unique manufacturing number (Serial number), which is not duplicated. Number
The manufacturing number must be engraved on the machine cover or a suitable location on the machine
case for easy observation from the ground. The size of the manufacturing number on the machine case
must be at least 60 mm and must be painted or decaled in red color that is durable under operating
environmental conditions.
13
3. The sealing lead will be tested and accepted by the Unit responsible for testing and acceptance.
MBA sealed with lead, with a record clearly stating the manufacturing number of each machine and the lead seal code.
the coils).
c. Measure load loss (Pk) and short circuit voltage (Uk%).
d. Measure no-load loss and no-load current at 90% and 110% of voltage
standard
3. Special test
Short-circuit withstand test according to TCVN 6306-5 (IEC 60076-5): The
manufacturer must provide a short-circuit test report performed on a single-
phase transformer sample with a voltage level of 12.7/0.23 (kV) or a three-
phase transformer sample with a voltage level of 22/0.4 (kV) issued by a
testing laboratory of the Short Circuit Testing Liasion (STL).
Article 14. Rated power range
Rated capacity range according to IEC 60076. However, to ensure efficiency for backup
and operation management, choosing switching equipment, 1-phase distribution
transformer 12.7/2 x 0.23 (kV) should choose capacity according to the following range: 15,
25, 37.5, 50, 75, 100 (kVA).
2. The transformer must ensure short-term overload operation higher than the current
In addition, the transformer must ensure overload operation with current higher
than rated up to 40% for a total time of up to 6 hours in one day and night for 5
consecutive days.
The transformer shall be designed and tested with the following insulation levels:
Withstand voltage
Short circuit power frequency
Nominal voltage High voltage basic lightning impulse
withstand voltage
system definition most of all of insulation
term (effective value)
(kV) 1.2/50 -s (peak
(kV)
equipment (kV)
0.23 (0.4) - 3 -
For 1-phase 2-coil balanced transformers (high voltage primary winding > 601 V): The allowable
noise level of the transformer must not exceed the values in the tables below:
The oil/winding temperature rise limit specified above can be adjusted with a
suitable adjustment factor corresponding to the working environment conditions of
the transformer as guided by IEC 60076-2 standard. Based on the actual installation
and operating environment of the transformer, the Unit shall specify the
appropriate oil/winding temperature rise limit.
15 52 213
25 67 333
37.5 92 420
2.0
50 108 570
75 148 933
100 192 1,305
17
Chapter II
1. The transformer housing must be designed to ensure that it can be lifted and transported.
without deformation, damage or oil leakage.
2. The machine housing is completely sealed with bolted connections, with sampling valve
oil, oil level indicator and without auxiliary oil tank (for sealed type transformers) or
equipped with auxiliary oil tank (for open type transformers).
3. The bottom of the machine case is rectangular or oval. The machine case must have a crane hook for transportation.
move and hook to remove the machine cover when needed for inspection.
4. The material used to make the machine shell is high-strength steel, with a thickness that ensures it can withstand pressure.
inside the machine (minimum 49 kPa for 8 hours) in normal operating modes as well as in
case of failure and protected against explosion by pressure valve (for MBA < 1,600 kVA) or
pressure relay (for MBA> 1,600 kVA with primary side circuit breaker).
6. Auxiliary oil tank (for open type transformers) or expansion oil storage mechanism
The expansion valve (for closed type transformers) is connected to the transformer tank.
7. For open type transformers: Within the temperature range of oil in the transformer
From 5°C to 105°C, the capacity of the auxiliary oil tank must be such that the oil in the auxiliary
oil tank does not overflow and is not lower than the bottom of the auxiliary oil tank.
18
The bottom of the auxiliary oil tank has the same height as the medium-pressure bushing head. The auxiliary oil
tank must have a separate anti-humidity breathing mechanism (siphon tank) installed outside.
8. For closed type transformers, the casing must have an expansion oil containment mechanism.
transportation.
10. Grounding for the machine is done for the magnetic circuit and the machine case, ensuring contact
solid electrical contact. The machine case grounding terminal is located at the bottom of the tank towards the
low-voltage bushing and has a grounding symbol. The grounding must be secured with a bolt with a thread not
12. The color of the exterior paint of the case must ensure the ability to dissipate heat.
transformer heat as well as avoiding heat absorption from sunlight
(light grey, colour code refer to RAL 7046).
13. For galvanized transformers installed in saline areas
In areas such as coastal areas, islands, etc., the transformer housing must be treated
against rust by hot-dip galvanizing, with the thickness of the plating layer in accordance with
TCVN 5408: 2007. When the transformer housing has been hot-dip galvanized, electrostatic
painting as required in Clause 11 of this Article shall not be applied.
