Time and Work

Time and work apptitude
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views

Time and Work

Time and work apptitude
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

TIME AND WORK

1.A can do a piece of work in 6 days and B can do the same piece of work in 12 days , then A &
B together can do the same piece of work in how many days ?

a)18 days b) 8 days c)14 days d)4 days

2. P can do a piece of work in 10 days and Q can do the same piece of work in 15 days , then P
& Q together can finish the same piece of work in how many days ?

a) 4 days b)6 days c) 8 days d) 12 days

3. A and B together can dig a trench in 12 days , which A alone can dig in 30 days. In how many
days B alone can dig it ?

a)10 days b) 20 days c)25 days d)30 days

4. Ram and Shyam together can finish job in 8 days . Ram can do the same job on his own in
12 days. How long will Shyam take to do the job by himself ?

a)16 days b)20 days c)24 days d) 30 days

5. A can do a piece of work in 12 days , B in 15 days and C in 30 days . In how many days will
they finish the work all together ?

a) 6 5/11 days b) 5 5/11 days c)7 5/11 days d) 5 11/5 days

6. A can do a work in 4 days , B can do it in 5 days and C can do it in 10 days . A, B and C


together can do the work in ?

a)1 3/5 days b) 1 9/11 days c) 2 5/6 days d) 3 days

7. A can do a piece of work in 15 days and B in 20 days with the help of C they work in 5 days .
How many days will C take to finish the work ?

a) 35 days b)24 days c)12 days d) 6 days

8. A and B together can complete a piece of work in 12 days , B and C can do it in 20 days and C
and A can do it in 15 days . A , B and C together can complete it in ?

a) 6 days b) 9 days c)10 days d)11 days

9. A and B can do a piece of work in 12 days . B and C can do it in 15 days and C and A can do it
in 20 days. A alone can do the work in ?
a)13 days b)24 days c)30 days d)40 days

10. A and B together can complete a piece of work in 8 days while B and C together can do it in
12 days . All the three together can complete the work in 6 days . In how much time will A and C
together complete the work ?

a) 8 days b)10 days c)12 days d)20 days

11. A man, a woman and a boy together complete a piece of work in 3 days. If a man alone can
do it in 6 days and a boy alone in 18 days, how long will a woman take to complete the work ?

a) 9 days b)21 days c)24 days d)27 days

12. A and B together can complete a work in 3 days . They start together, But , after 2 days , B
left the work. If the work is completed after 2 more days , B alone could do the work in ?

a) 5 days b) 6 days c)9 days d)10 days

13. A can do a piece of work in 20 days which B can do in 12 days . B worked at it for 9 days . A
can finish the remaining work in ?

a)3 days b)5 days c)7 days d)11 days

14. A can do a certain job in 25 days which B alone can do in 20 days. A started the work and
was joined by B after 10 days . The work lasted for ?

a) 12 ½ days b)14 2/9 days c)15 days d)16 2/3 days

15. A can do a piece of work in 10 days and B can do it in 20 days . They start the work together.
But , after 5 days , A leaves off. B will do the remaining work in ?

a)5 days b) 6 days c)8 days d) 10 days

16. A and B can finish a piece of work in 30 days . They worked at it for 20 days and then B left.
The remaining work was done by A alone in 20 more days . A alone can finish the work in ?

a)48 days b) 50 days c)54 days d)60 days

17. A can do a piece of work in 14 days which B alone can do in 21 days. They begin together
but 3 days before the completion of the work, A leaves off. The total number of days for the
work to be completed is ?

a)6 3/5 days b)8 ½ days c)10 1/5 days d) 13 ½ days


18. A and B can do a piece of work in 45 days and 40 days respectively. They began the work
together but A leaves after some days and B finished the remaining work in 23 days. After how
many days did A leave ?

a)6 days b)8 days c)9 days d)12 days

19. A and B can complete a piece of work in 12 days and 18 days respectively. A begins to do
the work and they work alternatively one at a time for one day each. The whole work will be
completed in ?

a)14 1/3 days b)15 2/3 days c)16 1/3 days d)18 2/3 days

20. A and B can complete a piece of work in 8 days and 10 days respectively. B begins the work
and they work alternatively one at a time for one day each. The whole work will be completed
In how many days ?

a) 8 1/3 days b) 9 ½ days c) 8 days d) 9 days

21. A is twice as good work man as B and is therefore able to finish work in 12 days less than
B. How many days will they finish the work together?

a) 6 days b)7 days c)8 days d) 9 days

22. A work twice as much as B. If both of them finish the work in 12 days. In how many days A
alone can do it ?

a)14 days b) 15 days c)17 days d)18 days

23. A can do a piece of work in 12 days . B is 60% more efficient than A. In how many days B do
the same piece of work ?

a)6 ½ days b)7 ½ days c ) 6 days d) 7 days

24. Ram can do a work in 50 days . Shyam is 20 % more efficient than Ram. How long would
shyam take to do the same work ?

a) 41 1/3 days b) 42 1/3 days c) 41 2/3 days d) 42 2/3 days

25. 12 men can do a piece of work in 8 days . 6 men can do the same piece of work in how
many days ?

a) 4 days b) 24 days c) 10 days d) 16 days

26. 16 men can do a piece of work in 10 days. How many men are needed to complete the work
in 40 days ?
a) 64 b) 32 c) 16 d)4

27.5 men can prepare 10 toys in 6 days working 6 hrs a day. In how many days can 12 men
prepare 16 toys working 8 hrs a day ?

a) 8 days b) 3 days c) 9 days d) 4days

28. 6 men can prepare 6 toys in 5 days working 4 hrs a day. In how many days can 10 men can
prepare 15 toys working 5 hours a day ?

a)4 b)5 c)6 d)7

29. If 5 men or 9 women can finish a piece of work in 19 days, 3 men and 6 women will do the
same work in how many days ?

a) 10 days b) 12 days c)13 days d)15 days

30. If 3 men or 4 women can reap a field in 43 days . How long will 7 men and 5 women take to
reap it ?

a) 10 days b) 11 days c)12 days d)13 days

31) If 1 man or 2 women or 3 boys can do a piece of work in 44 days, then the same piece of
work will be done by 1 man, 1 woman and 1 boy in ?

a) 21 days b) 24 days c) 26 days d)33 days

32) 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys finish it in 2
days. 15 men and 20 boys will finish it in ?

a)4 days b) 5 days c)6 days d)7 days

33) 4 men and 6 women finish a job in 8 days while 3 men and 7 women finish it in 10 days. 10
women working together will finish it in ?

a)24 days b)32 days c)36 days d)40 days

34) If 12 men and 16 boys can do a piece of work in 5 days and 13 men and 24 boys can do it in
4 days. How many days will 7 men and 10 boys take to do it ?

a)6 ½ days b) 8 1/3 days c) 9 ¼ days d) 7 1/3 days