0% found this document useful (0 votes)
17 views

Competitor Package at Cluster Level

Uploaded by

teferyteklu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

Competitor Package at Cluster Level

Uploaded by

teferyteklu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Skill Competition at Cluster Level - Hardware and Network Servicing - 2016 E.

Sector: Economic Infrastructure Development

Sub Sector: Information and Communication Technology

Occupation: Hardware and Network Servicing Level III

Project Package for Cluster Level Skill competition

The skill competition covers the following units of competence/s:

EIS HNS1 02 1221 Operate Personal Computer

EIS HNS1 03 1221 Protect Application or System Software

EIS HNS1 04 1221 Install Software Application

EIS HNS1 06 1221 Create and Use Spread sheet

EIS HNS1 09 1221 Access and Use Internet

EIS HNS2 01 1221 Operate Database Application

EIS HNS2 02 1221 Install and Optimize Operating System Software

EIS HNS2 10 1221 Record Client Support Requirements

EIS HNS2 07 1221 Apply Problem Solving Techniques to Routine Malfunction

EIS HNS3 01 1221 Determine Best-Fit Topology

EIS HNS3 02 1221 Install and Manage Network Protocols

EIS HNS3 03 1221 Configure and Administer Server

EIS HNS3 04 1221 Monitor and Administer System and Network Security

EIS HNS3 05 1221 Identify and Resolve Network Problems

EIS HNS3 06 1221 Provide First Level Remote Help Desk Support

EIS HNS3 07 1221 Create Technical Documentation


Prepared by: Oromia Labor and Job Creation Bureau, From 25-30/06/2016, Adama Page 1
Skill Competition at Cluster Level - Hardware and Network Servicing - 2016 E.C

Project Package

General direction for the candidate

1. Before start the project, please take at least 15 minutes to read all contents of the project.

2. Make sure that you have been given all the necessary tools, equipment and information, you
need to perform the projects.

3. This Project contains Ten Tasks and further each task is divided in to sub activities. The
combination of all the activities will form the total percent of your result (100%).

4. For the purpose of your time management for each task maximum time is suggested, there for
manage your time accordingly.

Project Information

Given the necessary tools, equipment and information, the candidate is expected to perform the
following projects. The assessor should ask oral questions on which she/he is not satisfied by the
candidate’s performance.

Assessment Venue: Well Equipped Assessment Centre or real work place

Total time for all projects 5:30 Hrs

Prepared by: Oromia Labor and Job Creation Bureau, From 25-30/06/2016, Adama Page 2
Skill Competition at Cluster Level - Hardware and Network Servicing - 2016 E.C

Project: Server-Client Based Network Management System

ADAMA PTC needs to implement new installation and network configuration to manage and
automate their current manual system. The College has two branches currently in Adama City.
Accordingly, The Collage wishes to control all activities of every Student using the new system
which will be going to implement now. Hence, the Collage has a central database server and one
client computer in each branch to support the student as their clients. Consequently the College
executes the activities like installing of application software’s, recording of the Students data and
remotely helps the Students through college intranet in the two branches. And also the college
has numerous departments which have many Employees with different profession to support the
staffs as per requests. Assume, you are assigned as a Network Manager for that College and you
are responsible for installing NOS and OS, Configuring Domain Controller, Creating and
Maintaining Active Directory Objects, Assigning Automate IP Address and Managing Network
Resources including the above activities obviously.

Based on the above scenarios perform the following tasks.

Task1. Install Windows Server and Operating system

Total time for this task: 00:40 Minutes

Activity 1. Format and create two partitions on your server computer as of 70% and 30% Local
Disk C and Local Disk D respectively.

Activity 2. Install Windows Server 2008 R2 on Local Disk C.

Activity 3. Give appropriate password that meet domain admin password policy.

Activity 4. Check and Install network driver on server computer.

Prepared by: Oromia Labor and Job Creation Bureau, From 25-30/06/2016, Adama Page 3
Skill Competition at Cluster Level - Hardware and Network Servicing - 2016 E.C

Task 2. Install application software

Total time for this task: 00:20 Minutes

Activity 1. Customize and install only MS-Word 2010, MS-Access 2010, MS-PowerPoint and
MS-Excel 2010 on Server Computer.

Activity 2. Create folder on server computer desktop by your fathers’ name.

Task 3. Calculate the Students Grade based on the given scenarios on MS Excel.

Total time for this task: 00:40 Minutes

Adama PTC has six departments and six outstanding students from each department those scores
high point in each department from college as listed below.

