GM 1927 31 B PDCA Job Aid Reference Guide
GM 1927 31 B PDCA Job Aid Reference Guide
Suppliers
Log In / Federate
within
SupplyPower
Select
Collaborate Tab
Select
Document Library
Select
Supplier Quality
Type
GM Document
Name
General Motors
Model Year
Program Name
PDCA REVIEW
Name of Commodity
Supplier Name
Supplier Program Mgr. Name
Date
Assistant
Quality Maintenance Press Shop & Tool Assembly Manager Materials Manager
Engineering Engineering
Manager Manager Room Manager
Manager Manager
Quality Lead Manufacturing HR/ Payroll/ Safety Materials/ IT Production Production Quality Lab
Production
Engineer Engineer Production Supervisor Supervisor Supervisor Technician
Planner
Current Staff
Receptionist/Office Robotic Technician 2nd Robotic Weld Robotic Weld Robotic Technician Maintenance
1st Shift – 6 Operators Clerk Shift Technician 2nd Shift Technician
Show names of all personnel assigned to the GM program along with job responsibility.
Show Hire date(s)
Include absenteeism and attrition rates per quarter
Image result for table
of contents icon
Show names of all personnel assigned to the GM program along with job responsibility.
Show Hire date(s)
Include absenteeism and attrition rates per quarter
Image result for table
of contents icon
Workforce
Include names of personnel, job description and classification.
Include core training and job specific training for respective job classification.
Supplier shall have trained operator back up in the event of absenteeism, and or daily operational shortfalls. Trained back
up operators must be identified in the overall Training Plan.
Image result for table
of contents icon
Power on date
Power on date
NOTE: Always reference the latest GM 1927 29 Gauge Concept Design and Build review
Image result for table
of contents icon
-ADVP&R Format including start and completion dates approved by GM validation Engineer
ADVP&R Planning
-5 phases for testing that is late or in risk of being late
New p/n
12345678 Ref. New p/n 84222565
EWO 12345
Actual
Actual 65.7% Actual 86.0 % Actual 87.7%
70.58%
EWO 2526578
Actual
Actual 75.8 %
62.72%
Actual 73.46% N/A Actual 88 % Actual 88.5 % Actual 89.4% Actual 94.0%
Actual 81.6% N/A Actual 99% Actual 99% Actual 99% Actual 100%
Actual
Actual 86.44% N/A Actual 91.5% Actual 92.8% Actual 93.7%
91.51%
Actual 100%
N/A Actual 100% Actual 100% Actual 100% Actual 100%
@ 5 May 2016
• Layout shall provide adequate floor space for WIP and finished goods, and
presence on manf. floor
• Need evidence that floor space assigned, meets overall plant capacity
requirements and operator instructions at workstations
Image result for table
of contents icon
This schedule will satisfy the rack needs for upcoming EDI releases and Run at Rate Build Event.
List of Open Issues, Owner and expected closure date.
Supplier to complete GM 1738 Container Form and submit to GM for approval .
1. Commercial issue
2. Commercial Issue
3. Commercial Issue
NOTE: Always reference the latest GM 1927 16 Process Control Plan Audit
Image result for table
of contents icon
= Check
GM PDCA WALL PLAN
Product Design & Development Verification
AIAG APQP Latest Edition to be Process Design & Development Verification
followed Product & Process Validation
18Aug17 Production
29Jul16 18Nov16 15Feb17 Feedback Assessment & Corrective Action 12Mar18 03Jul18 03Sep18
CSO PQRR IVR PQRR IVS PQRR IVE PQRR PPV PQRR M VBns M VBs
-123 -107 -95 -68 -39 PQRR -23 PQRR -14
15Jul16 07Oct16 06Jan17 06Feb17 22Jan18 25May18 24Ago18
CVER / SVER LL IVER / IVER 02Oct17 / BiW CVER / SVER / IVER PPV BiW M VBns BiW M VBs BiW
P Re le as e -125/-113 P Re le as e -100/-96 M atcing MRD -62/-56/-47 M RD -46 M RD -28 M RD -15
19Feb16 01Feb17 / 22Feb17 2Mar17 29Jun18 31Ago18
4Dec17
M ULE BiW / GA IV BiW / GA M 1 GA M 2 & PPV GA M 3 & M VBns GA M 4 & M VBs GA
M RD -146 M RD -97/-94 M RD -53 M RD -40 M RD -23 M RD -14
Laun 04Dec17 15Dec17 25Jun18
26Jan18 20Ago18
PPAP PPAP ns PPAP ns VTC PPAP
GM GLOBAL GVDP follow specific M atching -53 BiW -51 GA 100% -45 -24 Gate -16
program timing SRV 2 SRV 3 20Ago18
APQP Kick Off SRV 1 (deadline -36) (deadline -25) PPAP
Within 30 days of nomination (deadline -76) -1 w k PPV -1 w k MVBns Approved
PQRR PQRR -16
-165 -104 -100 -96 -92 -88 -84 -80 -76 -72 -68 -64 -60 -56 -52 -48 -44 -40 -36 -32 -28 -24 -20 -16 -12
* PDCA wall review should start no later 30 days after APQP or Contract/Project KO Frecuency should be from 4-6 weeks
GM SQ to help supplier prep for Wall Review
Supplier is responsible to continously update wall content.
Onsite reviews preferred;display information contingent on regional prefernce.
Supplier to submit electronic copy to SQ upon completion of days review event
* Supplier is responsible to provide solution for Issues discovered Supplier Participants required
PRR – Problem Reporting and Resolution / PAL – Preventive Action Letter / SWA – Supplier Warranty Analysis
Image result for table
of contents icon
GM Plant
Volume
SORP Key Issues under review:
( LCR/Hrs.)
1)
2)
Lead Program Timing: Identify issues “GM HELP NEEDED”
PROGRAM
R@R date
MILESTONES
Identify all
equipment related
to manufacturing
process
Image result for table
of contents icon
Supplier to identify RED elements in CRV with action plan and recovery date
Scorecard Ratings RED if CRV rating elements are RED; and Green if all elements are Green
Image result for table
of contents icon
GM 1927 09
List matrix status summary and show eye chart from collected data