0% found this document useful (0 votes)
18 views146 pages

Take Off Sheet Pro.

Takeoff sheet for the student of engineering very important

Uploaded by

jirojiram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views146 pages

Take Off Sheet Pro.

Takeoff sheet for the student of engineering very important

Uploaded by

jirojiram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 146

TAKE OFF SHEET

A . SUB-STRUCTURE
Item No Timizing dimensioning squaring unit

1 15.81
9.25
146.2425 M2
2
1 14.81
8.25
0.5
61.09125 M3
3

2 1.7
1.75
2
11.9 M3

1 2.15
2.15
2
9.245 M3

3 2.05
2.05
2
25.215 M3

3 1.8
1.8
2
19.44 M3

2 1.6
1.6
2
10.24 M3
2 1.6
1.6
2
10.24 M3
74.38 M3
4

1 3.75
1
1.05
3.9375 M3

1 4.36
1
1.05
4.578 M3

1 0.53
1
1.05
0.5565 M3

1 1.37
1
1.05
1.4385 M3

1 1.71
1
1.05
1.7955 M3

1 2.17
1
1.05
2.2785 M3

6.1
1 1
1.05
6.405 M3
1 1.32
1
1.05
1.386 M3

1 2.93
1
1.05
3.0765 M3

1 2
1
1.05
2.1 M3

1 4.33
1
1.05
4.5465 M3
32.0985 M3
5

61.09125 M3
74.38 M3
32.0985 M3
167.56975 M3

8.311 M3
1.06 M3
31.17 M3
40.541 M3
127.02875 M3

2 0.525
0.0625
0.156
1.487 M3

1 1.65
1.65
0.4
1.089 M3

3 1.55
1.55
0.4
2.883 M3

3 1.3
1.3
0.3
1.521 M3

2 1.1
1.1
0.3
0.726 M3

2 1.1
1.1
0.25
0.605 M3
8.311 M3

0.25
1 0.25
1.6
0.1 M3

3 0.2
0.3
1.6
0.288 M3

2 0.2
0.3
1.6
0.192 M3

6 0.2
0.2
1.6
0.384 M3

1 0.2
0.3
1.6
0.096 M3
1.06 M3

1 3.75
0.5
1
1.875 M3

3 0.2
0.15
1
0.09
1.785

1 4.85
0.5
1
2.425 M3

1 2.2
0.5
1
1.1 M3

2 5.5
0.5
1
5.5 M3

1 3.5
0.5
1
1.75 M3

6.1
1 0.5
1
3.05 M3

1 2.31
0.5
1
1.155 M3

1 10.71
0.5
1
5.355 M3

1 9.71
0.5
1
4.855 M3

1 7
0.5
1
3.5 M3

1.39
1 0.5
1
0.695 M3
31.17 M3
6

29.2485 M3
167.56975 M3
196.81825 M3
127.02875 M3
69.7895 M3
7
2 1.2
1.25
3 M2

1 1.65
1.65
2.7225 M2

3 1.55
1.55
7.2075 M2

3 1.3
1.3
5.07 M2

2 1.1
1.1
2.42 M2

2 1.1
1.1
2.42 M2
22.84 M2

31.17 M2

1 7.25
0.2
0.4
0.58 M3

1 4.85
0.2
0.4
0.388 M3
1 4.85
0.2
0.4
0.388 M3

2 6.1
0.2
0.4
0.976 M3

1 3.7
0.2
0.4
0.296 M3

1 6.1
0.2
0.4
0.488 M3

1 2.9
0.2
0.4
0.232 M3

1 12.91
0.2
0.4
1.0328 M3

1 12.61
0.2
0.4
1.0088 M3

1 8.49
0.2
0.4
0.6792 M3

1 1.39
0.2
0.4
0.1112 M3
6.18 M3

1 2.9
4.45
0.1
1.2905 M3

1 1.9
2.2
0.1
0.418 M3

1 1.39
0.8
0.1
0.1112 M3

1 2.4
2.2
0.1
0.528 M3

1 5.2
2.2
0.1
1.144 M3

1 3.8
3.3
0.1
1.254 M3

1 3.2
3.3
0.1
1.056 M3

1 1.8
2.2
0.1
0.396 M3

1 1.3
2.2
0.1
0.286 M3

1 1.3
3.3
0.1
0.429 M3
6.9127 M3
8

31.17 M3

1 2.9
4.45
0.25
3.22625 M3

1 1.9
2.2
0.25
1.045 M3

1 1.39
0.8
0.25
0.278 M3

1 2.4
2.2
0.25
1.32 M3

1 5.2
2.2
0.25
2.86 M3

1 3.8
3.3
0.25
3.135 M3

1 3.2
3.3
0.25
2.64 M3

1 1.8
2.2
0.25
0.99 M3

1 1.3
2.2
0.25
0.715 M3

1 1.3
3.3
0.25
1.0725 M3
17.28175 M3

4.9 M2

1 6.8
0.4

2.72 M2
3 6.4
0.4

7.68 M2

3 5.4
0.3

4.86 M2

2 4.6
0.3

2.76 M2

2 4.6
0.25

2.3 M2
25.22 M2

1 1
1.6
1.6 M2

3 1
1.6

4.8 M2

2 1
1.6
3.2 M2

6 0.8
1.6

7.68 M2

1 1
1.6

1.6 M2
18.88 M2

1 14.1
0.4
5.64 M2

1 8.9
0.4
3.56 M2

1 4.4
0.4
1.76 M2

2 11
0.4
8.8 M2

1 6.6
0.4
2.64 M2

1 11.6
0.4
4.64 M2

1 6.1
0.4
2.44 M2

1 26.42
0.4
10.568 M2

1 25.2
0.4
10.08 M2

1 17.39
0.4
6.956 M2

1 2.78
0.4
1.112 M2
58.196 M2
TAKE OFF SHEET
A . SUB-STRUCTURE
description
1 .Earth work & Excavation
1.1 Site clearance
Clearing of top soil, grass and other materials from the site at adepth of 20cm
L=13.81+2=15.81m, we will add 1m for both side that is used for working space
W=7.25+2=9.25m
total area of the site will be cleared
1.2 Bulk excavation
L=13.81+1=14.81m,We added 0.5m on each side for Working Space
W=7.25+1=8.25m
D=0.5m
Total volume of Bulk Excavation
1.3 pit excavation
FOR LF1
L=1.2+0.5=1.7m, We added 0.25m on each side for Working Space
W=1.25+0.5=1.75m
D=2m
Volume of pit excavation LF1
FOR F1
L=1.65+0.5=2.15m, we will add 25cm of working space on both sides
w=1.65+0.5=2.15m
D=2m
Volume of pit excavation F1
FOR F2
L=1.55+0.5=2.05m
w=1.55+0.5=2.05m
D=2m
Volume of pit excavation F2
FOR F3
L=1.3+0.5=1.8m
w=1.3+0.5=1.8m
D=2m
Ditto but for F3
FOR F4

L=1.1+0.5=2.05m
w=1.1+0.5=2.05m
D=2m
Volume of pit excavation F4
FOR F5
L=1.1+0.5=1.8m
w=1.1+0.5=1.8m
D=2m
Volume of pit excavation F5
Total volume of pit excavation
1.4 TRENCH EXCAVATION
FOR AXIS A/ 1'-3
L=3.75m, Deduct the length of pit excavation b/c we already excavated for the footing pads
w=0.5+0.5=1m, add 0.25 working space on both sides
D=1.05m, add 5cm in consideration of lean concrete
Volume of trench excavation for axis A/1-3
FOR AXIS B/ 1'-2
L=4.36m
w=0.5+0.5=1m
D=1.05m
Volume of trench excavation for axis B/1'-2
FOR AXIS B' /2-3
L=0.53m
W=0.5+0.5=1
D=1.05m
Volume of trench excavation for axis B'/2-3
FOR AXIS C/ 1-3
L=1.37m
W=0.5+0.5=1
D=1.05m
Volume of trench excavation for axis C/1-3
FOR AXIS C'/1-2
L=1.71m
W=0.5+0.5=1
D=1.05m
Volume of trench excavation for axis C'/1-2
FOR AXIS E/ 1-3
L=3.17m
W=0.5+0.5=1
D=1.05m
Volume of trench excavation for axis E/1-3
FOR AXIS F/ 1-3
L=6.1m
W=0.5+0.5=1
D=1.05m
Volume of trench excavation for axis F/1-3
FOR AXIS 1'/ A-B
L=1.32m
w=0.5+0.5=1m
D=1.05m
Volume of trench excavation for axis 1'/A-B
FOR AXIS 3/ A -F
L=2.93m
W=0.5+0.5=1
D=1.05m
Volume of trench excavation for axis 3/A-F
FOR AXIS 2/ A-F
L=2m
W=0.5+0.5=1
D=1.05m
Volume of trench excavation for axis 2/A-F
FOR AXIS 1/ C-F
L=4.33m
W=0.5+0.5=1m
D=1.05m
Volume of trench excavation for axis 1/C-F
Total Volume of Trench Excavation
1.5 BACK FILL
back fill=excavation work-concrete work & stone work
Bulk excavation
Pit excavation
Trench excavation
Sub total Excavation work
Deduct volume of concrete work for Footing pad & footing column, and Stone work
Concrete work for Footing pad
Concrete work for footing column
Stone work
Sub total
Total Back Fill volume

1.5.1 concrete work for footing pad


LF1
This footing Pad consists of three different shapes, so we can get the volume of concrete needed by
calculating each of the shapes separately & adding them together
Diamension of the first section L=1.2m, W=1.25m, D=0.35, V=L*W*H=0.525
Diamension of the second section L=0.2m, W=1.25m, D=0.25, V=L*W*H=0.0625
Diamension of the third section, it is triangle(V=0.5*Ab*H) Ab=W*L, W=1.25, L=1, H=0.25, V=0.156
The added Volume of concrete for the three sections of Footing Pad LF1
F1
L=1.65m
w=1.65
D=0.4m
Volume of concrete for F1
F2
L=1.55m
w=1.55m
D=0.4m
ditto but for F2
F3
L=1.3m
w=1.3m
D=0.3m
ditto but for F3
F4
L=1.1m
w=1.1m
D=0.3m
ditto but for F4
F5
L=1.1m
w=1.1m
D=0.25m
ditto but for F5
Total volume of concrete for all footing pad
1.5.2 concrete work for footing column
C1
L=0.25m
W=0.25m
D=1.6m
Volume of concrete work for C1
C2
L=0.2
w=0.3
D=1.6
ditto but for C2
C3
L=0.2
w=0.3
D=1.6
ditto but for C3
C4
L=0.2
w=0.2
D=1.6
ditto but for C4
C5
L=0.2
w=0.3
D=1.6
ditto but for C5
Total volume of concrete for all footing column