Student Name Dept Semester Semester Total Average Grade Rank Comment
1 2
Makhs Abdo HNS 99 100
Tekela Nugusie Accounting 89 93
Masho Jundi DBA 93 97
Lelise Adola Automotive 97 90
Tamiru Geda Pharmacy 86 98
Shimalis Adugna HRM 100 95
Hint:

R.N Average Ranges Grade Comment


1 95 - 100 A+ Excellent
2 85 - 94 A Very Good
3 75 - 84 B Good
4 65 - 74 C Satisfactory
5 50 -64 D Poor
6 0 - 49 F Fail

Prepared by: Oromia Labor and Job Creation Bureau, From 25-30/06/2016, Adama Page 4
Skill Competition at Cluster Level - Hardware and Network Servicing - 2016 E.C

Activity1. Calculate Total semester point for each Student.

Activity 2. Calculate Average for each Student.

Activity 3. Calculate Grade and set for each Student.

Activity 4. Calculate and set Rank for each Student.

Activity 5. Calculate and Put Comment for each Student.

Activity 6. Save the above task 3 by Student_Grade on server computer desktop under
the folder created by your fathers’ name.

Task 4 Operate Database Application

Total time for this task: 00:50 minutes

Scenario:

The Employee Table has (Emp_ID, Emp_Name, Emp_Sex, Emp_Age, Emp_Salary),


Department Table have (Dept_ID, Dept_Name, Dept_City, Dept_Branch,
Dept_Distance) and Service Table have (Service_ID, Service_Name, Service_Fee,
Service_Tool, Service_Schedule).

Hints: The departments have many Employees and provide different services regarding
to their job rolls.

Activity1. Create Database name by Adama PTC Database on Server desktop under the
folder created by your father’s name.

Activity 2. Create the appropriate three tables.

Activity 3. Insert five row data into each table.

Activity 4. Create appropriate relationships between them.

Prepared by: Oromia Labor and Job Creation Bureau, From 25-30/06/2016, Adama Page 5
Skill Competition at Cluster Level - Hardware and Network Servicing - 2016 E.C

Activity 5. Create forms for each table separately.

Activity 6. Create query that displays Emp_Name, Emp_Salary, Dept_Name, Dept_City,


Service_Name, Service_Schedule and save by Common_Query on server desktop under
folder created by your father’s names.

Activity 7. Create reports for Common_Query.

Task 5. Record and prioritize the requests based on the given Tables below.

Total time for this task: 00:35 Minutes

Client_Request Table 1

R_N Client Name Department Equipment Problem Description


1 Sisay Negera Finace Computer The computer he works
payroll on it is unable to open.
2 Birtukan Abera Road Laptop Her failed to open AUTOCAD
software.
3 Semira Jemal Health Printer The patient record office
printer USB cable is not work
correctly.
4 Bedasa Fite Electrical Mobile His smart phone screen is
Phone damaged.
5 Nura Jarso Communication HD Camera He is unable to read data from
camera.

Prepared by: Oromia Labor and Job Creation Bureau, From 25-30/06/2016, Adama Page 6
Skill Competition at Cluster Level - Hardware and Network Servicing - 2016 E.C

Technician Table 2

R_N Technician Name Profession Job Description


1 Mohammed Amin Computer Science Office machine maintenance
2 Teklu Teferi Civil Engineering Eagle point expert
3 Not assigned Electrical Electronics Mobile maintenance
4 Chaltu Sano IT Hardware and software maintenance
5 Not Assigned Photo Grapher Camera man

Activity 1. Record all necessary requests from the above forms using MS Word and Save
by Record on Server desktop under the folder created by your name. The table should
contain (Client_Name, Department, Equipment and Problem Description, Solution,
Technician _Name).

Activity 2. Prioritize and escalate the requests (Priority, Escalate, and Reason for
Escalation).

Task 6. Apply problem solving techniques and resolve network problems

Total time for this task: 00:20 minutes

Scenario:

Obang is an IT technician in small cyber cafe. The owner of the cyber cafe has two
computers connected with each other through cross over cable and a printer connected to
one computer locally. Each computer has extra two monitors connected to each other by
VGA splitter for other customers to use internet service individually. But they get default
ip address from ethio-telecom. Always the complaint arises on Tufa from customer and
cyber cafe owner due to ip conflict cases. It needs to identify and resolve network
problems mainly resolve ip conflict, total number of users to cyber cafe at a time.

Prepared by: Oromia Labor and Job Creation Bureau, From 25-30/06/2016, Adama Page 7
Skill Competition at Cluster Level - Hardware and Network Servicing - 2016 E.C

Based on the above scenario perform the following activities.

Activity 1. Select possible topology.

Activity 2. Select possible class of ip address.

Activity 3. Select and assign correct ip address.

Activity 4. Determine number of users.

R.N Basic Activities Necessary Solution


1 Select most possible topology
2 Identify most possible class of ip
addresses
3 Give correct ip addresses for stated
above computers
4 Determine number of users those access
internet at the same time in cyber cafe

Task 7. Assign and Configure Server with Active Directory

Total time for this task: 00:20 minutes

Activity 1. Assign Static IP Address for Server computer (10.10.10.100)

Activity 2. Configure the Server as a DNS and Active Directory for the Server Computer
using the Cluster.org as a Fully Qualify Domain Name (FQDN).

