CEM Lecture Notes
CEM Lecture Notes
Management
2
Topics
1) Management Functions and introduction of construction project
planning and scheduling
2)Construction scheduling techniques
3)Preparation and usage of bar charts
4)Preparation and usage of the Critical Path Method (CPM)
5)Preparation and usage of Precedence Diagramming Method (PDM)
6)Issues relating to determination of activity duration
7)Contractual provisions relating to project schedules
8)Resource leveling and constraining
9)Time cost tradeoff
10)Schedule monitoring and updating.
11)Communicating schedule
12) Project control and earned value Control
13) claims, Safety and Quality control
3
● Within Time
● Within Cost
● Measurement of accomplishment
against plans
8
● Planning
● Organizing
● Staffing
● Controlling
● Directing
9
Planning
Organizing
Leading
ENGINEERING
Resources
ENGINEERING
MANAGEMENT
● Money
● Manpower
● Equipment
● Facilities
● Materials
● Information/technology
14
ENGINEERING
ENGINEERING
MANAGEMENT
ENGINEERING
MANAGEMENT
ENGINEERING
MANAGEMENT
How
What
much
By
when
whom
The Plan
How where
Why
The Plan
ENGINEERING
MANAGEMENT
ENGINEERING
ENGINEERING
MANAGEMENT
• procurement,
• project/contract administration,
• quality management,
ENGINEERING
MANAGEMENT
or
ENGINEERING
MANAGEMENT
1- Time-scaled
2- Simple to prepare
ENGINEERING
MANAGEMENT
Bar Charts Loaded with More Info.
Such as : budget, man hours and resources .
500$
220$
400$
850$
140$
500$
900$
10 12 7 11 10 9 15
31
2. Summary schedules
32
ENGINEERING
Basic Networks
MANAGEMENT
33
ENGINEERING
ENGINEERING
MANAGEMENT
ENGINEERING
ENGINEERING
i j
Activity Name
j>i
Each activity should have a unique i – j value
ENGINEERING
MANAGEMENT
A B
2 4 10 12
A B
3 6 9
ENGINEERING
4
MANAGEMENT
A
C
B 6 8
2
Activity C depends upon the completion of both Activities A & B
(d) A Merge
B 6
A
2 4
C
8
Activities B and C both depend upon the completion of Activity A
(e) A Burst
39
ENGINEERING
MANAGEMENT
12 A C
18
B
16 D
14 20
(f) A Cross
40
Example
ENGINEERING
MANAGEMENT
Activity IPA
A -
B A
C A
D B
E C,D
41
ENGINEERING
Solution : MANAGEMENT
B 30 D
10 A E 50
20 40
C
42
ENGINEERING
MANAGEMENT
A
4 10
Dummy B
11
(b) Correct Representation
44
Example
ENGINEERING
MANAGEMENT
Activity IPA
A -
B A
C A
D B,C
45
Solution : ENGINEERING
MANAGEMENT
A
10 20 30 D 40
C
Improper solution
B 30
Dummy
10 A 20 40 D 50
C
proper solution
46
Example
ENGINEERING
MANAGEMENT
Activity IPA
A -
B A
C A
D B
E B,C
F C
47
ENGINEERING
Solution : MANAGEMENT
B 30 D
Dummy 1
10 A 20 50 E 60
Dummy 2
C 40 F
48
ENGINEERING
(b) A B A B
C C
49
ENGINEERING
MANAGEMENT
B E B E
(d) A C A C
B E B E
50
ENGINEERING
MANAGEMENT
A B C
Redundant
Relationship
51
ENGINEERING
MANAGEMENT
J
25
F
M H
15 40 45
G
B E
5 20 35
D
A C
10 30
K
AOA Representation
54
ENGINEERING
Activity number
Link 10 20
A B
Activity name
