0% found this document useful (0 votes)
9 views

FSR Report Invalid Date1726754484502 PDF

Uploaded by

Shymayam ,Tariq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

FSR Report Invalid Date1726754484502 PDF

Uploaded by

Shymayam ,Tariq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Allied Engineering & Services (Pvt.) Ltd.

21/2, Sector No. 22, korangi Industrial Area, Karachi-74900, G.P.O. Box 940, Karachi-74200

UAN: 111 250 250 Tel: 35066901-13 Fax: 35066915, 35066916

Email: [email protected] Website:www.aesl.com.pk

FIELD SERVICE REPORT


CUSTOMER RELIANCE WEAVING MILLS LTD. SITE ADDRESS C-1 FIRST FLOOR HASSAN ARCADE MULTAN

2024-09-19 FIELD REPAIR SHOP REPAIR

Hour Millage Time Travel


Time Time on Time off Hour
Service Men Worked Time On Time Off
Depart Site Site Out Return Worked
HH:MM Out Return
HH:MM HH:MM
MUHAMMAD
09:37 AM 10:20 AM 05:25 PM 07:01 36 KM 36 KM 00:33
ANSAR ALI
Shymayam
09:37 AM 10:20 AM 05:25 PM 07:01 36 KM 36 KM 00:33
Tariq

THE FOLLOWING SMS DETAILS ARE REQUIRED FOR EACH SEPARATE INCIDENT

WORK ORDER No. REPORT DATE MODEL SERIAL NO. HOURS

FO5844 2024-09-19 G3520H GFP00180 23727

PART CAUSING FAILURE QTY DC GROUP NO. OPERATIONAL COMMENTS

1- CUSTOMER COMPLAINT

Maintenance and service (2000 Hrs)

2- DETAILS OF FAILURE INCLUDING CONSEQUENTLY DAMAGE

Genset is overdue for Topend Overhauling.


Advised customer to please follow CAT recommended preventive maintenance schedule for safe operation.

3- BRIEF DETAILS OF REPAIR METHOD

1- Visited site genset found stopped as standby.


2- Carried out walk around inspection, started for warmup & saved ET parameters.
3- Stopped genset & performed 2000 hrs PMS as per CAT specs.
4- Removed tappet covers & ignition Transformers.
5- Checked/adjusted valve Bridges,valve lash & HLA settings of all intake and exhaust valves as per CAT specs.
6- Recorded valve recession of all intake and exhaust valves.
7- Inpected engine air intake & exhaust system found satisfactory.
08- Cleaned main alternator, breathers & inspected couplings (generator + PMG) found normal.
09- Greased ( CAT Grease) main alternator both end bearings.
*Electrical Activity*
10- Checked Exciter stator- rotor Gap up. 0.036", Dn. 0.029", L. 0.035", R. 0.037".
11-Perform Insulation Resistance test of main stator(250V): 740 M ohm (30 sec) and 1724M ohm (60sec).
12-Checked ignition transformers resistance found 35K ohm. Cleaned with contact cleaner.
13- Checked/cleaned all harnesses and connectors found ok.
14- Checked/cleaned bus bar, CT condition, and connection wire.
15- Checked rectifier assembly found ok.
16- Checked control breakers and wire condition found ok.
17- Checked starting motor connection, SMR, and SMR fuses found ok.
18- After completed all jobs, the genset tested only offload due to load unavailability found normal parameters.
19- Nox sensor couldn't be calibrated due to load unavailability.

4- CAUSE OF FAILURE

5- CUSTOMER COMMENTS

Please rectify the parameters issue on Enercon HMI after last flasfile activity by AESL.
We will share load data as load available in couple of days.

JOB COMPLETED: Yes

CUSTOMER SIGNATURE SIGNATURE (FIELD. SERVICEMAN)


Distribution: 1. Original (White) Region

Blue- Customer
NAME: Hammad Mustafa
Pink- G.O. Service
DESIGNATION: Plant Manager