0% found this document useful (0 votes)
106 views13 pages

QS Tamil Syllabus

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views13 pages

QS Tamil Syllabus

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

C OUR SE SYLL ABU S

MODULE 1
1.1 Introduction QS
• Who is a Quantity Surveyor
• QS Organizational Flowchart
• Entry Level Jobs
• Role of Quantity Surveyor
• Basics of QS Standards

1.2 Excel and AutoCAD Introduction


• Basic Tools of Excel
• General and Navigational
Shortcut Keys of Excel
• Editing and Formatting Shortcut
Keys of Excel
• Basic Formulas
• Basics of AutoCAD
• Basic AutoCAD Tools
• AutoCAD Tool Shortcut Keys to
Manage Workflow and
Drawings
• AutoCAD Tools Toggle General
Features
• Examples for Structural and
Architectural Drawing
• Lineout and Levels
• Assignment
1.3 Basic of Civil Engineering

• Stakeholders
• Construction Components

1.4 Principle of Measurement


International (POMI)
• What is POMI
• Principle of Measurement International
Overview
• Assignment
MODULE 2
BOQ Preparation
• Why BOQ is Important
• What is BOQ
• How to Prepare BOQ
• Sections of BOQ as per POMI
• Why RFI (Request For Information)
Important
• What is RFI
• Why is Finish Schedule Important
• What is a Finish Schedule
• Quantity Take off
• Assignments
MODULE 3
3.1 RA Bill Preparation
• Types of Bills

• What is an Advance Bill?

• When is the Advance Bill Prepared?

• Prerequisite for Advance Payment

• FIDIC Clauses for Advance and RA Bill.

• What is RA Bill?

• When is the RA bill Prepared?

• Procedures of Preparing R.A. Bills

• Documents for RA Bills

• Example(s) for RA Bill

• Assignments

3.2 Final Bill, COP Preparation


• What is the Final Bill?

• FIDIC Clauses

• What is COP/Payment Certificate

• Checking of Bills

• FIDIC Clauses

• Assignment (COP)
MODULE 4
Variations (Change Orders)
• What are Variations or Change Order?

• FIDIC Clauses

• What is Included in Variations

• Instructions that Leads to Variation

• Effects / Impacts on Variation

• Process of Submitting Variation

• Valuation of Variation

• Example for Variations

• Variation Log

• Assignment
MODULE 5
5.1 Tender and Contracts 5.2 Conditions of Contracts
GCC&SCC
• What is Tender
• What is GCC
• Types of Tendering
• Important Clauses
• Tender Package
• Why are General Conditions Useful
• Tender Event Schedule
• What is SCC
• What is Contract
• What are Included in SCC
• Types of Contract • What is Tender Form

• Tender Form Examples

5.3 Work Order and Purchase


Order
• What is a Work Order ?

• Purpose of a Work Order

• Types of Work Orders in Construction

• What is Purchase Order (PO)

• When is a Purchase Order Required

• Things to Include in a Construction PO


MODULE 6
Basics of Value Engineering
• What is Value Engineering

• When Should Value Engineering Take Place

• Methodology

• Construction Stage

• Why is Value Engineering Important?


MODULE 7
Bar Bending Schedule (BBS)
• What is Bar Bending Schedule (BBS)

• Advantages of BBS

• Basis of BBS

• BBS general shapes

• Overlapping

• Development length

• Bend Deduction

• BBS Procedure

• Sample for BBS

• Assignment

MODULE 8
Live project

• Live Projects in the Middle East


MODULE 9
• Industry Interaction Session

• Interactions with Snr. QS to Understand the


Construction Industry

MODULE 10
• BOQ -Preparation - Plan swift
( Medium Of Instruction is English)

From Module 11-14,


Medium Of Instruction is English

MODULE 11
Estimates and Cash flow
• What is Estimation?

• How to prepare estimate.

• Types of estimates.

• How to prepare cash flow

• Cash flow examples

• Types of cash flow


MODULE 12
Rate Analysis
• What is rate analysis

• Why analysis of rates required in construction industry

• How do you calculate rate analysis

• Example - Concrete Rate Analysis

• Example - Labor and material rate analysis

MODULE 13
Project Closeout and Handling Over
• What is project closeout

• Why project closeout is important

• Project closeout process

• Common closeout management mistakes

• Handover of a project
MODULE 14
3M Management
• What is manpower management

• Why effective construction manpower planning is


so important

• Common mistakes happen in construction


manpower management

• Aim of material management

• Objectives and functions of material management

• Process of construction material management

• Problems in material management

• Construction machinery management

• Advantages of utilising construction machineries

• Factors behind selection construction machineries

• Equipment acquisitions