1.5.3 Stone work for foundation wall


FOR AXIS A/ 1'-3
L=3.75m
w=0.5m
D=1m
Volume of foundation wall for axis A/1-3
DEDUCT volume of the column
L=0.2m
W=0.15m
D=1m
Volume of column
Volume of foundation wall for axis A/1-3
FOR AXIS B/ 1'-2
L=4.85m
w=0.5m
D=1m
Ditto but for axis B/1'-2
FOR AXIS B' /2-3
L=2.2m
w=0.5m
D=1m
Ditto but for axis B'/2-3
FOR AXIS C/ 1-3 & E/1-3
L=5.5m
w=0.5m
D=1m
Ditto but for axis C/1-3 & E/1-3
FOR AXIS C'/1-2
L=3.5m
w=0.5m
D=1m
Ditto but for axis C'/1-2
FOR AXIS F/ 1-3
L=6.1m
w=0.5m
D=1m
Ditto but for axis B/1'-2
FOR AXIS 1'/ A-B
L=2.31m
w=0.5m
D=1m
Ditto but for axis 1'/A-B
FOR AXIS 3/ A -F
L=10.71m
w=0.5m
D=1m
Ditto but for axis 3/A-F
FOR AXIS 2/ A-F
L=9.71m
w=0.5m
D=1m
Ditto but for axis 2/A-F
FOR AXIS 1/ C-F
L=7m
w=0.5m
D=1m
Ditto but for axis 1/C-F
FOR AXIS 2'/B-C
L=4.65m
w=0.5
D=1m
Ditto but for axis 2'/B-C
Total volume of Foundation wall
1.6 CART AWAY
Cart Away= Total earth work - Backfill
Site Clearance
Excavation work
Total Earth work
Backfill
Total volume of Cart away Soil
1.7 concrete work for sub structure
1.7.1 lean concrete(C5)
A.under footing pad
LF1
L=1.2
W=1.25
Lean concrete under LF1
F1
L=1.65m
W=1.65m
Ditto but for F1
F2
L=1.55m
W=1.55m
Ditto but for F2
F3
L=1.3m
W=1.3m
Ditto but for F3
F4
L=1.10m
W=1.10m
Ditto but for F4
F5
L=1.10m
W=1.10m
Ditto but for F5
Total area of lean concrete under footing pad
B.UNDER FOUNDATION WALL
we have already calculated the volume of total foundation wall on section 1.5.3 above, so we will
devide it by it's depth=1
Total area of lean concrete under Foundation wall
1.7.2 Grade beam
FOR AXIS A/ 1'-3
L=7.25m
W=0.2m
H=0.4m
Total volume of concrete for axis A/1'-3
FOR AXIS B/ 1'-2
L=4.85m
W=0.2m
H=0.4m
Ditto but for axis B/1'-2
FOR AXIS B' /2-3
L=4.85m
W=0.2m
H=0.4m
Ditto but for axis B'/2-3
FOR AXIS C/ 1-3 & E/1-3
L=6.1m
W=0.2m
H=0.4m
Ditto but for axis C/1-3 & E/1-3
FOR AXIS C'/1-2
L=3.7m
W=0.2m
H=0.4m
Ditto but for axis C'/1-2
FOR AXIS F/ 1-3
L=6.1m
W=0.2m
H=0.4m
Ditto but for axis F/1-3
FOR AXIS 1'/ A-B
L=2.9m
W=0.2m
H=0.4m
Ditto but for axis 1'/A-B
FOR AXIS 3/ A -F
L=12.91m
W=0.2m
H=0.4m
Ditto but for axis 3/A-F
FOR AXIS 2/ A-F
L=12.61m
W=0.2m
H=0.4m
Ditto but for axis 2/A-F
FOR AXIS 1/ C-F
L=8.49m
W=0.2m
H=0.4m
Ditto but for axis 1/C-F
FOR AXIS 2'/B-C
L=1.39
W=0.2m
H=0.4m
Ditto but for axis 2'/B-C
Total volume of concrete for all grade beam
1.7.3 CONCRETE WORK FOR GROUND FLOOR SLAB
For the section enclosed by the Axis 1'-2/A-B
L=2.9m
W=4.45
H=0.1
Volume of concrete work for GF Slab for Axis 1'-2/A-B
For Axis 2-3/A-B'
L=1.9
W=2.2
H=0.1
Ditto but For Axis 2-3/A-B'
For Axis 2'-2/B-C
L=1.39
W=0.8
H=0.1
Ditto but For Axis 2'-2/B-C
For Axis 2-3/B'-C
L=2.4
W=2.2
H=0.1
Ditto but For Axis 2-3/B'-C
For Axis 2-3/C-D
L=5.2
W=2.2
H=0.1
Ditto but For Axis 2-3/C-D
For Axis 1-2/C-C'
L=3.8
W=3.3
H=0.1
Ditto but For Axis 1-2/C-C'
For Axis 1-2/C'-E
L=3.2
W=3.3
H=0.1
Ditto but For Axis 1-2/C'-E
For Axis 2-3/D-E
L=1.8
W=2.2
H=0.1
Ditto but For Axis 2-3/D-E
For Axis 2-3/E-F
L=1.3
W=2.2
H=0.1
Ditto but For Axis 2-3/E-F
For Axis 1-2/E-F
L=1.3
W=3.3
H=0.1
Ditto but For Axis 1-2/E-F
Total Volume of Concrete for Ground Floor Slab
1.8 STONE WORK
1.8.1 FOUNDATION WALL
we have already calculated the volume of total foundation wall on section 1.5.3 above
Total volume of stone for foundation wall
1.8.2 hard core for ground floor
The area of hard core which will be placed is the same area as area of the slab, the only difference is
the depth(the depth of the hard core is H=0.25m)
For the section enclosed by the Axis 1'-2/A-B
L=2.9m
W=4.45
H=0.25
Volume of Hard Core for Axis 1'-2/A-B
For Axis 2-3/A-B'
L=1.9
W=2.2
H=0.25
Ditto but For Axis 2-3/A-B'
For Axis 2'-2/B-C
L=1.39
W=0.8
H=0.25
Ditto but For Axis 2'-2/B-C
For Axis 2-3/B'-C
L=2.4
W=2.2
H=0.25
Ditto but For Axis 2-3/B'-C
For Axis 2-3/C-D
L=5.2
W=2.2
H=0.25
Ditto but For Axis 2-3/C-D
For Axis 1-2/C-C'
L=3.8
W=3.3
H=0.25
Ditto but For Axis 1-2/C-C'
For Axis 1-2/C'-E
L=3.2
W=3.3
H=0.25
Ditto but For Axis 1-2/C'-E
For Axis 2-3/D-E
L=1.8
W=2.2
H=0.25
Ditto but For Axis 2-3/D-E
For Axis 2-3/E-F
L=1.3
W=2.2
H=0.25
Ditto but For Axis 2-3/E-F
For Axis 1-2/E-F
L=1.3
W=3.3
H=0.25
Ditto but For Axis 1-2/E-F
Total Volume of Hard Core
1.9 FORM WORK
1.9.1 FOR FOOTING PAD
Add LF1
This footing Pad consists of three different shapes, so we can get the Area of Formwork needed by
calculating each of the shapes separately & adding them together
Dimension of the first section L=1.2m+0.05*2m, W=1.25m, H=0.35m ((P=2L+2W)*H)
Dimension of the second section L=0.2m, W=1.25m, D=0.25 ((P=2L+W)*H)
Dimension of the third section, it is triangle(Ab=0.5L*H), L=1, H=0.25, P=2
The added Volume of concrete for the three sections of Footing Pad LF1
F1
provide cut and fix in position sawn structural wood, add 10cm to both side on the length side for shuttering
L=1.65+(2*0.05)=1.75m, do we have to add 0.1???
W=1.65=1.65m
P=2L+2W=6.8m, perimeter of the F1
H=0.4m
Total area of form work for F1
F2
L=1.55+2*0.05=1.65m
W=1.55=1.55m
P=2L+2W=6.4m
H=0.4m
Ditto but for F2
F3
L=1.3+2*0.05=1.4m
W=1.3=1.3m
P=2L+2W=5.4m
H=0.3m
Ditto but for F3
F4
L=1.1+2*0.05=1.2m
W=1.1=1.1m
P=2L+2W=4.6m
H=0.3m
Ditto but for F4
F5
L=1.1+2*0.05=1.2m
W=1.1=1.1m
P=2L+2W=4.6m
H=0.25m
Ditto but for F5
Total area of form work for all footing pad
1.9.2 form work for footing column
C1
L=0.25m
W=0.25m, H=1.6m
P=2L+2W=1.2m
Area of form work for C1
C2
L=0.3m
W=0.2=0.2m
P=2L+2W=1.2m
D=1.6m
Ditto but for C2
C3
L=0.3m
W=0.2=0.2m
P=2L+2W=1.2m
D=1.6m
Ditto but for C3
C4
L=0.2m
W=0.2=0.2m
P=2L+2W=1m
D=1.6m
Ditto but for C4
C5
L=0.3m
W=0.2=0.2m
P=2L+2W=1.2m
D=1.6m
Ditto but for C5
Total area of form work for footing column
1.9.3 form work for grade beam
FOR AXIS A/ 1'-3
The length of outer side L=7.25m, the length of inner side L=6.85, the total length=14.1m
H=0.4m
Total volume of Formwork for axis A/1'-3
FOR AXIS B/ 1'-2
The length of outer side L=4.45m, the length of inner side L=4.45, the total length=8.9m
H=0.4m
Ditto but for axis B/1'-2
FOR AXIS B' /2-3
The length of outer side L=2.2m, the length of inner side L=2.2, the total length=4.4m
H=0.4m
Ditto but for axis B'/2-3
FOR AXIS C/ 1-3 & E/1-3
The length of outer side L=5.5m, the length of inner side L=5.5, the total length=11m
H=0.4m
Ditto but for axis C/1-3 & E/1-3
FOR AXIS C'/1-2
The length of outer side L=3.3m, the length of inner side L=3.3m, the total length=6.6m
H=0.4m
Ditto but for axis C'/1-2
FOR AXIS F/ 1-3
The length of outer side L=6.1m, the length of inner side L=5.5m, the total length=11.6m
H=0.4m
Ditto but for axis F/1-3
FOR AXIS 1'/ A-B
The length of outer side L=3.3m, the length of inner side L=2.9, the total length=6.1m
H=0.4m
Ditto but for axis 1'/A-B
FOR AXIS 3/ A -F
The length of outer side L=13.81m, the length of inner side L=12.61, the total length=26.42m
H=0.4m
Ditto but for axis 3/A-F
FOR AXIS 2/ A-F
The length of outer side L=12.6m, the length of inner side L=12.6, the total length=25.2m
H=0.4m
Ditto but for axis 2/A-F
FOR AXIS 1/ C-F
The length of outer side L=9.09m, the length of inner side L=8.3, the total length=17.39m
H=0.4m
Ditto but for axis 1/C-F
FOR AXIS 2'/B-C
The length of outer side L=1.39m, the length of inner side L=1.39, the total length=2.78m
H=0.4m
Ditto but for axis 2'/B-C
Total Area of Formwork for Grade Beam
1 4.36
1
1.05
4.578 M3

