Edison Orlando-Basement-2 Roof Slab and Basement-1 Mat Foundation 2024.11.19

Uploaded by

turhan.masabih
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

EDISON REAL ESTATE LIMITED

246, Rangs Babylonia, Tejgaon Link Road, Dhaka- 1208

Department of QA & QC- PMO

Checked Area: Basement-2 Roof Slab and basement-1 mat foundation Rebar
Project Name: Edison Orlando
Fabrication

Project & QC Inspection


Project In Charge:
Inspection
Shaleh Mahmud Shakkwar & Swapnil Das
Summary Attendee(s):
Contractor: ECL

Inspection Date: 19.11.2024 Casting Date: 19.11.2024 Variance From Master Schedule: -

Checklist -
Rebar Fabrication, Rebar Nos, Rebar Diameter, Rebar Spacing,
Project Safety ✔ Inspection Item(s):
Clear Cover, Slab Level, Casting Level, Cleanliness & Safety.
Rectification ✔

Findings Overview
Responsib
Severity le
S/N Description of Findings Root Cause Action Item(s) Remarks
Score Departme
nt
Beam & slab rebar Nos, spacing,
1 diameter & lapping were checked N/A x N/A x
& found okay.

Clear cover was not maintained in


2 N/A x N/A
several places.

Randomly slab level was checked


3 N/A x N/A
& found okay.

Ramp rebar fabrication and Slope


4 N/A x N/A
is ok.

Rebar Alignment is slightly twisted Supervision


5 4 Construction Rectified
at sw-8 Workmanship

Electrical conduit pipes were go


Supervision
6 through Column. Which Must be re- 5 Construction Rectified
position

Some Holes Observed in Ramp


7 4 Supervision Construction Rectified
slope shutter.

Rebar is placed in Column by


Supervision
8 drilled hole without apply Exopy for 6 Construction Rectified
Workmanship
proper bonding

Some Rubish Found in C-2 Column. Cleaned in precense of QC


9 5 Supervision Construction
Proper Cleaning Required. Engineer

Recommendation(s)
1 It is recommended to go forward for casting after rectification & send feedback to QC.

2 Ensure proper curing after casting.

Pictorial Description(s)

Drilled hole without apply Exopy Electrical conduit pipes were go through Column.

Rebar Alignment is slightly twisted at sw-8


Some Rubish Found in C-2 Column.

QC Notes