GRADE OF CONCRETE M30

GRADE OF TMT BAR 550 D

DEV. LENGTH TABLE OF BARS


DIA OF DEV. DIA OF DEV.
BAR LENGTH BAR LENGTH
6 MM 300 MM 12 MM 600 MM

8 MM 400 MM 16 MM 800 MM
10 MM 500 MM 20 MM 1000 MM

AMF AMF
25 MM 1250 MM 32 MM WELD
NOTE:- FOR 32 MM DIA BAR IT'S MANDATORY TO WELD LAP
5000C/C 5000C/C

O/T
WELDED LAP

4450

1
1000MM
4050C/C

32 MM DIA BAR
300 WIDE OIL DRAIN TRENCH
LAPS OF 32 MM DIA BAR SHALL BE WELDED
1200 ROLLER CENTER C7
NOTE :
Y Y
RCC LIFT WALL THROUGHOUT

1500KVA DG SET-1 SILENCER

300 WIDE OIL DRAIN TRENCH


300 WIDE OIL DRAIN TRENCH

1200 ROLLER CENTER


Y Y

C/L OF TRANSFORMER

HV SIDE
LV SIDE

FOR DIMENSIONS, LEVELS, CENTERLINE AND GENERAL

3950
ARRANGEMENT REFER ARCHITECTURAL DRAWING.

1. CONSULTANT COPY 2. CLIENT'S COPY 3. SITE COPY 4. OFFICE COPY


NOTE:-
Y Y
1] ALL DIMENSIONS ARE IN mm.

P 2] S.B.C. OF THE SOIL IS ASSUMED AS 900kN/SQ.M. AND


SHALL BE VERIFIED AT SITE BY SITE ENGINEER.
3650C/C

3] MIN. DEPTH OF FOUNDATION SHOULD BE 4.000M BELOW BELOW NATURAL G. L.


Y Y
4] USE M30 GRADE OF CONCRETE
5] DENSITY OF BRICK ASSUME TO BE 1900 KG/M³.
6] ALL STRUCTURAL STEEL REINFORCEMENT SHALL BE HIGH STRENGTH
300 WIDE OIL DRAIN TRENCH DEFORM BARS OF GRADE FE.550 CONFORMING TO IS 1786-1985
& MILD STEEL GRADE I CONFORMING TO IS:432-1982( PART 1 )
7] PROVIDE CLEAR COVER OF 50 mm FOR FOOTING R/F.
6 MVA TRANSFORMER FOUND. 700
OIL PIT
700 8] PROVIDE CLEAR COVER OF 40 mm FOR COLUMN R/F.
9] PROVIDE CLEAR COVER OF 25 mm FOR BEAM R/F AND 15 MM FOR SLAB R/F
10] NOT MORE THAN 50 % BARS SHOULD BE LAPPED AT ONE SECTION.
SILENCER 11] EXECUTION SHALL BE AS PER IS 456-2000.

1500KVA DG SET-2 12] FOR DIMENSIONS, LEVELS, CENTERLINE AND GENERAL ARRANGMENT REFER
ARCHITECTURAL DRAWING.
13] ALL BARS SHOULD BE EXTENDED UPTO DEVELOPMENT LENGTH + 10 DIA
OF BAR
14] LAP SHOULD BE EQUAL TO DEVELOPEMENT LENGTH + 10 DIA OF BAR
15] USE OPC/PPC WITH MINIMUM GRADE 43/53 AND USE MAXIMUM

O/T
700

OIL PIT WATER CEMENT RATIO 0.5


700 16] NO OVERLAPS ARE ALLOWED IN FOOTING
17] ALL AGGREGATE FOR FOOTING 30mm DOWN AND FOR COLUMN 20mm DOWN
18] USE CURED MORTOR COVER BLOCKS OF SAME STRENGTH OF CONCRETE
4050 19] STRIPPING OF TIME FOR SHUTTERING AS PER IS 456-2000
3650C/C