1 0.53
1
1.05
0.5565 M3

1 1.37
1
1.05
1.4385 M3

1 1.71
1
1.05
1.7955 M3

1 2.17
1
1.05
2.2785 M3

6.1
1 1
1.05
6.405 M3
28.161 M3
FOR AXIS B/ 1'-2
L=4.36m
w=0.5+0.5=1m
D=1.05m
Volume of trench excavation for axis B/1'-2

FOR AXIS B' /2-3


L=1.03m
W=0.5+0.5=1
D=1.05m
Volume of trench excavation for axis B'/2-3
FOR AXIS C/ 1-3
L=2.3m
W=0.5+0.5=1
D=1.05m
Volume of trench excavation for axis 1-3 Vs C
FOR AXIS C'/1-2
L=2.47m
W=0.5+0.5=1
D=1.05m
Volume of trench excavation for axis C'/1-2
FOR AXIS E/ 1-3
L=3.17m
W=0.5+0.5=1
D=1.05m
Volume of trench excavation for axis E/1-3
FOR AXIS F/ 1-3
L=4.65m
W=0.5+0.5=1
D=1.05m
Volume of trench excavation for axis F/1-3
Total volume of trench excavation
B. SUPER-STRUCTURE
Item No Timizing dimensioning squaring unit
1

1 0.0491
2.42

0.118822 M3

3 0.3
0.2
2.42
0.4356 M3

2 0.3
0.2
2.42
0.2904 M3

6 0.2
0.2
2.42
0.5808 M3

1 0.3
0.2
2.42
0.1452 M3

2 0.2
0.2
2.42
0.1936 M3
1.764422 M3

1 0.25
0.25
2.76
0.1725 M3

3 0.3
0.2
2.76
0.4968 M3

2 0.3
0.2
2.76
0.3312 M3

6 0.2
0.2
2.76
0.6624 M3

1 0.3
0.2
2.76
0.1656 M3
1.8285 M3

1 0.25
0.25
2.76
0.1725 M3

3 0.3
0.2
2.76
0.4968 M3

2 0.3
0.2
2.76
0.3312 M3
1.0005 M3
1.2

6.64
2 0.2
0.3
0.7968 M3

5.5
2 0.2
0.3
0.66 M3

2.2
1 0.2
0.3
0.132 M3

1 2.3
0.2
0.3
0.138 M3

9.1
1 0.2
0.3
0.546 M3

12.3
2 0.2
0.3
1.476 M3
3.6108 M3

2 13.8
0.2
0.3
1.656 M3

1 10.5
0.2
0.3
0.63 M3

3 5.5
0.2
0.3
0.99 M3

2 2.2
0.2
0.3
0.264 M3
3.54 M3

1 7
0.2
0.3
0.42 M3

2 6.1
0.2
0.3
0.732 M3
1.152 M3

1 1.9
2.2
4.18 M2
1.3
1 2.4
2.2
5.28 M2

1 13.05
3.3
43.065 M2
1 5.2
2.2

11.44 M2

1 3.19
1
3.19 M2

2 1
1.29
2.58 M2
5.67 M2

1 4.95
2.2
10.89 M2
69.085 M2

1 1.3
3.3
4.29 M2

1 1.3
2.2
2.86 M2

1 5.2
3.3
17.16 M2

1 5.2
2.2
11.44 M2
1 3.19
1
3.19 M2

2 1
1.29
2.58 M2
5.67 M2
29.98 M2

2
0.287
0.574 M3

2 1.29
1
0.15
0.387 M3

2 1.29
1
0.39
1.0062 M3
1.3932 M3

2 4.2977
1
0.3
2.57862 M3
4.54582 M3
30.917442 M3
1 0.07065
2.42
0.170973 M2

3 1
2.42

7.26 M2

2 1
2.42

4.84 M2

6 0.8
2.42

11.616 M2

1 1
2.42

2.42 M2

2 0.8
2.42

3.872 M2
30.178973 M2

1 1
2.76

2.76 M2
3 1
2.76

8.28 M2

2 1
2.76

5.52 M2

6 0.8
2.76

13.248 M2

1 1
2.76

2.76 M2
32.568 M2

1 1
2.76

2.76 M2

3 1
2.76

8.28 M2

2 1
2.76

5.52 M2
16.56 M2
1 13.88

0.65

9.022 M2

1 13.58
0.65

8.827 M2

1 11.4
0.65

7.41 M2

1 11.6
0.65

7.54 M2

1 2.2
0.65

1.43 M2

1 4.2
0.65

2.73 M2

1 17.6
0.65

11.44 M2

1 22.6
0.65
14.69 M2

1 23.6
0.65

15.34 M2
78.429 M2

1 26.6

0.65

17.29 M2

1 26
0.65
16.9 M2

1 20.2
0.65

13.13 M2

1 4.6
0.65

2.99 M2

1 4.4
0.65
2.86 M2

1 11
0.65

7.15 M2

1 11.6
0.65

7.54 M2
67.86 M2

2 13.4

0.65

17.42 M2

1 13
0.65

8.45 M2

2 11.6
0.65

15.08 M2
40.95 M2

1 7.26
3.81
27.6606 M2

1 13.45
9.09
122.2605 M2

1 7.9
1
7.9 M2
114.3605 M2
142.0211 M2
1 6.9
6.1
42.09 M2

1 4.1
1
4.1 M2
37.99 M2

2 1.29
1
2.58 M2

4 2.29
0.15
1.374 M2
3.954 M2

2 4.2977
1
8.5954 M2

2 4.2977
0.15
1.28931 M2
9.88471 M2

22 0.18
1
3.96 M2
17.79871 M2
464.355783 M2

1 5.5
2.89
15.895 M2

1 1.22
2.53
3.0866 M2

1 2.42
2.53
6.1226 M2

1 0.62
1.04
0.6448 M2
6.041 M2

1 11.3
2.89
32.657 M2

1 18.74
2.89
54.1586 M2

1 0.82
2.53
2.0746 M2

3 0.72
2.53
5.4648 M2

1 1.52
2.53
3.8456 M2

1 1.52
1.58
2.4016 M2
40.372 M2

1 6.65
2.89
19.2185 M2
98.2885 M2

1 5.5
2.88
15.84 M2

1 2.12
1.63
3.4556 M2

1 0.62
1.63
1.0106 M2
11.3738 M2

1 11.3
2.88
32.544 M2

1 17.22
2.88
49.5936 M2

3 1.52
2.53
11.5368 M2

1 0.62
1.53
0.9486 M2
37.1082 M2

1 2.2
2.88
6.336 M2
87.362 M2

1 5.5
2.93
16.115 M2

1 2.12
1.52
3.2224 M2

1 2.2
1.52
3.344 M2
9.5486 M2

1 6.5
2.93
19.045 M2

1 6.5
2.93
19.045 M2

1 6.1
2.93
17.873 M2

1 1.22
1.35
1.647 M2

1 1.22
0.88
1.0736 M2
15.1524 M2
80.664 M2
266.3145 M2
1 13.75
2.68
36.85 M2

1 16.28
2.73
44.4444 M2

1 9.55
2.73
26.0715 M2
107.3659 M2

2 532.629 M2

2 214.7318 M2
747.3608 M2

1 1.9
2.2
4.18 M2

1 2.4
2.2
5.28 M2

1 13.05
3.3
43.065 M2
1 5.67 M2

1 4.95
2.2
10.89 M2
69.085 M2

1 1.3
3.3
4.29 M2

1 1.3
2.2
2.86 M2

1 5.2
3.3
17.16 M2

1 5.67 M2
29.98 M2

846.4258 M2

69.67 m
6.46 m
63.21 m
55.63 m
3.9 m
51.73 m
52.37 m
3.18 m
49.19 m
164.13 m
73.1 M2

