Proposed Unit Rate
Proposed Unit Rate
Total
Daily No. of
Requir Required
No Manpower Description Wadge Hr.cost U.F Workin
ed No Amount
(Birr) g days
(Birr)
Permanent Members
Wage
1 Project Manager 1.00 900.00 112.50 1.00 365.00 328,500.00
2 Construction Engineer 1.00 800.00 100.00 1.00 365.00 292,000.00
3 Construction Forman 1.00 296.00 37.00 1.00 365.00 108,040.00
4 Surveyor 1.00 296.00 37.00 1.00 365.00 108,040.00
Temporary Manpower
Cost
1 Mason 1.00 296.00 37.00 1.00 30.00 8,880.00
2 Assistant mason 1.00 200.00 25.00 1.00 30.00 6,000.00
3 Bar-bender 1.00 72.00 9.00 1.00 20.00 1,440.00
4 Assistant bar-bender 1.00 72.00 9.00 1.00 20.00 1,440.00
5 Carpenter 1.00 72.00 9.00 1.00 20.00 1,440.00
6 Assistant carpenter 1.00 72.00 9.00 1.00 20.00 1,440.00
7 Gang leader 1.00 72.00 9.00 1.00 20.00 1,440.00
8 Metal Welder 2.00 72.00 9.00 1.00 20.00 2,880.00
9 Ass. metal welder 1.00 72.00 9.00 1.00 20.00 1,440.00
10 Oprator 1.00 296.00 37.00 1.00 5.00 1,480.00
11 Ass. Oprator 1.00 200.00 25.00 1.00 5.00 1,000.00
12 Vibrator Operator 1.00 296.00 37.00 1.00 10.00 2,960.00
13 Greador Operator 1.00 200.00 25.00 1.00 2.00 400.00
14 Water Truck driver 1.00 296.00 37.00 1.00 2.00 592.00
15 Metal Welder 1.00 72.00 9.00 1.00 20.00 1,440.00
16 Assistance Metal Welder 1.00 70.00 8.75 1.00 20.00 1,400.00
17 Store Keeper 1.00 20.00 2.50 1.00 365.00 7,300.00
Total Manpower Cost (Birr) 879,552.00
Project: Melka Leme Small Scale Irrigation Project
Contract Title: Procurement of construction works for Melka Leme Small Scale Irrigation
Project
Procurement Reference Number: Bore/KfW-SLM-IV/NCB/WMAB/12/2024
CONTARCTOR- : G-KUBE GENERAL CONTRACTOR GC-5
DIERECT COST COMPUTATION BASE DATA FOR EQUIPMENT
Dates Hrs
Adjuste Expect Rental Rate
Annual Mths/ Per Per
It d ed Depreci Adding
Equipment Depre Yr for Month Day Depreci
e Purcha Depre ation 20% for
m Type sing ciation
ciation Depre for for
Hr
ation/Hr
Maintenanc
Cost ciation Depre Depre
Cost Year e & Repair
ciation ciation
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
0.03
0 foreman 1 3 35 1.16 tool 4 0.16 0.64
0 DL 1 1 27 27 0
0 helper 1 1 9 9 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
0.03
0 foreman 1 3 35 1.16 tool 1 0.16 0.16
0 DL 1 1 27 27 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
1.0 22
selected material m3 5 0 231 foreman 1 0.1 35 3.50 tool 1 0.16 0.16
0 DL 1 1 27 27 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
180.0 180.0
0 operator 1 1 37.00 37.00 loader 1 0 0
dump 650.0 2600.
0 driver 4 4 25.00 400.00 truck 4 0 00
0 0 0.00
0 0 0.00
0 0 0.00
0 0 0.00
0 0 0.00
0 0 0.00
0 0 0.00
2780.
Total (1:-01) 0 Total (1:02) 437.00 Total (1:03) 00
Birr/m
3
Total Unit Cost : 167.55
Remark
________________________________________________________________________
_____
UF: UTILIZATION
FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING,
HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO
TARGETED OUTPUT.
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
LABOUR HOURLY m3/hr
PROJECT: EXCAVATION AND EARTH WORK. OUTPUT: 0.8 .
WORK ITEM: ( 25cm. thick basaltic hard EQUIPEMENT:
1.16) core. Tool
TOTAL QANTITY OF
WORK ITEM: 1 m3 RESULT: 619.79 Birr/m2
**
Inde
xed Hour
Cost Hour Type of ly Hour
Qty Rat per Labour by N ly Hourly Equipm Rent ly
Type of Material Unit * e Unit Grade o. UF Cost Cost ent No. al Cost
0.0 14 101.
basaltic stone m3 7 50 5 foreman 1 0.25 37.00 9.25 tools 6 0.16 0.96
0 mason 2 1 37 74.00
0 DL 8 1 27 216 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
101.
Total (1:-01) 5 Total (1:02) 299.25 Total (1:03) 0.96
Bir
A= Materials 727 r/m B=Manpower Unit 161. Br./ C= Equipment 204 Br.
3
Unit Cost 0.17 Cost 60 m3 Unit Cost .8 /m3
Total of 12.0
(1:02) 8 Total of (1:03)
Hourly 0.62 Hourly output:
Output 5 ________________
Direct Cost of work item
= A+B+C = 7636.57 Birr/m3
Overhead
Cost: 10% 763.66 "
Profit
Cost: 15% 1145.49 "
Total
Unit Cost
: 9545.72 Birr/m3
Remark
______________________________________________
__________
UF: UTILIZATION
FACTOR
*: INCLUSIVE OF WASTAGE,
TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF
OVERTIME RELATED TO TARGETED OUTPUT.