Both the primary line (Node1-Node 2) and the secondary line (Node 3-node4) will be
constructed using the pole configuration shown in Figure 2.
Balanced Unbalanced
Phase-a
kW 1800 1275
Power Factor 0.9 lag 0.85 lag
Phase-b
kW 1800 1800
Power Factor 0.9 lag 0.9 lag
Phase-c
kW 1800 2375
Power Factor 0.9 lag 0.95 lag
Balanced Unbalanced
Phase-a
kW 1200 850
Power Factor 0.9 lag 0.85 lag
Phase-b
kW 1200 1200
Power Factor 0.9 lag 0.9 lag
Phase-c
kW 1200 1583.33
Power Factor 0.9 lag 0.95 lag
Line Impedances
4-wire configuration:
Sequence impedances:
zypos 0.3061 0.627j /mile
Sequence impedances:
Standard 30 degree connections are assumed for wye-delta and delta-wye banks
Only the ungrounded wye-delta bank will have a difference between LG and LN voltages
Node-2 Y-D
VAN 7115.2/-0.3
VBN 7130.9/-12.3
VCN 7120.9/119.6
VNG 3.6/169.8
Step-Down with Unbalanced Loading
Standard 30 degree connections are assumed for wye-delta and delta-wye banks
Only the ungrounded wye-delta bank will have a difference between LG and LN voltages
Node-2
VAG 7115.4/-0.3
VBG 7142.0/-120.4
VCG 7108.5/119.5
VNG 7.3/171.8
Step-Up with Balanced Loading
Standard 30 degree connections are assumed for wye-delta and delta-wye banks
Only the ungrounded wye-delta bank will have a difference between LG and LN voltages
Node-2
VAN 7129.4/-0.3
VBN 7143.3/-120.3
VCN 7135.6/119.6
VNG 3.1/174.9
Step-Up with Unbalanced Loading
Standard 30 degree connections are assumed for wye-delta and delta-wye banks
Only the ungrounded wye-delta bank will have a difference between LG and LN voltages
Node-2
VAN 7129.3/-0.2
VBN 7156.8/-120.4
VCN 7126.9/119.5
VNG 3.7/177.3