16 M2
38.5 M2

13.3 M2
22.5 M2
102.4 M2
61 M2

1 1.9
4.44
8.436 M2

1 1.9
2.2
4.18 M2

1 1.1
2.2
2.42 M2

1 3.2
3.3
10.56 M2

1 3.2
2.2
7.04 M2
24.2 M2

1 6.5
3.2
20.8 M2

1 6.5
2.2
14.3 M2
35.1 M2
67.736 M2

12 8.64

103.68 m

4.55 m

3.31 m
6.1 m
9.41 m

19.68 m
33.64 m

(258 x 242)cm 6.24 M2


(104 x 62)cm 0.645 M2
(127 x 62)cm 0.787 M2
(127 x 48)cm 0.61 M2

(158 x 108)cm 1.71 M2

(258 x 152)cm 3.92 M2


13.912 M2

(163 x 202)cm 3.29 M2


(163 x 122)cm 1.99 M2

2 (153 x 122)cm 3.72 M2

(88 x 62)cm 0.55 M2


13.27 M2

(152 x 220)cm 3.34 M2


(152 x 202)cm 3.07 M2

(135 x 104)cm 1.41 M2


(88 x 104)cm 0.92 M2
8.74 M2
35.922 M2

(258 x 122)cm 3.15 M2


(258 x 72)cm 1.86 M2

(258 x 82)cm 2.12 M2


7.13 M2

2 (211 x 72)cm 1.52 M2


211 x 82)cm 1.73 M2

2 (211 x 72)cm 1.52 M2


3 211 x 82)cm 1.73 M2

(211 x 72)cm 1.52 M2


3 211 x 82)cm 1.73 M2
19.71 M2

2 7.74
15.48 m
22 0.96
21.12 m
11.92
2.2
14.12 m
24 23.04
24 23.04
46.08 m

1.28 m
0.78 m
0.88 m
2.94 m

2.48 m
0.68 m
0.68 m
0.54 m
1.24 m
1.58 m
7.2 m

2.18 m
1.28 m
2 2.56 m
0.68 m
6.7 m

2.18 m
2 1.28 m
4.74 m

0.4704 M2

3 4.35 M2
1.67 M2
6.4904 M2
5.62 M2
0.489 M2
0.61 M2
0.445 M2

1.61 M2

2.13 M2
10.904 M2

2.94 M2
1.97 M2

2 3.2 M2

0.352 M2
8.462 M2

4.56 M2
2.78 M2

1.21 M2
0.768 M2
9.318 M2
28.684 M2

15 pcs

3 pcs

1 pcs

3 pcs
3 pcs

7 pcs

6 pcs

2 pcs

3 pcs

2 pcs

7 pcs

3 pcs

1 pcs

3 pcs

29 pcs

12 pcs

4 pcs

1 pcs

2 pcs
1 pcs

13 pcs
9 pcs
5 pcs

14 pcs
5 pcs
5 pcs

1 pcs
27 pcs
24 pcs

4 pcs

7 pcs

15 pcs

3 pcs

2 pcs

2 pcs

2 pcs
10 pcs

2 pcs

2 pcs

3 pcs

2 pcs

1 pcs

8 pcs
12 pcs
27 pcs
6 pcs
2 pcs

39.65 m
42.2 m
41.66 m
123.51 m

62.34 m
71.55 m
69.11 m
203 m
16.7

123.51 m
203 m

28.94 m

26.88 m
8.56 m
35.44

64.87 m
25.67 m
90.54 m

27.94 m
153.92 m

15.77 m
36.85 m
10.94 m

2 pcs
2 pcs
3 pcs
1 pcs
1 pcs
2 pcs

2 pcs
2 pcs
2 pcs
1 pcs
2 pcs
1 pcs

1 pcs
1 pcs
1 pcs
1 pcs
1 pcs
5 pcs
5 pcs
4 pcs
4 pcs
6 pcs
1 pcs
1 pcs

1 3.8
3.3
3.7
46.398 M3

3.8
3.3
12.54 M2

2 3.3
0.4
3
7.92 M3

2 2.8
0.4
3
6.72 M3

2 0.5
3.8
0.5
3
5.7 M3

2 0.5
3.3
0.5
3
4.95 M3
25.29 M3

1 3.3
2.8
9.24 M2

1 0.5
0.5
0.25 M2
8.99 M2

1 3.8
3.3
12.54 M2
21.53 M2

1 12.2
3
36.6 M2

1 9
3
27 M2
63.6 M2

7 3.66
25.62 m

7 3.45
24.15 m
49.77 m

7 2.55
17.85 m
3 1.82
5.46 m
23.31 m

7 3.73
26.11 m

7 5
35 pcs
1.3
45.5 m

4 2.3
9.2 m

4 2.15
8.6 m
17.8 m

4 0.43
1.72 m
2 0.81
1.62 m
3.34 m

4 1.49
5.96 m

4 3
12 pcs
1.3
15.6 m

4 0.98
3.92 m

4 0.85
3.4 m
7.32 m

2 0.39
0.78 m

4 2
8 pcs
1.3
10.4 m

6 3.18
19.08 m

6 2.75
16.5 m
35.58 m

6 1.65
9.9 m

6 1.57
9.42 m

6 4
24 pcs
1.3
31.2 m
4 3.01
12.04 m

4 2.61
10.44 m
22.48 m

4 1.55
6.2 m

4 1.55
6.2 m

4 4
16 pcs
1.3
20.8 m

4 3.52
14.08 m

4 3.4
13.6 m
27.68 m

4 1.88
7.52 m
4 3.03
12.12 m

4 5
20 pcs
1.3
26 m

110.86 m
51.05 m
59.81 m
149.5 m

2 4
6.05
48.4 M2

1 8.89
3.44
30.5816 M2

1 3.18
5.9
18.762 M2

1 3.01
2.96
8.9096 M2

1 3.53
4.35
15.3555 M2
122.0087 M2
B. SUPER-STRUCTURE
Description
1.CONCRETE WORK
1.1 FOR ELEVATION COLUMN
Ground floor
C1
circular column
D=0.25m or r=0.125m

H=2.42m
Total volume of concrete for elevation column
C2
L=0.3m
W=0.2m
H=2.42m
ditto but for C2
C3
L=0.3m
W=0.2m
H=2.42m
ditto but for C3
C4
L=0.2m
W=0.2m
H=2.42m
ditto but for C4
C5
L=0.3m
W=0.2m
H=2.42m
ditto but for C5
C6
L=0.2m
W=0.2m
H=2.42m
ditto but for C6
Total volume of concrete for ground floor Elevation Column
For first floor
C1
L=0.25m
W=0.25m
H=2.76m
ditto but for C1
C2
L=0.3m
W=0.2m
H=2.76m
ditto but for C2
C3
L=0.3m
W=0.2m
H=2.76m
ditto but for C3
C4
L=0.2m
W=0.2m
H=2.76m
ditto but for C4
C5
L=0.3m
W=0.2m
H=2.76m
ditto but for C5
Total volume of concrete for first floor elevation column
For second floor
C1
L=0.25m
W=0.25m
H=2.76m
Ditto but for C1
C2
L=0.3
W=0.2m
H=2.76m
Ditto but for C2
C3
L=0.3
W=0.2m
H=2.76m
Ditto but for C3
Total volume of concrete for second floor elevation column
FLOOR BEAM
FOR FIRST FLOOR
Grade Beam on axis A & B/1'-3
L=6.64m
W=0.2m
D=0.3m
Total volume of concrete for axis A-B/1'-3
Grade Beam on axis C & E/1-3
L=5.5m
W=0.2m
D=0.3m
Ditto but for axis C-E/1-3
Grade Beam on axis D/2-3
L=2.2m
W=0.2m
D=0.3m
Ditto but for axis D/2-3
Grade Beam on axis 1'/A-B
L=2.3m
W=0.2m
D=0.3m
Ditto but for axis 1'/A-B
Grade Beam on axis 1/C-E
L=9.1m
W=0.2m
D=0.3m
Ditto but for axis 1/C-E
Grade Beam on axis 2 & 3/A-E
L=12.3m
W=0.2m
D=0.3m
Ditto but for axis 2-3/A-E
TOTAL VOLUME OF CONCRETE FOR FIRST FLOOR BEAM
Second Floor Beam
Grade Beam on axis 2 & 3/A-E'
L=13.8m
W=0.2m
D=0.3m
Total volume of concrete for axis 2 & 3/A-E'
Grade Beam on axis 1/C-E'
L=10.5m
W=0.2m
D=0.23m
Ditto but for axis 1/C-E'
Grade Beam on axis C , D & E/1-3
L=5.5m
W=0.2m
D=0.23m
Ditto but for axis C , D & E/1-3
Grade Beam on axis A & B /2-3
L=2.2m
W=0.2m
D=0.23m
Ditto but for axis A & B/2-3
TOTAL VOLUME OF CONCRETE FOR SECOND FLOOR BEAM
FOR TOP TIE BEAM
Beam on axis 1,2 & 3/B'-E
L=7m
W=0.2m
H=0.3m
Total volume of concrete for axis 1,2 & 3/B'-E
Beam on axis B' & E/1-3
L=6.1m
W=0.2m
H=0.3m
Ditto but for axis B'&E/1-3
Total volume of concrete for Top Tie Beam
SLAB WORK
FIRST FLOOR SLAB
since the thickness of first floor slab is 15cm it should be calculated by area
because,to be in volume it should be greater than 15cm in average
Axis 2-3 /A-B
L=1.9m
W=2.2m
Total area of concrete work for axis 2-3/A-B
Axis 2-3/B-C
L=2.4m
W=2.2m
Ditto but for Axis 2-3/B-C
Axis 1-2/C-F
L=13.05m
W=3.3m
Ditto but for Axis 1-2/C-E
Axis 2-3/C-D
This is the area of the stair, the type of stair used is straight stair & it doesn't cover the
whole area, so, we have deduct the area of stair from the area of this panel
L=5.2m
W=2.2m

Total area of concrete work for axis 2-3/C-D including area of stair
DEDUCT AREA OF THE STAIR
AREA OF THE GOING
L=11*0.29=3.19m
W=1m
Total Area of the Going
AREA OF THE LANDING
L=1m
W=1.29m
Total Area of the landing
Total area of concrete work for axis 2-3/C-D excluding area of stair
Axis 2-3/D-F
L=4.95m
W=2.2m
Ditto but for Axis 2-3/D-E
Total Area of concrete work for First Floor Slab
SECOND FLOOR SLAB
Axis 1-2/B-C
L=1.3m
W=3.3m
Area of concrete work for Axis 1-2/B-C
Axis 2-3/B-C
L=1.3m
W=2.2m
Ditto but for Axis 2-3/B-C
Axis 1-2/C-D
L=5.2
W=3.3
Ditto but for Axis 1-2/C-D
Axis 2-3/C-D

This is the area of the stair, the type of stair used is straight stair & it doesn't cover the
whole area, so, we have deduct the area of stair from the area of this panel
L=5.2m
W=2.2m
Total area of concrete work for axis 2-3/C-D including area of stair
DEDUCT AREA OF THE STAIR
AREA OF THE GOING
L=11*0.29=3.19m
W=1m
Total Area of the Going
AREA OF THE LANDING
L=1m
W=1.29m
Total Area of the landing
Total area of concrete work for axis 2-3/C-D excluding area of stair
Total Area of concrete work for Second Floor Slab
FOR STAIR CASE
1.4.1 STEPS
Total volume of concrete for staircase is quantified for both flight of the level
V=n(½(r*g*l))
V=11(½(0.18*0.29*1))=0.28721m³
Concrete work on the steps of the stair
1.4.2 LANDING
For ground floor & first floor
L=1.29m
W=1m
D=0.15m
Ditto but for GF & FF.
For first floor & second floor
length of the landing L=1.29m
width W=1m
depth H=0.39m
Ditto but for FF & SF.
Total volume of concrete for landing
1.4.3 SLAB
finding L using phaytagores theorem c2=a2+b2
c2 =(2.88²+3.19²) = 4.2977m
L=4.2977
W=1m
D=0.3
Ditto but for stair slab.
Total volume of concrete for staircase
Total volume of concrete for Super Structure
FORMWORK FOR SUPER STRUCTURE
FORMWORK FOR COLUMN
FOR Ground floor
C1
circular column
the column is circular with diameter of 0.3m or r=0.15m

