EDISON REAL ESTATE LIMITED
246, Rangs Babylonia, Tejgaon Link Road, Dhaka- 1208
Department of QA & QC- PMO
Checked Area: Basement-2 Roof Slab and basement-1 mat foundation Rebar
Project Name: Edison Orlando
Fabrication
Project & QC Inspection
Project In Charge:
Inspection
Shaleh Mahmud Shakkwar & Swapnil Das
Summary Attendee(s):
Contractor: ECL
Inspection Date: 19.11.2024 Casting Date: 19.11.2024 Variance From Master Schedule: -
Checklist -
Rebar Fabrication, Rebar Nos, Rebar Diameter, Rebar Spacing,
Project Safety ✔ Inspection Item(s):
Clear Cover, Slab Level, Casting Level, Cleanliness & Safety.
Rectification ✔
Findings Overview
Responsib
Severity le
S/N Description of Findings Root Cause Action Item(s) Remarks
Score Departme
nt
Beam & slab rebar Nos, spacing,
1 diameter & lapping were checked N/A x N/A x
& found okay.
Clear cover was not maintained in
2 N/A x N/A
several places.
Randomly slab level was checked
3 N/A x N/A
& found okay.
Ramp rebar fabrication and Slope
4 N/A x N/A
is ok.
Rebar Alignment is slightly twisted Supervision
5 4 Construction Rectified
at sw-8 Workmanship
Electrical conduit pipes were go
Supervision
6 through Column. Which Must be re- 5 Construction Rectified
position
Some Holes Observed in Ramp
7 4 Supervision Construction Rectified
slope shutter.
Rebar is placed in Column by
Supervision
8 drilled hole without apply Exopy for 6 Construction Rectified
Workmanship
proper bonding
Some Rubish Found in C-2 Column. Cleaned in precense of QC
9 5 Supervision Construction
Proper Cleaning Required. Engineer
Recommendation(s)
1 It is recommended to go forward for casting after rectification & send feedback to QC.
2 Ensure proper curing after casting.
Pictorial Description(s)
Drilled hole without apply Exopy Electrical conduit pipes were go through Column.
Rebar Alignment is slightly twisted at sw-8
Some Rubish Found in C-2 Column.
QC Notes