20] TOLERANCES FOR FORMWORK, REINFORCEMENT, COVER AS PER IS 456-2000


300 WIDE OIL DRAIN TRENCH 21] BACKFILLING IN COLUMN PITS SHALL BE WITH APPROVED SOIL
AND COMPACTED PROPERLY TO AVOID SETTLEMENT
22] USE DENSIFIED COATED PLYWOOD FOR SHUTTERING & FORMWORK
1200 ROLLER CENTER 23] USE STEEL PROPS & STEEL SUPPORT FOR FORMWORK
24] BURNT OIL NOT PERMITTED FOR SHUTTERING, USE MOULD OIL.
M M 25] USE SUPER-PLASTICISER TO MAINTAIN WATER/CEMENT RATIO
26] CURING-EXPOSED SURFACE OF CONCRETE SHALL BE KEPT
300 WIDE OIL DRAIN TRENCH
300 WIDE OIL DRAIN TRENCH

CONTINUOUSLY IN WET CONDITION MINIMUM FOR 14 DAYS.


1200 ROLLER CENTER

27] GHODI OR CHAIR SPACING @ 600 C/C


CHAIR ht.
C/L OF TRANSFORMER

28] GHODI OR CHAIR HEIGHT = {SLAB THICKNESS - [30MM + (2XDIA BAR)]}


HV SIDE
LV SIDE

29] ALL OUTER PLINTH BEAMS BOTTOMS SHALL BE 100 MM BELOW G.L.
ROLLING SHUTTER. ROLLING SHUTTER. 30] ALL INNER BEAMS SHALL BE AT PLINTH LEVEL
3300

31] STUB COLUMN SC ARE ONLY UPTO PLINTH LEVEL


32] BUILDING IS DESIGN FOR G+8ONLY
33] IN BOX FOOTING "L" SHALL BE (D-150)
34] IN RAFT, BOX AND ECCENTRIC FOOTING DO NOT PROVIDE PEDESTAL
UNTILL & UNLESS SPECIFIED
35] HIGHER DIAMETER OF BAR SHALL BE PLACED
AT SHORTER FACE OF COLUMN.
36] SUPERVISION AT OWNER'S RISK.
P 37] FOR ISOLATED FOOTING LONG BARS SHALL BE KEPT BELOW SHORT BARS.
3450C/C

M M
38] FOR COMBINED & RAFT FOOTING SHORT BARS
SHALL BE KEPT BELOW LONG BARS.
39] TYPICAL DETAILS OF SWEAR BARS AT EVERY JUNCTION
300 WIDE OIL DRAIN TRENCH OF MAIN BEAM AND SECONDARY BEAM SECONDARY BEAM

300
4.5 MVA TRANSFORMER FOUND.

60°
MAIN BEAM SWEAR BARS 2-12
>=75MM
40] GRADE OF CONCRETE FOR P.C.C. -1:4:8.
20

41] CONCRETE AND STEEL MATERIAL TESTING AT OWNER'S RISK.


42] POSITION OF DRAIN PIPES IN TOILETS MAY VARY AS PER ARCHITECTURAL
REQUIREMENT & SHALL BE 250MM AWAY FROM SUPPORT

STUDY PURPOSE

ROLLING SHUTTER.
180

R.NO. REVISON DATE DEALT


1. DESIGN:-
2. DEALT :-
2000C/C 6000C/C 2000C/C 6250C/C 6250C/C 3. DATE:- 11/05/24
4. SCALE:- VARIABLE

PROJECT:- CONSTRUCTION OF TRANSFORMER FOUNDATION

OWNER:- M/s

TITLE:-
LAYOUT PLAN OF FOUNDATION FOR
TRANSFORMER AT MCC BUILDING

DRG. NO.
STRUCTURAL DESIGNER:-
KCD/TRANS
/01

NOTE :- THIS DRWG. SHOULD NOT CONSIDER AS A LEGAL DOCUMENT


1A