H=2.42m
Area of formwfork for C1
C2
L=0.3m
W=0.2m
P=2L+2W=1m
H=2.42m
Ditto but for C2
C3
L=0.3m
W=0.2m
P=2L+2W=1m
H=2.42m
Ditto but for C3
C4
L=0.2m
W=0.2m
P=2L+2W=0.8m
H=2.42m
Ditto but for C4
C5
L=0.3m
W=0.2m
P=2L+2W=1m
H=2.42m
Ditto but for C5
C6
L=0.2m
W=0.2m
P=2L+2W=0.8m
H=2.42m
Ditto but for C6
Total Area of formwork for ground floor elevation column
FOR FIRST FLOOR
C1
L=0.25m
W=0.25m
P=2L+2W=1m
H=2.76m
Area of formwfork for C1
C2
L=0.3m
W=0.2m
P=2L+2W=1m
H=2.76m
Ditto but for C2
C3
L=0.3m
W=0.2m
P=2L+2W=1m
H=2.76m
Ditto but for C3
C4
L=0.2m
W=0.2m
P=2L+2W=0.8m
H=2.76m
Ditto but for C4
C5
L=0.3m
W=0.2m
P=2L+2W=1m
H=2.76m
Ditto but for C5
Total area of formwork for First floor elevation column
FOR SECOND FLOOR
C1
L=0.25m
W=0.25m
P=2L+2W=1m
H=2.76m
Area of formwfork for C1
C2
L=0.3m
W=0.2m
P=2L+2W=1m
H=2.76m
Ditto but for C2
C3
L=0.3m
W=0.2m
P=2L+2W=1m
H=2.76m
Ditto but for C3
Total Area of formwork for Second floor elevation column
FORMWORK FOR FIRST FLOOR BEAM
Grade Beam on axis A/1'-3
L1=7.24m, The length of the outer part of formwork
L2=6.64m, The length of the inner part of formwork (Adding L1 & L2 together to get the
total length of the formwork)
H=0.65m(0.3+0.2+0.15)
Area of Formwork for axis A/1'-3
Grade Beam on axis B/1'-3
L1=6.94m
L2=6.64m
H=0.65m
Ditto but for axis B/1'-3
Grade Beam on axis C/1-3
L1=5.8m
L2=5.5m
H=0.65m
Ditto but for axis C/1-3
Grade Beam on axis E/1-3
L1=6.1m
L2=5.5m
H=0.65m
Ditto but for axis E/1-3
Grade Beam on axis D/2-3
L1=2.2m
L2=2.2m
H=0.65m
Ditto but for axis D/2-3
Grade Beam on axis 1'/A-B
L1=2.3m
L2=1.9m
H=0.65m
Ditto but for axis 1'/A-B
Grade Beam on axis 1/C-E
L1=9.1m
L2=8.5m
H=0.65m
Ditto but for axis 1/C-E
Grade Beam on axis 2/A-E
L1=11.3m
L2=11.3m
H=0.65m
Ditto but for axis 2/A-E
Grade Beam on axis 3/A-E
L=12.3m
L2=11.3m
H=0.65m
Ditto but for axis 3/A-E
Total Area of formwork for First floor Beam
FORMWORK FOR SECOND FLOOR BEAM
Grade Beam on axis 3/A-E'
L1=13.8m, The length of the outer part of formwork
L2=12.8m, The length of the inner part of formwork (Adding L1 & L2 together to get the
total length of the formwork)
H=0.65m(0.3+0.2+0.15)
Area of Formwork for axis 3/A-E'
Grade Beam on axis 2 /A-E'
L1=13.2m
L2=12.8m
H=0.65m
Ditto but for axis 2/A-E'
Grade Beam on axis 1/C-E'
L1=10.3m
L2=9.9m
H=0.65m
Ditto but for axis 1/C-E'
Grade Beam on axis A /2-3
L1=2.4m
L2=2.2m
H=0.65m
Ditto but for axis A/2-3
Grade Beam on axis B/2-3
L1=2.2m
L2=2.2m
H=0.65m
Ditto but for axis B/2-3
Grade Beam on axis C & D/1-3
L1=5.5m
L2=5.5m
H=0.65m
Ditto but for axis C & D/1-3
Grade Beam on axis E/1-3
L1=6.1m
L2=5.5m
H=0.65m
Ditto but for axis C & D/1-3
Total Area of formwork for Second floor Beam
FORMWORK FOR TOP TIE BEAM
On axis 1 & 3/B'-E
L1=6.9m, The length of the outer part of formwork
L2=6.5m, The length of the inner part of formwork (Adding L1 & L2 together to get the
total length of the formwork)
H=0.65m(0.3+0.2+0.15)
Ditto but for axis 1 & 3/B'-E
On axis 2/B'-E
L1=6.5m
L2=6.5m
H=0.65m
Ditto but for axis 2/B'-E
On axis B' & E/1-3
L1=6.1m
L2=5.5m
H=0.65m
Ditto but for axis B' & E/1-3
Total Area of formwork for Top Tie Beam
FORMWORK FOR FIRST FLOOR SLAB
We have to put the formwork at the bottom in order to support & give it the shape for the poured concrete
for the slab.
For Axis 2-3/A-C
L=7.06m
W=3.81m
Area of formwork for Axis 2-3/A-C
For Axis 1-3/C-E'
L=13.45m
W=9.09
Ditto but for axis 1-3/C-E'
Deduct area of the stair
L=7.9m
W=1.5m
Area of Stair
Area of formwork for Axis 1-3/C-E'
Total Area of formwork for First Floor Slab
FORMWORK FOR SECOND FLOOR SLAB
For Axis 1-3/C-D
L=6.9m
W=6.1m
Area of formwork for Axis 1-3/C-D including area of stair
DEDUCT AREA OF THE STAIR
L=4.1m
W=1m
Area of the stair
Area of formwork for Axis 1-3/C-D
FORMWORK FOR STAIR CASE
FORMWORK FOR STAIR CASE LANDING
Formwork beneath stair landing.
L=1.29m
W=1m
Area of formwork beneath stair Landing
Formwork for the sides of the Landing
L=1.29m+W=1m(formwork will be needed for only two sides)
D=0.15m
Area of formwork for the sides of stair Landing
TOTAL AREA OF FORM WORK FOR STAIR CASE LANDING
13.5.2 FORMWORK FOR STAIR CASE SLAB
Formwork beneath stair slab soffit.
L=4.2977m
W=1m
Area of Formwork beneath stair slab soffit.
Formwork supprting the sides of the stair slab soffit .
L=4.2977m
W=0.15m
Area of Formwork supprting the sides of the landing.
TOTAL AREA OF FORM WORK FOR STAIR CASE LANDING

13.5.3 FORMWORK FOR STAIR CASE STEPS


depth of riser for single unit is H=0.18m and
horizontal length of riser L=1m
Area of formwork for staircse steps riser.
Total area of formwork for staircase.
Total area of formwork for super structure
MASONORY WORK
HOLLOW CONCRETE BLOCK (HCB)
EXTERNAL WALL
FOR GROUND FLOOR
For the Front View
L=5.5m, use HCB20 for the external walls
H=2.89m(2.74 + 0.15 (slab thickness))
Area of the wall on the Front side of the External Wall
DEDUCT OPENING OF DOOR & WINDOW
opening of the door
L=1.22m
H=2.53m
Area of the door
opening of the window
larger window
L=2.42m
H=2.53m
Area of the larger window
smaller window
L=0.62
H=1.04
Area of the smaller window
Total Area of the wall on the Front side of the External Wall
For Right Side
L=11.3m
H=2.89m(2.74 + 0.15 (slab thickness))
Area of the wall on the Right side of the External Wall
For Left Side
L=18.74m
H=2.89m(2.74 + 0.15 (slab thickness))
Area of the wall on the Left side of the External Wall
DEDUCT OPENING OF DOORS AND WINDOWS
For larger Door
L=0.82m
H=2.53m
Area of the door
For Smaller Door
L=0.72m
H=2.53m
Area of the door
For Larger Window
L=1.52m
H=2.53m
Area of the larger window
For smaller window
L=1.52m
H=1.58m
Area of the smaller window
Total Area of the wall on the Left side of the External Wall
For Rear Side
L=6.65m
H=2.89m(2.74 + 0.15 (slab thickness))
Total Area of the wall on the Rear side of the External Wall
Total Area of the HCB20 on the Ground Floor
FOR FIRST FLOOR
For the Front View
L=5.5m, use HCB20 for the external walls
H=2.88m(2.73 + 0.15(Slab Thickness))
Area of the wall on the Front side of the External Wall
DEDUCT OPENING OF WINDOWS
larger window
L=2.12m
H=1.63m
Area of the larger window
smaller window
L=1.22m
H=1.63m
Area of the smaller window
Total Area of the wall on the Front side of the External Wall
For Right Side
L=11.3m
H=2.88m(2.73 + 0.15(Slab Thickness))
Area of the wall on the Right side of the External Wall
For Left Side
L=17.22m
H=2.88m(2.73 + 0.15(Slab Thickness))
Area of the wall on the Left side of the External Wall
DEDUCT OPENING OF WINDOWS
For Larger Window
L=1.22m
H=1.53m
Area of the larger window
For smaller window
L=0.62m
H=1.53m
Area of the smaller window
Total Area of the wall on the Left side of the External Wall
For Rear Side
L=2.2m
H=2.88m(2.73 + 0.15(Slab Thickness))
Total Area of the wall on the Rear side of the External Wall
Total Area of the HCB20 on the First Floor
FOR SECOND FLOOR
For the Front View
L=5.5m, use HCB20 for the external walls
H=2.93m(2.78 + 0.15(Slab Thickness))
Area of the wall on the Front side of the External Wall
DEDUCT OPENING OF WINDOWS
Smaller window
L=2.12m
H=1.52m
Area of the larger window
Larger window
L=2.2m
H=1.52m
Area of the smaller window
Total Area of the wall on the Front side of the External Wall
For Right Side
L=6.5m
H=2.73m
Area of the wall on the Right side of the External Wall
For Left Side
L=6.5m
H=2.73m
Area of the wall on the Left side of the External Wall
For Rear Side
L=6.1m
H=2.73m
Total Area of the wall on the Rear side of the External Wall
DEDUCT OPENING OF WINDOWS
Larger window
L=1.22m
H=1.35m
Area of the larger window
Smaller window
L=1.22m
H=0.88m
Area of the larger window
Total Area of the wall on the Rare side of the External Wall
Total Area of the HCB20 on the Second Floor
Total Area of the HCB20 For the Building
INTERNAL WALL
FOR GROUND FLOOR
Total internal wall length is L=13.75m(use HCB15 block for internal walls)
H=2.68m
Total area of HCB15 on Ground Floor Internal Walls
FOR FIRST FLOOR
L=16.28m
H=2.73m
Total area of HCB15 on First Floor Internal Walls
FOR SECOND FLOOR
L=9.55
W=2.73
Total area of HCB15 on Second Floor Internal Walls
Total area of HCB15 For the Building
PLASTERING
For External Wall
The area of Plastering work For External wall is Equal to The Area of HCB20 For the
Building(we have to multiply it by two, For two Faces of the Wall)
For internal wall
The area of Plastering work For Internal wall is Equal to The Area of HCB15 For the
Building(we have to multiply it by two, For the two faces of the wall)
Total area of Plastering Work For the Building
CEILING PLASTERING WORKS
GROUND FLOOR CEILING PLASTERING
This ceiling plastering is done under the slab(soffit of the slab)
Axis 2-3 /A-B
L=1.9m
W=2.2m
Total area of ceiling work for axis 2-3/A-B
Axis 2-3/B-C
L=2.4m
W=2.2m
Ditto but for Axis 2-3/B-C
Axis 1-2/C-F
L=13.05m
W=3.3m
Ditto but for Axis 1-2/C-F
Axis 2-3/C-D
We have already calculated the area this section when we were calculating area of slab
by deducting area of the stair from the total area
Total area of ceiling work for axis 2-3/C-D excluding area of stair
Axis 2-3/D-F
L=4.95m
W=2.2m
Ditto but for Axis 2-3/D-F
Total Area of ceiling work for Ground Floor
FIRST FLOOR CEILING PLASTERING
Axis 1-2/B-C
L=1.3m
W=3.3m
Area of ceiling work for Axis 1-2/B-C
Axis 2-3/B-C
L=1.3m
W=2.2m
Ditto but for Axis 2-3/B-C
Axis 1-2/C-D
L=5.2
W=3.3
Ditto but for Axis 1-2/C-D
Axis 2-3/C-D
We have already calculated the area this section when we were calculating area of slab
by deducting area of the stair from the total area
Total area of ceiling work for axis 2-3/C-D excluding area of stair
Total Area of ceiling work for First Floor
PAINTING
Total area of painting is the same as Total plastering area Plus Total Area of Plastering of
the Ceiling
SKIRTING
Total length of skirting provided for internal wall of ground floor
deducting length of door
Total length of skirting provided for ground floor after deducting door length
Total length of skirting provided for internal wall of first floor internal
deducting length of door
Total length of skirting provided for first floor after deducting door length
Total length of skirting provided for internal wall of second floor
deducting length of door
Total length of skirting provided for second floor after deducting door length
Total length of skirting provided for the building
FLOOR FINISH
FOR GROUND FLOOR
Total area of floor finish provided by ceramics including verendah
FOR FIRST FLOOR
Total area of floor finish provided by ceramics
Total area of floor finish provided by pvc tiles
FOR SECOND FLOOR
Total area of floor finish provided by ceramics
Total area of floor finish provided by pvc tiles
Total area of floor finish provided by ceramics on the building
Total area of floor finish provided by pvc tiles on the building
CEILING
GYPSUM BOARD FOR CEILING