a) Independent Activities
10 Link 20
A B B depends on A
b) Dependent Activities
55
ENGINEERING
MANAGEMENT
10
A
30 40 C depends on A & B
C D D depends on C
20
B
c) A Merge Relationship
30
C
10 20 B depends on A
A B C depends on B
40 D depends on B
D
d) A Burst Relationship
56
ENGINEERING
MANAGEMENT
A D
A D
B Start Finish
Dummy B Dummy
C E C E
Example
ENGINEERING MANAGEMENT
Activity IPA
A -
B A
C A
D B
E C,D
58
ENGINEERING MANAGEMENT
Solution :
B D
A E
C
59
Example
ENGINEERING MANAGEMENT
Activity IPA
A -
B A
C A
D B,C
60
ENGINEERING MANAGEMENT
Solution :
A D
C
61
Example
ENGINEERING MANAGEMENT
Activity IPA
A -
B A
C A
D B
E B,C
F C
62
ENGINEERING MANAGEMENT
Solution :
B D
A PF
E
C F
63
Examples
ENGINEERING MANAGEMENT
ENGINEERING MANAGEMENT
ENGINEERING MANAGEMENT
Incorrect Correct
67
ENGINEERING MANAGEMENT
B A B
A
A
B
Improper proper
68
ENGINEERING MANAGEMENT
Improper Proper
69
ENGINEERING MANAGEMENT
Improper Proper
70
ENGINEERING MANAGEMENT
A A
B PS B
C C
Improper Proper
ENGINEERING MANAGEMENT
A A
B B PF
C C
Improper Proper
ENGINEERING MANAGEMENT
Introduction
Suppose you decide with your friend to go in
hunting trip.
ENGINEERING MANAGEMENT
From chart you can see that the 3rd activity (preparing the
jeep) have the longest period of time any delay with this
activity leads to delay in the trip this activity is a “critical
activity”
ENGINEERING MANAGEMENT
ENGINEERING MANAGEMENT
ENGINEERING MANAGEMENT
ENGINEERING MANAGEMENT
ENGINEERING MANAGEMENT
Example
ENGINEERING MANAGEMENT
Draw the logic network and perform the CPM calculations for the
schedule shown next.
ENGINEERING MANAGEMENT
EF j= ESj + Dur j
ENGINEERING MANAGEMENT
Solution :
5,13 13,22
B D
8 9
0,5
13,19 22,23
A G
E
5 1
6
5,11 11,14
C F
6 3
83
ENGINEERING MANAGEMENT
LFj =min(LSk)
where (LSk) represents the late start date for all succeeding
activities.
LS j= LFj - Dur j
ENGINEERING MANAGEMENT
Solution :
5,13 13,22
B D
8 9
0,5 5,13 13,19 13,22 22,23
A G
E
5 1
6
0,5
16,22 22,23
5,11 11,14
C F
6 3
10,16 19,22
CPM ( ES = LS , EF = LF , TF = FF = 0)
85
TF = LS – ES
or
TF = LF - EF
or
TF = LF - Dur - ES
86
ENGINEERING MANAGEMENT
where min (ESi+1) means the least (i.e., earliest) of the early start
dates of succeeding activities
87
ENGINEERING MANAGEMENT
In the previous example we can find the free float and total float for
each activity as the following :
Activity Duration ES EF LS LF TF FF
A 5 0 5 0 5 0 0
B 8 5 13 5 13 0 0
C 6 5 11 10 16 5 0
D 9 13 22 13 22 0 0
E 6 13 19 16 22 3 3
F 3 11 14 19 22 8 8
G 1 22 23 22 23 0 0
Critical activity
Note : We must always realize that FF ≤ TF
88
ENGINEERING MANAGEMENT
Node Format
ENGINEERING MANAGEMENT
ES Activity ID EF
Activity Name
LS Duration LF
TF FF
90
ENGINEERING MANAGEMENT
Examples
Perform the CPM calculations, including the event times, for the arrow
network shown below.
