Checklist For Surveying & Setting Out Works For Storm Water Network

Survey works details

Uploaded by

layeeqit57
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views1 page

Checklist For Surveying & Setting Out Works For Storm Water Network

Survey works details

Uploaded by

layeeqit57
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project BARARI AIN AL FAYDAH-PHASE-2- INFRASTRUCTURE WORK SECTOR B

Developer Q Holding

Consultant KN Consultants

Main Contractor ATGC LLC `


Sub Contractor M Power Equipment Rental

Survey and Setting Out for Storm Water Work


WIR No. Location: Date:
Checked by Checked by Checked by
SN Items to be checked Contractor QC Team Consultant Remarks

N/A

N/A

N/A
Yes

Yes

Yes
No

No

No
1 NOC / Permits
2 Use Instrument for surveying work it's calibrated
3 Setting out prior to excavation done and approved

4 All
work
bench mark and control point are confirmed before start excavation

5 Approved drawing / method statement available

6 Formation level is as per approved drawing

7 Pipe line alignment and level verified as per approved shop drawing

8 Verification
drawing
of Manhole/Chamber co-ordinates & level as per approved

Contractor Site Engineer Contractor QA/QC Inspector Consultant Representative

Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

TGC/QAQC/CHK/CVL/PNT/01 REV-00