This ceiling work is done under roof of the building. It is also called Gypsum Boared Ceiling work
GROUND FLOOR CEILING WORK
Axis 1-2/A-B
L=1.9m
W=4.44m
Total Area Gypsum Board of ceiling work for Ground Floor
FIRST FLOOR CEILING WORK
Axis 2-3/A-B
L=1.9m
W=2.2m
Area of Gypsum Boared Ceiling work for Axis 2-3/A-B
Axis 2-3/B-C
L=1.1m
W=2.2m
Ditto but for Axis 2-3/B-C
Axis 1-2/D-F
L=3.2
W=3.3
Ditto but for Axis 1-2/D-F
Axis 2-3/D-F
L=3.2
W=2.2m
Ditto but for Axis 2-3/D-F
Total Area of Gypsum Board ceiling work for First Floor
SECOND FLOOR CEILING
Axis 1-2/B'-E
L=6.5m
W=3.2m
Area of Gypsum Board Ceiling work for Axis 1-2/B'-E
Axis 2-3/B'-E
L=6.5m
W=2.2m
Area of Ceiling work for Axis 2-3/B'-E
Total Area of Gypsum Boared ceiling work for Second Floor
Total Area of Gypsum Boared ceiling work for the Building
8. DOWN PIPE
It is measured by meter or by length
12 number of down pipe installed in different sides of the building( taking 2 down pipes for each roof
panels)
L=8.64
Total length of down pipe for the building
GUTTER
For Gound Floor on Axis 1-2/A-B
Total length of Gutter
For First Floor on Axis 2-3/A-C & 1-3/D-F
For Axis 2-3/A-C
For Axis 1-3/ D-F
Total length of Gutter
For Second Floor on Axis 1-3/B'-E
Total length of Gutter( for the three faces of the roof)
Total length of Gutter For The Building
METAL WORK
METAL WORK FOR DOOR AND WINDOW
According to BATCODA section 10 no. 1052 Doors and windows shall be enumerated by stating sizes(L x
W). Their unit of measurement should be in cm.
FOR WINDOW FRAME
FOR GROUND FLOOR
For Front Side
Size of The Larger window
Size of The Smaller window
Size of The Larger window for the service rooms
Size of The Smaller window for the service rooms
For Left Side
Size of The Larger window
For Rear Side
Size of The Larger window
Total area of window Frame for the Ground Floor
FOR FIRST FLOOR
For Front Side
Size of The Larger window
Size of The Smaller window
For Left Side
Size of The window
For Rear Side
Size of The window
Total Area of window Frame for the First Floor
FOR SECOND FLOOR
For Front Side
Size of The Larger window
Size of The Smaller window
For Rear Side
Size of The Larger window
Size of The Smaller window
Total Area of window Frame for the Second Floor
Total Area of window Frame for the Building
METAL WORK FOR DOORS
EXTERNAL DOORS
For Front Side
Size of The Door
Size of The Door for the service rooms
For Left Side
Size of The Door for the Kitchen
Total Area of External Doors
INTERNAL DOORS
FOR GROUND FLOOR
Size of the Door for Store room & Wash room
Size of the Door for the Corridor
FOR FIRST FLOOR
Size of the Door for the Master & Two Bed Room's Bath room
Size of the Door for the Master & Two Bed Rooms
FOR SECOND FLOOR
Size of the Door for the Bath room
Size of the Door for the Bed Room, Family room & Balcony
Total Area of Internal Doors
10.2 HANDRAIL FOR STAIR
Aluminium steel metal
Length of Handrail for the top & bottom of the Stair( thickness of 5cm)
Total Length of handrail
Length of Baluster for the Stair(thickness of 2cm)
Total Length of Baluster of H=0.96m
10.3 HANDRAIL FOR VERANDAH & BALCONY
Length of Aluminum handrail for the Varendah
Length of Aluminum handrail for the Balcony on the Second Floor
Total Length of Aluminum handrail for the Varendah & Balcony(Thickness of 5cm)
Length of Aluminum Baluster for the Varendah with H=0.96m
Length of Aluminum Baluster for the Balcony on the Second Floor with H=0.96m
Total Length of Aluminum Baluster for the Varendah & Balcony(Thickness of 2cm)
11. DOOR & WINDOW SILL
It is installed under Door & Window and measured by meter
For Door
Main Door on the Front Side, Add 3cm on both side of the sill in order to make the sill rigid
Ditto but for the Service rooms
Ditto but for the Kitchen
Total Length of Door Sill required
For Window
FOR GROUND FLOOR
Larger window on the Front Side, Add 3cm on both side of the sill in order to make the sill rigid
Ditto but For the Smaller window on the Front Side
Ditto but For the larger window on the Service Rooms
Ditto but For the Smaller window on the Service Rooms
Ditto but For the window on the Kitchen
Ditto but For the window on the Living & Dinning
Total Length of Window Sill required For Ground Floor
FOR FIRST FLOOR
Larger window on the Front Side, Add 3cm on both side of the sill in order to make the sill rigid
Ditto but For the Smaller window on the Front Side
Ditto but For the window on the Left Side
Ditto but For the window on the bath room
Total Length of Window Sill required For First Floor
FOR SECOND FLOOR
For window on the Front Side, Add 3cm on both side of the sill in order to make the sill rigid
Ditto but For the window on the Rear Side
Total Length of Window Sill required For Second Floor
GLAZING
GLAZING WORK FOR DOOR
FOR GROUND FLOOR
Area of Glazing Work For the Front Side on Top of the Wooden Door
Area of Glazing Work For the Service room Doors, they are aluminium doors so we have to deduct area of
the panel from full area
Ditto but for the Kitchen
Total Area of Glazing work for the Doors
GLAZING WORK FOR WINDOW
Use 6mm,Transparent & clear Glass, transmitting light and capable of distinctly showing objects through.
FOR GROUND FLOOR
For Front Side
Area of Glazing Work for The Larger window
Area of Glazing Work for The smaller window
Area of Glazing Work for The Larger window on the Service rooms
Area of Glazing Work for The smaller window on the Service rooms
For Left Side
Area of Glazing Work for The Larger window
For Rear Side
Area of Glazing Work for The Larger window
Total Area of Glazing work for the Ground Floor
FOR FIRST FLOOR
For Front Side
Area of Glazing Work for The Larger window
Area of Glazing Work for The smaller window
For Left Side
Area of Glazing Work for the window
For Rear Side
Area of Glazing Work for the window
Total Area of Glazing work for the First Floor
FOR SECOND FLOOR
For Front Side
Area of Glazing Work for The Larger window
Area of Glazing Work for The smaller window
For Rear Side
Area of Glazing Work for The Larger window
Area of Glazing Work for The smaller window
Total Area of Glazing work for the Second Floor
Total Area Glazing work of for the Building
ELECTRICAL INSTALLATION
1. POWER
1.1 SOCKET
For ground floor
Single Socket Outlet 16/10A,250V

Double socket outlet

Water Heater Outlet 16A,250V

TV cable outlet
Tel/Data cabel outlet

For first floor


Single Socket Outlet 16/10A,250V

Double socket outlet

Water Heater Outlet 16A,250V

TV cable outlet

Tel/Data cabel outlet

For second floor


Single Socket Outlet 16/10A,250V

Double socket outlet

Water Heater Outlet 16A,250V

TV cable outlet

Tel/Data cabel outlet

TOTAL

Single Socket Outlet 16/10A,250V

Double socket outlet

Water Heater Outlet 16A,250V

TV cable outlet

Tel/Data cabel outlet

1.3 MAIN DISTRIBUTION BOARD


On the Ground Floor
Supply from EEPCO, Total Power 30.57KVA, D.F=00.600
Smax=18.34KVA, Main Switch 40A/3P, Feeder(4x10+1x10) sqmm
1.2 SUB DISTRIBUTION BOARD
On the First and Second floor
Power Source from MDB,Power Connected 16.1KVA,D.F=00.700
Smax=11.270, Main Switch 25A/3P, Feeder(4x6+1x6 )sqmm
1.4. LIGHTING SYSTEM
1.4.1 LAMPS
Single Lamp Fluorescent Lamp (1x18W)
For Ground Floor

Ceilling Mounted Incadescent Lamp(60W)

For Ground Floor


For First Floor
For Second Floor
Wall Mounted Incadescent Lamp

For Ground Floor


For First Floor
For Second Floor
TOTAL
Single Lamp Fluorescent Lamp (1x18W)
Ceilling Mounted Incadescent Lamp(60W)
wall Mounted Incadescent Lamp
1.4.2 SWITCHES
For ground floor