Activity 3. Create forward lookup zones for the DNS.

Activity 4. Select DNS server zone type 2 Primary zones and active storage.

Activity 5. Select the appropriate active directory replication scope.

Activity 6. Create the new zone name by mycluster.org.

Prepared by: Oromia Labor and Job Creation Bureau, From 25-30/06/2016, Adama Page 8
Skill Competition at Cluster Level - Hardware and Network Servicing - 2016 E.C

Task 8. Install and Configure DHCP Server Role

Total time for this task: 00:20 minutes

Activity 1. Install DHCP and give Scope Name Cluster_dhcp, the range of IP address
should be 10.10.10.101 to 10.10.10.130

Activity 2. Exclude IP address should be from 10.10.10.102 to 10.10.10.110

Activity 3. Install Web server and Print service

Activity 4. Create and assign an IP address to your FTP by 10.10.10.115

Task 9. Create and Maintain Active Directory Objects

Total time for this task: 00:40 Minutes

Activity 1. Create organizational unit called Oro_Cluster.

Activity 2. Create three groups under organizational unit.

Groups Scope Types


Shashemene Local Distribution
Adama Global Security
Chiro Universal Distribution
Ambo Global Security

Activity 3. Adjust domain password policies, minimum password length is 7 characters


maximum password age is 21 days.

Activity 4. Create the next domain users.


Prepared by: Oromia Labor and Job Creation Bureau, From 25-30/06/2016, Adama Page 9
Skill Competition at Cluster Level - Hardware and Network Servicing - 2016 E.C

First Name Last Name Logon Name Password


Tola Bula
Chala Oli
Warku Tura
Ahmed Nuri
Bacha Sodo
Tilahun Belay
Yusuf Jemal

Activity 5. Create appropriate logon name and password for the users.

Activity 6. Add the above users to their respective groups’ members.

Users Groups
Tola and Tilahun Shashamane
Warku and Ahmed Adama
Bacha and Chala Ambo
Yusuf Chiro

Activity 7. Set the access time for Chiro group member users only from Friday to
Saturday from 4:00 pm to 6:00 pm.

Task 10. Share and Access Network Resources

Total time for this task: 00:45 minutes

Activity 1. Create folder called Share_Cluster on server desktop and Share the folder for
everyone users with read and write permission.

Activity 2. Access shared folder on server from client computers using FTP.

Prepared by: Oromia Labor and Job Creation Bureau, From 25-30/06/2016, Adama Page 10
Skill Competition at Cluster Level - Hardware and Network Servicing - 2016 E.C

Activity 3. Add local printer on server computer using available Printer.

Activity 4. Share the printer for Adama group users and print test page from client.

Activity 5. Join to Cluster domain by adding client computers to its domain (The IP
address is already assigned by DHCP server automatically).

Activity 6. Join from client computer to server by Shashamene group users.

Activity 7. Access server computer from client with Tilahun user remotely.

Prepared by: Oromia Labor and Job Creation Bureau, From 25-30/06/2016, Adama Page 11
Skill Competition at Cluster Level - Hardware and Network Servicing - 2016 E.C

Consumable & Non consumable materials to be used for project per candidate

Project : Server Client Based Network Management System


Non Consumable Materials
R_No Item Description Quantity Units Specifications
1 Server Computer 1:1 No - Dell OptiPlex 7010 or above
- RAM: 4Gb or above
- Processor: 3.00GHZ or above
- Hard Disk: 500GB or above
2 Client computers with 2:1 No - Dell OptiPlex 7010 or above
server computer - RAM: 4Gb or above
- Processor: 3.00GHZ or above
- Hard Disk: 500GB or above
- Dell OptiPlex 780 or above
- RAM: 2Gb or above
- Processor: 3.00GHZ or above
- Hard Disk: 500GB or above
- Windows 7 or Later version
3 Printer 1:18 No - Any latest version printer with driver
and USB ports.
4 Switch 1:8 No - D-Link or TP-Link with 24 ports
Consumable Materials
R_No Item Description Quantity Units Specifications
1 Network Operating System 1:1 No Windows Server 2008 R2 and above
2 Windows Operating System 1:1 No Window 7 or Latest version
2 Driver Software 1:1 No -Driver pack solution or Latest version
3 Crimped Network Cable 3:1 No/Meter - Straight-through UTP cable
4 Paper 4:1 No -A4
5 Software applications 1:1 No -MS Word 2007or above

Prepared by: Oromia Labor and Job Creation Bureau, From 25-30/06/2016, Adama Page 12

You might also like