14. The MBA sealing gasket must be made of material resistant to insulating oil.
Withstands mechanical vibration, heat and humidity, suitable for outdoor
working conditions. Technical standards of gaskets are as follows:
a. Swelling in transformer oil of gasket after 96 hours at 80oC: no
more than 02% (tested according to TCVN 2752:2008).
15. Terminals, terminal clamps for primary, secondary and power line conductors
The grounding terminal is made of copper or brass plated with tin or silver. The secondary terminal is a 2-
hole or 4-hole flat terminal used for connection by means of a compression terminal.
16. Electrically carrying parts such as: ceramic rods, nuts, and washers made of copper
or brass.
17. Non-electrical parts such as bolts, nuts, washers, etc.
stainless steel or hot dip galvanized steel.
Article 23. Magnetic core and coil
1. The magnetic core is made from electrical steel sheet material (cold rolled silicon steel).
isotropic). The steel sheets are insulated on both sides and have no burrs.
or equivalent.
3. The core and coil must be tightly fastened to the housing and have a lifting hook for
Lift and remove the core and coil from the housing. The coil must be designed to be
removed from the core when necessary.
Article 24. Transformer oil:As prescribed in Article 7 of this Standard. Article 25. Cross-
border missions
1. Oil level indicator: The transformer must have an oil level indicator in the tank.
machine. The oil level indicator must be arranged so that the oil level indicator can be
conveniently observed while the transformer is in operation. The oil level indicator must be
marked with the maximum and minimum oil levels corresponding to the oil temperature in the
transformer tank at 105°C and 0°C.
2. Oil temperature indicator on the MBA: A tube must be installed on the machine cover.
oil temperature indicator. Depending on the application, the MBA may be required to be
equipped with a thermometer (fixed needle type) or a gauge to measure the temperature of the
top layer of the MBA oil. The oil temperature indicator must be conveniently located for reading
the index when the MBA is in operation.
20
a. MBA type.
b. Standard number.
c. Manufacturer's name, country and city where the MBA is assembled.
e. Year of manufacture.
d. Measure no-load loss and no-load current at 90% and 110% of voltage
standard
3. Special test
Short circuit withstand test according to TCVN 6306-5 (IEC 60076-5):
The manufacturer must provide a short circuit test report performed on
a 3-phase transformer sample with a voltage level of 22/0.4 (kV) issued
by a testing laboratory of the Short Circuit Testing Liasion (STL).
The transformer shall be designed and tested with the following insulation levels:
22
22 24 50 125
0.4 - 3 -
For 3-phase 2-winding transformers (high voltage primary winding > 1.2 kV): The allowable
noise level of the transformer must not exceed the values in the tables below:
Self-cooled
Power (kVA) Open type Closed type
(Ventilated), dB (Sealed), dB
100 50 55
160 55
180 55 57
250 55
320 60
59
400 60
560 62
61
630 62
750 64
800 64 63
1,000 64
1,250 65 64
23
Self-cooled
(Ventilated), dB (Sealed), dB
1,500 66
1,600 66 65
2,000 66
2,500 68 66
3,200 70 68
The oil/winding temperature rise limit specified above can be adjusted with a
suitable adjustment factor corresponding to the working environment conditions of
the transformer as guided by IEC 60076-2 standard. Based on the actual installation
and operating environment of the transformer, the Unit shall specify the
appropriate oil/winding temperature rise limit.
Load loss
Capacity Loss
(Pk) maximum at Minimum short circuit
norm No load (Po)
coil temperature voltage (Uk) (%)
(kVA) maximum (W)
75oC (W)
Load loss
Capacity Loss
(Pk) maximum at Minimum short circuit
norm No load (Po)
coil temperature voltage (Uk) (%)
(kVA) maximum (W)
75oC (W)
Chapter III
Article 41. Magnetic core and coil:As prescribed in Article 23 of this Standard.
Article 42. Transformer oil:As prescribed in Article 7 of this Standard. Article 43.
d. Measure no-load loss and no-load current at 90% and 110% of voltage
standard
3. Special test
Short circuit withstand test according to TCVN 6306-5 (IEC 60076-5):
The manufacturer must provide a short circuit test report performed on
a 3-phase transformer sample with a voltage level of 35/0.4 (kV) issued
by a testing laboratory of the Short Circuit Testing Liasion (STL).
