Work Completion Report

(To be submitted by the Applicant)

To
The Manager (CO-ORDINATION),
CESC Limited

Sub: Submission of work completion report

Ref: Application No.: .............................................. dated .................................

Dear Sir / Madam,

This is in reference to my above application for installation of SPGS system I / We hereby confirm you that
I / we have completed the work of installation of the SPGS system of capacity ...................... and submit
the following basic information for your perusal and request you to inspect and commission the system.

S. No. Particulars Information


A. Details of the Solar module
1. Model No. TP 450HGZ
TATA POWER SOLAR,
2. Name and Address of manufacturer BANGALORE
3. Capacity of each Module (Wp) 435WP

4. No. of Modules 46
5. Total Capacity (kWp) 20KWP
6. Date of Installation 4th SEP 2023
7. Applicable Standard (BIS/IEC) IEC 61215/IEC61730
(PART I &II) IEC 62804
B. Details of the Inverter
GOODWE TECHNOLOGIES co.
8. Name and address of the inverter manufacturer ltd. SUZHU,215011.CHAINA)

9. Brand Name of the inverter GOODWE TECHNOLOGIES

10. Model No. GW20KT DT


11. AC Capacity of individual inverter (kW) 20kw
12. No. of inverters installed 1
13. Total AC capacity of inverter (kW) 20
14. Serial Nos.
15. Date of Installation 4th SEP 24
16. Applicable Standard (BIS/IEC) IEC 61215/IS 14286/IEC61730
(PART I &II) IEC 62804
C. Details of the Cables: DC
17. Make / Name of manufacturer BIRLA UNISTAR

18. Size & Type IC X 4SQMM


19. Applicable Standard (IEC) TUV 2 Pfg 1169/08.2007

D. Details of the AC wiring


20. Make / Name of manufacturer POLYCAB
21. Size & Type 16SQMM X 3.5 C CU
22. Applicable Standard (IEC) IEC 62275
E. Details of the DC distribution box
23. Make / Name of manufacturer N/A
24. Serial No. N/A
25. DC Surge Protection Device N/A
26. MCB / Isolator quantity & capacity N/A
27. Size & Type N/A
28. Applicable Standard (IEC) N/A
F. Details of the AC distribution Box
29. Make / Name of manufacturer TPS APPROVED
30. Serial No. E*C**ACDB1366
31. AC Surge Protection Device YES
32. MCB / MCCB quantity & capacity 63A MCCB (4P)
33. Size & Type 415VAC-3PH
34. Applicable Standard (IEC) IEC 60947-2
G. Details of the Earthing*
35. Earth resistance (shall be less than 2 ohms) YES (1.25OHMS)
36. Size of the Earth wire / flat* WIRE (CU)
Two separate Earthing points
37. Modules & DC Surge arrester Yes
Inverter, AC Surge protection device & Lightening Arrester
38. Size & Type 10SQMM CABLE
39. Applicable Standard (BIS / IEC) IEC 60364
No te *Earthing shall be done in accordance IS 3043-1986, provided that Earthing
conductors shall have a minimum size of 6 mm2 copper wire or 10 mm2 Aluminium
wire or 3 mm X 70 mm hot dip galvanized steel flat.
H. Details of the Caution signage
40. Caution Signage YES
I. Provision of manual and automatic switches: Yes / No
41. Manual / Automatic Switches YES
J. G.P.S. Co-ordinates of the SPGS System Installation
42. Latitude / Longitude
K. Operation and Maintenance

43. Whether Operation and Maintenance Manual provided to


the consumer: Yes / No YES
Standards Certificate / Standard Number BIS / IEC / etc. to be mentioned, wherever applicable.

Certification:

I / We certify that the above said SPGS system is installed and the equipment used in the system comply
the Technical and Safety Standards as specified in the regulations notified by the MNRE / CEA / WBERC
for the SPGS systems.

Signature of the Applicant Name and Signature of the System Installer


Name and Address with Seal Name of the firm and Address

Name: .................................................................... EANDC ENGINEERING AND CONSULTANCY SERVICS PVT.LTD.


…………………………………………………………………............
…………………………………………………………………………… ……………………………………………………………………………. BABURBAG ,PURBA BARDHAMAN.713104 .WB
…………………………………………………………………………… …………………………………………………………………………….
29/09/2023
Date: ...................................................................... Date: …………………………………………………………………..

Enclosures:

1. Copy of the IEC / IS Test certificates of PV modules, Inverter, Cable etc.


2. Data sheets / Drawing for the array mounting System.
3. Actual Single line wiring diagram (SLD) of the SPGS.
4. Signed Agreement in duplicate.

N.B: Online Applicant should provide above documents during Connectivity Inspection