91
ENGINEERING MANAGEMENT
A D
10 20 8 60
d2
d1 G5
B
10 5 30 9E 50 H 8 70
C
7 40 4F
ENGINEERING MANAGEMENT
TEi TEj
Act. Name
i Dur. j
TLi TLj
CPM
93
ENGINEERING MANAGEMENT
10 24
A
20 8D 60
(0,10) (10,18)
10 (0,10) (11,19) (19,24)
d2
0
10
d1 10 19
G (22,27)
27
27
5
B
10 30 9 (10,19) 50 H
E 70
(0,5) (10,19) (19,27)
5 (5,10) 8 (19,27)
0 7 10 19 27
C (0,7)
7 (8,15) 40 4F (7,11)
(15,19)
15
94
ENGINEERING MANAGEMENT
Total Float
ENGINEERING MANAGEMENT
Free Float
Example
FF40-50 = TE50 – TE40 – T40-50
= 19 – 7 – 4 = 8
96
Example
INTF40-50 = TL50 – TE50
= 19 – 19 = 0
Independent Float
Example
INDF40-50 = TE50 – TL40 – T40-50
= 19 – 15 – 4 = 0
97
ENGINEERING MANAGEMENT
Summary
TEi TEj
i T j
TLi TLj
Direction Float
TF
FF
Int. F
Ind. F
98
ENGINEERING MANAGEMENT
Definitions
Activity, or task:
task A basic unit of work as part of the total project
that is easily measured and controlled. It is time- and resource
consuming.
Critical activity:
activity An activity on the critical path. Any delay in the
start or finish of a critical activity will result in a delay in the entire
project.
Critical path:
path The longest path in a network, from start to finish,
including lags and constraints.
.
99
ENGINEERING MANAGEMENT
Early dates:
dates The early start date and early finish date of an activity.
Early start (ES): The earliest date on which an activity can start within project
constraints.
Forward pass:
pass The process of navigating through a network from start to end and
calculating the completion date for the project and the early dates for each activity.
Late dates: The late start date and late finish date of an activity.
Late finish (LF): The latest date on which an activity can finish without extending
the project duration.
Late start (LS): The latest date on which an activity can start without extending the
project duration.
100
Precedence Diagram
101
ENGINEERING MANAGEMENT
1) Finish to Start – FS
2) Start to Finish – SF
3) Finish to Finish – FF
4) Start to Start – SS
102
ENGINEERING MANAGEMENT
Plaster Tile
103
ENGINEERING MANAGEMENT
5 SF
Order
concrete
104
ENGINEERING MANAGEMENT
FF/1
sanding
FF/2
Dismantle
painting inspect scaffolding
105
ENGINEERING MANAGEMENT
SS
ENGINEERING MANAGEMENT
ENGINEERING MANAGEMENT
Calculation
1) forward calculations
EF = ES + D
FF = Min. (LAG)
108
ENGINEERING MANAGEMENT
2) Backward calculations
LS=LF-D
TF = LS – ES OR LF – EF
Example
ENGINEERING MANAGEMENT
A 0
B 0
D 0
F 0
H
1 1 1 2 9 2 11 5 11 16 4 16 20 1 20
2 0 0 2 11 0 0 11 16 0 0 16 20 0 0 20 21 0 0 21
4 5 3
0
C E G
0 0
2 5 5 7 4 10 11 6 14
7 0 3 10 11 0 3 14 17 3 3 20
ENGINEERING MANAGEMENT
A 0
B 0
D 0
F 0
H
1 1 1 2 9 2 11 5 11 16 4 16 20 1 20
2 0 0 2 11 0 0 11 16 0 0 16 20 0 0 20 21 0 0 21
4 5 3
0
C E G
0 0
2 5 5 7 4 10 11 6 14
7 0 3 10 11 0 3 14 17 3 3 20
The critical path passes through the critical activities where TF = 0 ES Dur. LS
EF FF 110
TF LF
111
ENGINEERING MANAGEMENT
CATEGORIES OF RESOURCES
Labor
Materials
Equipment's.
113
ENGINEERING MANAGEMENT
Schedule updating
Schedule updating is just one part of the project
control process.