Rated capacity range according to IEC 60076. However, to ensure efficiency for
backup and operation management, choosing switching equipment, 3-phase
distribution transformer 35/0.4 (kV) should choose capacity according to the following
range: 100, 160, 180, 250, 320, 400, 560, 630, 750, 800, 1,000, 1,250, 1,500, 1,600, 2,000,
2,500, 3,200 (kVA).
Article 51. Overload capacity:As prescribed in Article 15 of this
Standard.
Article 52. Wiring group
The transformer shall be designed and tested with the following insulation levels:
27
Withstand voltage
Short circuit power frequency
Nominal voltage basic lightning impulse
Highest voltage withstand voltage
definition of the system of insulation
of the device term (effective value)
system 1.2/50 -s (peak
(kV) use)
(kV) value) (BIL)
(kV) (kV)
38.5 75 180
40.5
Applicable to
35 kV transformers
35 installed at the
TBA source 80 190
or TBA of
power plants to
35 kV grid
0.4 - 3 -
The oil/winding temperature rise limit specified above can be adjusted with a
suitable adjustment factor corresponding to the working environment conditions of
the transformer as guided by IEC 60076-2 standard. Based on the actual installation
and operating environment of the transformer, the Unit shall specify the
appropriate oil/winding temperature rise limit.
PART III
3. In the process of implementing this standard, if there are any difficulties or problems,
Units, organizations and individuals promptly report to EVN for consideration, supplementation and amendment
as appropriate.
30
APPENDIX
REFERENCES
1. Electrical equipment regulations, issued with Decision No.
19/2006/QD-BCN dated July 11, 2006 of the Ministry of Industry (now the Ministry of Industry and Trade);
2. Circular No. 40/2009/TT-BCT dated December 31, 2009 of the Ministry of Industry and Trade
3. Operation and repair procedures for MBA, issued with Decision No.
623/ĐVN/KTND dated May 23, 1997 of Vietnam Electricity Corporation (now Vietnam
Electricity Group); and subsequent amendments, supplements and replacements.
11. TCVN 7675-1:2007 Specification for specific types of winding wire - Part 1:
Polyvinyl Acetal enameled round copper wire, heat resistance class 105oC.
12. TCVN 7675-12:2007 Specification for specific types of winding wire - Part 12:
Polyvinyl Acetal enameled round copper wire, heat resistance class 120oC.
15. ASTM D3487: 2016: Standard Specification for Mineral Insulating Oil
Used in Electrical Apparatus – Technical standard for insulating mineral oil used
on electrical equipment.
18. IEC 60076-2: Power transformer- Part 2: Temperature rise for liquid-
immersed transformers: Power transformers – Part 2: Temperature rise of
transformers immersed in liquid.
19. IEC 60076-22-1: Power transformer- Part 22-1: Power transformer and
reactor fittings – Protective devices: Power transformers – Part 22-1: Fittings for
power transformers and reactors – Protective devices.
20. IEC 60076-5: Power transformer – Part 5: Ability to withstand short
circuit: Power transformers – Part 5: Short-circuit withstand capability.
21. IEC 60137 Ed. 7.0 b: 2017 Insulated bushings for alternating voltages
above 1 000 V - Insulators for AC voltage above 1kV.
22. IEC 60296 Ed. 5.0 b: 2020 Fluids for electrotechnical applications -
Mineral insulating oils for Electrical equipment – Mineral insulating oils
for electrical equipment.
23. IEC 61125: Insulating liquids - Test methods for oxidation stability -
Test method for evaluating the oxidation stability of insulating liquids in
the delivered state: Insulating liquids – Test method for evaluating the
oxidation stability of insulating liquids in the delivered state
24. IEC 60076-7 Ed. 2.0 b: 2018 - Power transformers - Part 7: Loading
guide for mineral oil-immersed power transformers - Transformers – Part 7: Guide
for loading oil-immersed power transformers.
25. IEC 60076-10 Ed. 2.0 b: 2016 Power transformers - Part 10:
Determination of sound levels - Transformers – Part 10: Measurement of sound levels).
26. IEC 60076-10-1 Ed. 2.1 en: 2020 - Power transformers - Part 10-1:
Determination of sound levels - Application guide CONSOLIDATED EDITION
– Transformers – Part 10-1: Measurement of noise levels – Guidance on application.
27. IEC 60076-20 Ed. 1.0: 2017: Power transformers - Part 20: Energy
efficiency - Transformers – Part 20: Energy efficiency.
32
33. ISO 2063: 2005 Thermal spraying - Metallic and other inorganic
coatings - Zinc, aluminium and their alloys: Thermal spraying – Coatings of metals and other