One way switch

double switch

Two way switch

Bell Button

Bell / Buzzer

For first floors

one way switch

double switch
Two way switch

Bell Button

For second floors

One way switch

double switch

Two way switch

Bell Button

TOTAL
Total number of one way switches
Total number of double switches
Total number of two way switch
Total number of Bell Button
Total number of Bell / Buzzer
2. WIRE
2.1 WIRE FOR SOCKET OUTLET
total length of wire for socket wire of 2.5 mm² for the ground floor.
total length of wire for socket wire of 2.5 mm² for the first floor.
total length of wire for socket wire of 2.5 mm² for the second floor.
total length of wire for socket wire of 2.5 mm².
2.2 WIRE FOR LIGHTING
total length of wire for lighting for the ground floor.
total length of wire for lighting for the first floor.
total length of wire for lighting for the second floor.
total length of wire for lighting.
3. CONDUIT
it is provided according to the length of wire for socket &
lighting system
total length of conduit for socket system
total length of conduit for lighting system
SANITARY WORK
1. PIPE WORK
1.1 water supply
Ø 25mm Inlet pipe into the water Tank From the Source
Ø 20mm For Water out Let 1 (W1) from Water Tank
Length of the pipe For Cold Water
Length of the pipe For Hot Water
Length of the pipe For W1 water out let
Ø 20mm For Water out Let 2 (W2) from Water Tank
Length of the pipe For Cold Water
Length of the pipe For Hot Water
Length of the pipe For W2 water out let
Ø 20mm For Water out Let 3 (W3) from Water Tank
Length of the pipe For Cold Water
Total length of Water supply of Ø 20mm pipe For both Cold & Hot water
1.2 waste water
Length of Ø110 S1 PVC pipe
Length of Ø110 S2 PVC pipe
Length of Ø50 for HWB & FD PVC pipe
sanitary fixtures
For Ground floor
Water Closet(WC)
Hand Wash Basin(HWB)
Floor Darin(FD)
Shower Head (SH) & Shower Tray
Sink
Water Heater(WH)
For first floor
Water Closet(WC)
Hand Wash Basin(HWB)
Shower Head (SH) & Shower Tray
Water Heater(WH)
Floor Darin(FD)
Bath
For second floor
Hand Wash Basin(HWB)
Water Closet(WC)
Shower Head (SH) & Shower Tray
Water Heater(WH)
Floor Darin(FD)
Total Number of Hand Wash Basin(HWB)
Total Number of Water Closet(WC)
Total Number of Shower Head (SH) & Shower Tray
Total Number of Water Heater(WH)
Total Number of Floor Darin(FD)
Total Number of Bath
Total Number of Sink
SEPTIC TANK
1. Excavation Work for Septic Tank
L=3.8
W=3.3
H=3.7, includes height of the upper & Lower Slab, Masonary Wall, Hard Core & 15cm Compacted Soil
Total Volume of Excavation work for Septic Tank
1. Stone Work for Septic Tank
Hard core
L=3.8
W=3.3
Total Area of Hard Core work for Septic Tank
Masonary Work for Septic Tank
The shape of the masonary wall is triangular, so we have to separately calculate the volume(Rectangular
&triangle)
For rectangular Shape
For Longer side
L=3.3
W=0.4
H=3
Volume of Excavation work for longer Side
For Shorter side
L=2.8
W=0.4
H=3
Volume of Excavation work for Shorter Side
For Triangular Shape
For Longer side
A=0.5xAbxH, Ab=LxW
L=3.8
W=0.5
H=3
Volume of Excavation work for Longer Side
For Shorter side
A=0.5xAbxH, Ab=LxW
L=3.3
W=0.5
H=3
Volume of Excavation work for Shorter Side
Total Volume of Excavation work for Septic Tank
Concrete Work for Septic Tank
Slab Work
For the Upper Layer of the Septic Tank
L=3.3
W=2.8

DEDUCT the Area of cover


L=0.5
W=0.5

Area of Slab work for the Upper Layer


For the Bottom Layer of the Septic Tank
L=3.8
W=3.3
Area of Slab work for the the Bottom Layer
Total Area of Slab work
Plastering & Rendering Work for Septic Tank
For External Wall
Total Length of the wall, L=2*3.3 + 2*2.8=12.2m
H=3m
Area of External wall Plastering Work for Septic Tank
For Internal Wall
Total Length of the wall, L=2*2.5 + 2*2=9m
H=3m
Area of Internal wall Plastering Work for Septic Tank
Total Area of Plastering Work for Septic Tank
ROOF WORK
ROOF TRUSS WORK

TRUSS-1

A.ECULYPTUS HORZONTAL MEMBER Dia. 12


UPPER MEMBER OF TRUSS
L=3.66m,Calculated by C2=(3.45)2+(1.23)2
length of upper member
LOWER MEMBER
L=3.45m

length of rafter for TR-1


Total length of Dia. 12 Horizontal Member for TR-1
B.POSTS dia10
it is vertical member of truss
total length of POSTS is calculated to be L=2.55m

The larger Vertical member that joins two or more truss 1 members L=1.82m

Total length of Post


C.BRACE dia 8
The inclind member of the truss
L=3.73m
Total length of Brace
D.PURLIN dia8 50/70
COUNT TOTAL NUMBER OF PURLIN FROM THE GIVEN DRAWING

Total No of purlin
Length of Purlin on a single Truss=1.3m
Total Length of Purlin
TRUSS -2

A.ECULYPTUS HORZONTAL MEMBER Dia. 12


UPPER MEMBER OF TRUSS
L=2.3m,Calculated by C2=(2.15)2+(0.81)2
length of upper member
LOWER MEMBER
L=2.15m

length of rafter for TR-2


Total length of Dia. 12 Horizontal Member for TR-2
B.POSTS Dia10
it is vertical member of truss
Total length of POSTS is calculated to be L=0.43m
The larger Vertical member that joins two or more truss 2 members L=0.81m

Total length of Post


C.BRACE Dia 8
The inclind member of the truss
L=1.49m
Total length of Brace
D.PURLIN Dia8 50/70
COUNT TOTAL NUMBER OF PURLIN FROM THE GIVEN DRAWING

Total No of purlin
Length of Purlin on a single Truss=1.3m
Total Length of Purlin
TR-3

A.ECULYPTUS HORZONTAL MEMBER Dia. 12


UPPER MEMBER OF TRUSS
L=0.98m,Calculated by C2=(0.85)2+(0.39)2
length of upper member
LOWER MEMBER
L=0.85m

length of rafter for TR-3


Total length of Dia. 12 Horizontal Member for TR-3
B.POSTS Dia10
it is vertical member of truss
Total length of POSTS is calculated to be L=0.39m
The larger Vertical member that joins two or more truss 2 members L=0.39m
C.PURLIN Dia8 50/70
COUNT TOTAL NUMBER OF PURLIN FROM THE GIVEN DRAWING

Total No of purlin
Length of Purlin on a single Truss=1.3m
Total Length of Purlin
TR-4

A.ECULYPTUS HORZONTAL MEMBER Dia. 12


UPPER MEMBER OF TRUSS
L=3.18m,Calculated by C2=(2.75)2+(1.01)2
length of upper member
LOWER MEMBER
L=2.75m

length of rafter for TR-4


Total length of Dia. 12 Horizontal Member for TR-4
B.POSTS Dia10
it is vertical member of truss
Total length of POSTS is calculated to be L=1.65m
Total length of Post
C.BRACE Dia 8
The inclind member of the truss
L=1.57m
Total length of Brace
D.PURLIN Dia8 50/70
COUNT TOTAL NUMBER OF PURLIN FROM THE GIVEN DRAWING

Total No of purlin
Length of Purlin on a single Truss=1.3m
Total Length of Purlin
TR-5
A.ECULYPTUS HORZONTAL MEMBER Dia. 12
UPPER MEMBER OF TRUSS
L=3.01m,Calculated by C2=(2.61)2+(0.96)2
length of upper member
LOWER MEMBER
L=2.61m

length of rafter for TR-5


Total length of Dia. 12 Horizontal Member for TR-5
B.POSTS Dia10
it is vertical member of truss
Total length of POSTS is calculated to be L=1.55m
Total length of Post
C.BRACE Dia 8
The inclind member of the truss
L=1.55m
Total length of Brace
D.PURLIN Dia8 50/70
COUNT TOTAL NUMBER OF PURLIN FROM THE GIVEN DRAWING

Total No of purlin
Length of Purlin on a single Truss=1.3m
Total Length of Purlin

TR-6
A.ECULYPTUS HORZONTAL MEMBER Dia. 12
UPPER MEMBER OF TRUSS
L=3.52m
length of upper member
LOWER MEMBER
L=3.4m

length of rafter for TR-2


Total length of Dia. 12 Horizontal Member for TR-6
B.POSTS Dia10
it is vertical member of truss
Total length of POSTS is calculated to be L=1.88m
Total length of Post
C.BRACE Dia 8
The inclind member of the truss
L=3.03m
Total length of Brace
D.PURLIN Dia8 50/70
COUNT TOTAL NUMBER OF PURLIN FROM THE GIVEN DRAWING

Total No of purlin
Length of Purlin on a single Truss=1.3m
Total Length of Purlin

Total length of Dia. 12 Horizontal Member


Total length of Dia. 10 Post
Total length of Dia. 8 Brace
Total Length of Purlin
ROOF COVER

For Truss 1,2 & 3 that has slope to the Front Side & Rear Side
L=4m
W=6.05m
Area of the Roof Cover For Slope on Front & Rear Sides
For Truss 1,2 & 3 that has slope to the Left Side
L=3.44m
W=8.89m
Area of the Roof Cover For Slope on the Left Sides
For Truss 4
L=3.18m
W=5.9m
Area of the Roof Cover For Truss 4
For Truss 5
L=3.01m
W=2.96m
Area of the Roof Cover For Truss 5
For Truss 6
L=3.53m
W=4.35m
Area of the Roof Cover For Truss 6
Total Area of the Roof Cover
location Shape ɸ(mm) Length(m)

For Footing Pad

12 2.55
F1

F2 12 2.3

12 1.85
F3

10 1.45
F4

10 1.45
F5

Footing column

C1 16 3.65

Stirrup 8 1.1
C2 14 3.65

Stirrup 8 1.1

14 3.65
C3

Stirrup 8 1.1
14 3.65
c4
Stirrup 8 0.9
14 3.65
c5
Stirrup 8 1.1
12 3.6
c6
stirrup 8 0.9
Foundation Reinforcement Bar
Mashing
Axis Along 1'-2/A-B X 8 3.95
Y 8 2.42
axis Along 2-3/A-B' X 8 1.7
Y 8 1.39
X 8 1.7
Axis2-3/B'-C
Y 8 1.9
Axis2'-2/B-C X 8 0.3
Y 8 0.89
Axis1-2/C-C' X 8 2.8
Y 8 3.3
Axise2-3/C-D X 8 1.7
Y 8 4.7
Axis1-2/C'-E X 8 2.8
Y 8 2.7
Axis2-3/D-E X 8 1.7
Y 8 1.3
Axis1-2/E-F X 8 2.8
Y 8 0.8
Axis2-3/E-F X 8 1.3
Y 8 1.7

Elevation Column for ground


16 3.52
C1
Stirrup 8 1.1
14 3.52
C2
Stirrup 8 1.1
16 3.52
C3
Stirrup 8 1.1
14 3.52
C4
Stirrup 8 0.9
C5 14 3.52
stirrup 8 1.1
C6 12 3.6
stirrup 8 0.7
for first floor
C1 16 3.86
stirrup 8 1.1
C2 14 3.86
stirrup 8 1.1
C3 16 3.86
stirrup 8 1.1
C4 14 3.52
stirrup 8 0.9
C5 14 3.19
stirrup 8 1.1
for secod floor
C1 14 3.19
stirrup 8 1.1
C2 14 3.19
stirrup 8 1.1
C3 14 3.19

