0% found this document useful (0 votes)
27 views2 pages

L2_Lightning Protection System

Uploaded by

Syahmi Yacob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views2 pages

L2_Lightning Protection System

Uploaded by

Syahmi Yacob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Discipline : ELectrical

INSTALLATION TEST RECORD Doc. No. :KUL14-RC-XX-E720-WS5-LCM-CX


LIGHTNING PROTECTION SYSTEM Doc. Rev.00
Date (YYYY-MM-DD) :2024-2-7
LEVEL 2 COMMISSIONING FORM

CLIENT: BUILDING ID:

A: EQUIPMENT INFORMATION

Manufacturer Model Number Soil Type

Electrode Material Electrode Length Electrode Depth

Conductor Material Conductor Size

B: TEST AGENCY DETAILS

Test Agency: Testing Supervisor: Organization:

C: INSPECTION & TEST


Verify the following installation quality checks with the equipment de-energized (Power OFF); Verified
Item Description YES NO N/A Comments
1 Visual inspect the complete lightning protection installation

2 Visual correct installation of all lightning current (SPD Type 1) and surge arresters (SPD Type 2)

3 Test all earth terminations for tightness

4 Test all air terminations and down conductors through resistance measurement

5 Test all earth rods / electrodes through resistance measurement

6 All test results to show actual measured results

D: TEST INSTRUMENTION
Please record the calibrated test instrumentation details below
Item Description Manufacturer Model Serial Number Calibration Due Date

1 Earth Tester

2 Clamp On Test Set

3 Torque Wrench

E: TEST RECORDS
Perform torque checks on all bolted connections Verified
Item Description YES NO N/A

1 Record applied torque value and bolt sizes and confirm they are correct
Bolt grade

Bolt size (mm)

Torque applied N.M

Test joint no. 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10 10-11 Comments
Record value (Ω)

Test joint no. 11-12 12-13 13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21
Record value (Ω)

Test joint no. 21-22 22-23 23-24 24-25 25-26 26-27 27-28 28-29 29-30 30-31
Record value (Ω)

Test joint no. 31-32 32-33 33-34 34-35 35-36 36-37 37-38 38-39 39-40 40-41
Record value (Ω)

Test joint no. 41-42 42-43 43-44 44-45 45-46 46-47 47-48 48-49 49-50 50-51
Record value (Ω)

©LEIGHTON ASIA 2023 Page 1 of 2 Rev 00


2024-2-7
Discipline : ELectrical
INSTALLATION TEST RECORD Doc. No. :KUL14-RC-XX-E720-WS5-LCM-CX
LIGHTNING PROTECTION SYSTEM Doc. Rev.00
Date (YYYY-MM-DD) :2024-2-7

3 Measuring the Earthing Electrode resistance of individual earthing electrodes when the test joint is open

Test # Location ID / Reference Rod # Resistance (Ω) Test # Location ID / Reference Rod # Resistance (Ω) Comments

1 11

2 12

3 13

4 14

5 15

6 16

7 17

8 18

9 19

10 20

4 Measuring the earthing electrode resistance of the entire system when test joints are clo (Ω)

Test joint no. 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10 10-11 Comments
Record value (Ω)

Test joint no. 11-12 12-13 13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21
Record value (Ω)

Test joint no. 21-22 22-23 23-24 24-25 25-26 26-27 27-28 28-29 29-30 30-31
Record value (Ω)

Test joint no. 31-32 32-33 33-34 34-35 35-36 36-37 37-38 38-39 39-40 40-41
Record value (Ω)

Test joint no. 41-42 42-43 43-44 44-45 45-46 46-47 47-48 48-49 49-50 50-51
Record value (Ω)

Item Description YES NO N/A

5 Attach a drawing showing the correlation between joint numbers and earth electrides of the system

F: ADDITIONAL CHECKS AND VERIFICATIONS


Item Description Comments
1

G: COMMENTS AND REMARKS:


1

H: DOCUMENT SIGN OFF


Signature below shall be considered confirmation that the above checks have been carried out effectively.

Vendor Signature Date (DD-MM-YYYY)

MEP Sub Contractor Signature Date (DD-MM-YYYY)

General Contractor Signature Date (DD-MM-YYYY)

Consultant Signature Date (DD-MM-YYYY)

©LEIGHTON ASIA 2023 Page 2 of 2 Rev 00


2024-2-7