0% found this document useful (0 votes)
4 views3 pages

Techno Terms (1)

Uploaded by

Rhey Lucero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views3 pages

Techno Terms (1)

Uploaded by

Rhey Lucero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

1. Thermal expansion 44.

CAD operator
2. Site visit 45.Client
3. Soil exploration 46.Subcontractor
4. Moisture content 47.Billing
5. Modulus of elasticity 48.Bidding
6. Blueprint 49.Construction estimate
7. Scale model 50.Construction firm
8. BIM (Building Information 51.Construction plan
Modeling) 52.Joint survey
9. Engineering backfill 53.Commercial availability
10.Caulking 54.Construction site
11.Circuit breaker 55.Hydraulic structures
12.Egress 56.Weathering
13.Insulation 57.Functionality
14.Load-bearing wall 58.Erosion
15.Stucco 59.Scouring
16.Zoning 60.Permeability
17.Change order 61.Durability
18.Project charter 62.Material specification
19.Construction built out 63.Bill of Quantity (BOQ)
20.Foreman 64.Logistic manager
21.General contructor 65.Sales agent
22.Notice to Proceed (NTP) 66.Hydraulic jump
23.Lean construction 67.Time of Concentration
24.Monocrete construction 68.Mechanically Stabilized Earth
25.Performance gap Wall (MSEW)
26.Punch list 69.Retaining wall
27.Purchase order 70.Debris flow
28.Request for Information (RFI) 71.Concrete cover
29.Rubblization 72.Moment of Inertia
30.Scope of Work 73.Soil Nailing
31.Soil stockpile 74.Spotter
32.Dead line 75.Admixture
33.Unit price contracts 76.Building permit
34.Mat foundation 77. As-built plan
35.Wall footing 78.Feasibility study
36.Negotiated procurement 79.Product exhibit
37.Construction schedule 80.Weakly coordination meeting
38.Safety 81.Daily Activity Report (DAR)
39.Hardware 82.Material checklist
40.Supplier 83.Contingency plan
41.Purchasing 84.Workability of concrete
42.Project manager 85.Permeability of soil
43.Civil engineer 86.Precipitation
87.Flow net 130.Elevation
88.Groundwater table 131.Falsework
89.Angle bar 132.Board foot
90.Purlins 133.Break-even
91.Catch basin 134.Reinforce concrete
92.Landscaping 135.Slope protection
93.Compaction test 136.Structural plan
94.Cut and fill 137.Moisture content
95.Batching plant 138.Foundation
96.Man power 139.Clearing and grabbing
97.Building official 140.Demobilization
98.Calibration 141.Site inspection
99.Critical path 142.Excavation
100.Work Breakdown Structure 143.Land reclamation
(WBS) 144.Aggregates
101.Project stakeholder 145.Sieve analysis
102.Project timeline 146.Drilling
103.Project budget 147.Gabion box
104.Kickoff meeting 148.Proper turnover
105.Meeting agenda 149.Commercial building
106.Meeting minutes 150.Steel pipe
107.Meeting follow up 151.Delivery Receipt
108.Resource allocation 152.Sample
109.Risk management 153.Concrete Hollow Block (CHB)
110.Project’s life span 154.mortar
111.Project proposal 155.Truss
112.Deliverable 156.Efficiency
113.Hunch 157.Hardware
114.Network diagram 158.Lumber
115.Request for Extension (RFE) 159.Reinforce Steel Bar (RSB)
116.Inspection 160.General specification
117.Reporting 161.Green building
118.Project coordinator 162.Perspective
119.Statement of Work 163.Crane
120.Status report 164.Delivery truck
121.SWOT analysis 165.Drainage
122.Time management 166.Bridge
123.Concrete curing 167.Vertical structure
124.Perimeter 168.Wall footing
125.Hectare 169.Potable water
126.Cantilever 170.Watershed
127.Contract formation 171.Dam
128.Dead load 172.Right of way
129.Live load 173.Transaction
174.Stock room
175.Bench mark
176.Surveyor
177.Topographic map
178.Tracing paper
179.Prism
180.Gutter
181.Conversion
182.Pedestrian lane
183.Cement
184.Diversion road
185.Roof deck
186.Pulley
187.Gravitational acceleration
188.Discharge
189.Cross sectional area
190.Pavement
191.Gross area
192.Net area
193.Convenience outlet
194.Water closet
195.Fence
196.Fire wall
197.Boulders
198.T-square
199.Drawing table
200.Ventilation

You might also like