For Grade beams


top 14 8.07
ON- AX 1/C-E
14 15.9
Stirrup 8 1

bottom 14 8.07
neg bar 14 3.05
Stirrup 8 1.2
axis 2/A-E
top 16 9.44
top 12 4.14
bottom 12 2.18
bottom 16 5.60
bottom 12 4.89
neg bar 16 3.3
neg bar 16 3.6
Stirrup sectionE 8 1.2
Stirrup sectio 8 1.10
ON-AX3/A-C
top 12 7.71
bottom 12 4.87
negative 14 1.35
ON-AX3 ON-AX3/D-E
top 14 4.07
bottom 14 3.57
stirrups/A-C 8 1.2
stirrups/D-E 8 1.10

top 12 3.07
ON-Axis D/3-2 bottom 12 2.57
Stirrup 8 1.20
top 12 7.71
bottom 12 4.82
ON-AX B/1'-3 bottom 12 2.59
negative 14 1.35
Stirrup 8 1.20
top 12 6.56
bottom 12 3.67
ON-AX C/1-3
bottom 12 2.59
Stirrup 8 1.2
top 12 7.71

ON-AX A/1'-3
bottom 12 4.82
ON-AX A/1'-3 bottom 12 2.59
negative 12 1.35
Stirrup 8 1.2
ON-AX E/1-3
top
14 6.55
ON-AX E/1-3 bottom 14 6.05
negative 14 1.97
bottom 14 6.8
Stirrup 8 1.2
ON-AX F/2-3 top 12 0
bottom 12 0
Stirrup 12 1.2
ON-AX 1'/B'-A top 12 2.9
bottom 12 3.7
stirup 12 1.2
ON-AX B'/2-3 top 14 2.5
bottom 14 3.3
For First Floor beams
top 14 8.07
ON- AX 1/C-E 14 15.9
Stirrup 8 1

bottom 14 8.07
neg bar 14 3.05
Stirrup 8 1.1
axis 2/A-E
top 16 9.44
top 12 4.14
bottom 12 2.18
bottom 16 5.60
bottom 12 4.89
neg bar 16 3.3
neg bar 16 3.6
Stirrup sectionE 8 1.1
Stirrup sectio 8 1.10
ON-AX3/A-C
top 12 7.71
bottom 12 4.87
negative 14 1.35
ON-AX 3 ON-AX3/D-E
top 14 4.07
bottom 14 3.57
stirrups/A-C 8 1.1
stirrups/D-E 8 1.10

top 12 3.07
ON-Axis D/3-2 bottom 12 2.57
Stirrup 8 1.10
top 12 7.71
bottom 12 4.82
ON-AX B/1'-3 bottom 12 2.59
negative 14 1.35
Stirrup 8 1.10
top 12 6.56
bottom 12 3.67
ON-AX C/1-3
bottom 12 2.59
Stirrup 8 1.1
top 12 7.71
bottom 12 4.82
ON-AX A/1'-3 bottom 12 2.59
negative 12 1.35
Stirrup 8 1.1
ON-AX E/1-3
top
14 6.55
ON-AX E/1-3 bottom 14 6.05
negative 14 1.97
bottom 14 6.8
Stirrup 8 1.1

Axis 2,3/B' main bar 10 0.25


10 0.29
Axis B'C/2,3 10 0.25
10 0.29
Axis 1,2,3/C,C'
10 0.6
12 0.64

Axis C',D,E/1,2,3
10 0.6
10 0.64
10 0.6
10 0.64
Distribution bar
Axis 1-2/C,E 10 0.75
10 0.77
Axis 2,3/A,E
10 0.485
10 0.796
Axis 1,2/E,D,C',C
10 0.565
10 0.755
ROOF BEAM REINFORCEMENT
top 14 3.44
top 16 4.73
negative 14 3.24
negative 16 2.96

RB on axis1/C-D
bottom 14 6.87
RB on axis1/C-Dstirrups 8 1.1
top 16 7.73
negative 16 3.43
bottom 14 6.87
8 1
14 17.2
strrups 8 1.1
RB on axis2/c-d
A. BAR SCHEDULE.
Spacing(cm) Number of member & bar T. length(m)

No of bar/member

No of member

T.no of bar
12 34 2 68 173.4

15 30 3 90 207

14 22 2 44 81.4

14 20 2 40 58

15 16 1 16 23.2

8 1 8 29.2

20 9 1 9 9.9
6 3 18 65.7

20 9 3 27 29.7

8 2 16 58.4

20 9 2 18 19.8
4 6 24 87.6
20 9 6 54 48.6
4 1 4 14.6
20 28 1 28 30.8
4 2 8 28.8
20 13 2 26 23.4

20 13 1 13 82.95
20 21 1 21 31.46
20 8 1 8 17
20 10 1 10 27.12
20 11 1 11 17
20 10 1 10 20.9
20 5 1 5 0.9
20 3 1 3 4.45
20 18 1 18 42
20 15 1 15 59.4
20 25 1 25 17
20 10 1 10 117.5
20 15 1 15 42
20 15 1 15 42
20 8 1 8 17
20 10 1 10 22.4
20 5 1 20 2.24
20 15 1 15 4
20 10 1 10 13
20 8 1 8 10.4

8 1 8 28.16
20 19 1 19 20.9
6 3 18 63.36
20 19 3 57 62.7
8 2 16 56.32
20 19 2 38 41.8
4 6 24 84.48
20 19 6 114 102.6
4 1 4 14.08
20 19 1 19 20.9
4 2 8 28.8
20 13 2 26 18.2

8 1 8 30.88
20 20 1 20 22
6 3 18 69.48
20 20 3 60 66
8 2 16 61.76
20 20 2 40 44
4 6 24 84.48
20 20 6 120 108
4 1 4 12.76
20 20 1 20 22
6 1 6 19.14
12 1 12 13.2
6 3 18 57.42
12 3 36 39.6
6 2 12 38.28

2 1 2 16.14

3 2 6 95.4
20 81 2 162 162
0 0
2 1 2 16.14
2 1 2 6.01
39 1 39 46.8

2 1 2 18.88
2 1 2 14.58
2 1 2 4.36
4 1 4 22.4
2 1 2 9.78
2 1 2 6.6
2 1 2 7.2
35 1 35 38.5
28 1 28 30.8

2 1 2 15.42
2 1 2 9.74
2 1 2 2.7

2 1 2 8.14
2 1 2 7.14
25 1 25 27.5
19 1 19 20.9

2 1 2 6.14
2 1 2 5.14
14 1 14 16.8
2 1 2 15.42
3 1 3 14.46
2 1 2 5.18
2 1 2 2.70
37 1 37 44.4
2 1 2 13.12
2 1 2 7.34
2 1 2 5.18
34 1 34 37.4
2 1 2 15.42
3 1 3 14.46
2 1 2 5.18
1 1 1 1.35
37 1 37 44.4

2 1 2 13.1
2 1 2 12.1
1 1 1 1.97
2 1 2 13.6
31 1 31 34 1
3 1 3 0
3 1 3 0
13 1 13 15.6
3 1 3 8.7
3 1 3 11.1
12 1 12 14.4
3 1 3 7.5
2 1 2 6.6

2 1 2 16.14
3 2 6 95.4
20 81 2 162 162
0 0
2 1 2 16.14
2 1 2 6.01
39 1 39 42.9

2 1 2 18.88
2 1 2 14.58
2 1 2 4.36
4 1 4 22.4
2 1 2 9.78
2 1 2 6.6
2 1 2 7.2
35 1 35 38.5
28 1 28 30.8

2 1 2 15.42
2 1 2 9.74
2 1 2 2.7

2 1 2 8.14
2 1 2 7.14
25 1 25 27.5
19 1 19 20.9

2 1 2 6.14
2 1 2 5.14
14 1 14 15.4
2 1 2 15.42
3 1 3 14.46
2 1 2 5.18
2 1 2 2.70
37 1 37 40.7
2 1 2 13.12
2 1 2 7.34
2 1 2 5.18
34 1 34 37.4
2 1 2 15.42
3 1 3 14.46
2 1 2 5.18
1 1 1 1.35
37 1 37 40.7

2 1 2 13.1
2 1 2 12.1
1 1 1 1.97
2 1 2 13.6
31 1 31 34 1
GROUND FLOOR SLAB MESH
0.2 10 1 2.5
0.2 10 1 0.29
0.2 12 1 3
0.2 12 1 3.48

0.15 35 1 21
0.13 40 1 25.6

0.2 16 1 9.6
0.12 27 1 17.28
0.2 16 9.6
0.12 27 1 17.28

0.18 19 1 14.25
0.13 26 1 20.02

0.2 12 1 5.82
0.2 12 1 9.552

0.2 12 1 6.78
0.2 12 1 9.06
MENT
2 1 2 6.88
2 1 2 14.6
2 1 2 6.48
2 1 2 5.92
2 1 2 13.74
35 1 35 38.5
2 1 2 15.46
2 1 2 6.86
2 1 2 13.74
20 28 1 28 28
3 2 6 103.2
35 1 38.5

Total Lengt
Unit wt in
Total Weigh
ULE.
Total length of bar dia(F)

6 8 10 12 14 16
173.4

207

81.4

2.24

4.96

2.88

0.99
6.57

29.7

58.4

19.8
87.6
48.6
14.6
30.8
28.8
23.4

82.95
31.46
17
27.12
17
20.9
1.5
4.45
42
59.4
17
117.5
42
42
17
10.4
12
4
13
10.4

28.16
20.9
63.36
62.7
56.32
41.8
84.48
102.6
14.08
20.9
28.8
18.2

28.16
13.5
69.48
40.5
61'76
27
76.56
63
12.76
13.5
19.14
15.3
57.42
45.9
38.28

16.14

95.4
162

16.14
6.01
46.8

18.88
8.28
4.36
22.4
9.78
6.6
7.2
42
30.8

15.42
9.74
2.7

8.14
7.14
30
20.9 20.90

0.00
6.14
5.14
16.8
15.42
14.46
5.28
2.70
44.4
13.12
7.34
5.18
40.8 40.8
15.42
14.46
5.18
1.35
44.4

13.1
12.1
1.97
13.6
37.2
0
0
15.6
8.7
11.1
14.4
7.5
6.6

16.14
95.4
162

16.14
6.01
42.9

18.88
8.28
4.36
22.4
9.78
6.6
7.2
38.5
30.8

15.42
9.74
2.7

8.14
7.14
27.5
20.9 20.90

0.00
6.14
5.14
15.4
15.42
14.46
5.28
2.70
40.7
13.12
7.34
5.18
37.4 37.4
15.42
14.46
5.18
1.35
40.7

13.1
12.1
1.97
13.6
34.1
MESH
2.5
0.29
3
3.48

21
25.6

9.6
17.28
9.6
17.28

14.25
20.02

5.82
9.552

6.78
9.06

6.88
14.6
6.48
5.96
13.74
38.5
15.46
6.86
13.74
28
103.2
42.35

38.5 1492 165.57 461.68 1157 222.8


0.222 0.395 0.617 0.888 1.209 1.579
8.547 589.28 102.16 409.97 1399 351.801
a(F)

18 20 24
0.00
0.00
0 0
1.998 2.467
0 0

You might also like