AHD-9321-Technical Specification For 11 KV Metering Cubicle
AHD-9321-Technical Specification For 11 KV Metering Cubicle
11 kV Metering Cubicle
Technical Specification for 11 kV Metering Cubicle
1. Scope of supply
1.1. This specification covers design, fabrication, manufacture, painting, testing, supply
and delivery of following variants of 11KV metering cubicles for HT consumers with
0.2S class 11 KV CTs (3 Nos.), PTs (3 Nos.), bushings, connecting bus bars, control
cables duly terminated suitable for use with three phase four wire bulk supply
energy measurement system and for indoor as well as outdoor application.
1.2. It is not the intent to specify completely herein all the details of the design and
construction of material. However the product shall conform in all respects to high
standards of engineering, design and workmanship and shall be performing in
continuous commercial operation in manner acceptable to the purchaser. The
offered material shall be complete with all components necessary for their
intended purpose. The design, manufacture and performance of equipment shall
comply with all currently applicable standards, regulations and safety codes in the
locality where the equipment will be installed. Nothing in this specification shall be
construed to relieve vendor of this responsibility. Moreover, the design and
components shall be deemed to be within the scope of vendor's supply
irrespective of whether those are specifically brought out in this specification
and/or the commercial order or not.
1.3. Any deviation from this specification to improve utility performance and efficiency
of 0.2S class 11KV metering cubicles or to secure overall economy shall be
considered, if such deviations are mentioned by the bidder with full justification.
2. Service conditions
The metering cubicle shall be suitable for continuous satisfactory operation in following
prevailing climatic conditions.
Page 2 of 35
Technical Specification for 11 kV Metering Cubicle
The overall climatic condition is moderately hot and humid tropical climate, conducive to
rust and fungus growth
3. Applicable standards
3.1. The equipment covered by this specification shall unless otherwise stated, be
designed, manufactured and tested in accordance with latest editions of the
applicable Indian and IEC standards and shall confirm to the regulations of local
statutory authorities. Non-exhaustive lists of applicable standards to various
equipments / accessories are enlisted as under.
3.2. The metering cubicle shall conform to following standards with latest revision.
Page 3 of 35
Technical Specification for 11 kV Metering Cubicle
Page 4 of 35
Technical Specification for 11 kV Metering Cubicle
3.3. Unless otherwise specified elsewhere in this specification the materials shall
conform to the latest version available of the standards as specified above.
3.4. Material conforming to other internationally accepted standards, which ensure
equal or higher quality than the standards mentioned above would also be
acceptable. In case the bidders who wish to offer material conforming to the other
standards, salient points of difference between the standards adopted and the
specific standards shall be clearly brought out in relevant schedule. Copy of such
standards with authentic English Translations, shall be furnished along with the
offer. In case of conflict the order of precedence shall be (i) IS, (ii) IEC, (iii) other
standards. In case of any difference between provisions of these standards and
provisions of this specification, the stringent provisions shall prevail.
4. Design criteria
4.1. The metering cubicle shall be capable of continuous operation of rated output
under the operating conditions of voltage and frequency variations as per
statutory limits governed by relevant Indian Standard and its amendments in force.
4.2. The design, materials and construction shall ensure secure reliability, economy,
safe and convenient operation and shall include all specified or unspecified
incidental items necessary for similar equipment for convenient working in every
respect.
4.3. All the material used in the manufacture of the Metering cubicle shall be of highest
quality and reputed make to ensure higher reliability, longer life and sustained
accuracy.
4.4. The metering cubicle shall be designed compartmentalized namely Instrument
transformer compartment, HT cable termination compartments and Metering
compartment.
4.5. All parts, which are subject to corrosion under normal working conditions, shall be
protected effectively. Any protective coating shall not be liable to damage by
ordinary handling or damage due to exposure to air, under normal working
conditions.
4.6. The design of the metering cubicle shall be based on safety to personnel and
equipment during operation and maintenance, reliability of service, ease of
maintenance, mechanical protection of equipment, interchangeability of
equipment and ready addition of future loads.
Page 5 of 35
Technical Specification for 11 kV Metering Cubicle
4.7. The design of the metering cubicle shall be such that no permanent or harmful
distortion occurs due to outdoor installation, excessive temperature, momentary
overloading etc.
4.8. All materials used should be of the best quality suitable for withstanding variations
of temperatures and atmospheric conditions without undue deterioration or
setting up of undue stresses anywhere. The metering cubicle shall be designed to
avoid collection of water anywhere. All connections and contacts shall be of ample
cross sections and surface for carrying specified currents continuously without
undue heating.
4.9. All insulating material used in the construction of the Metering cubicle shall be
non-hygroscopic, non-aging and of tested quality.
4.10. The metering cubicle shall be designed and constructed in such a way as to avoid
introducing any danger in use and under normal conditions so as to ensure
specially
4.10.1. Personnel safety against electric shock
4.10.2. Personnel safety against effects of excessive temperature
4.10.3. Protection against spread of fire
4.10.4. Protection against penetration of solid objects, dust and water.
4.11. Purchaser will provide the suitable size of power cable and termination accessories
only. All other material including CT cable, PVC pipe and foundation work are to be
arranged by the supplier.
5. General requirements
5.1. Enclosure
5.1.1. The enclosure and doors shall be made of minimum 3 mm thick
Galvanized steel sheet of 220 GSM confirming to IS 277: 2003,
tropicalized to meet Indian weather condition.
5.1.2. The metering cubicles shall be suitable for indoor and outdoor
installation in hot humid tropical atmosphere.
5.1.3. All equipments, accessories and wiring shall be provided with tropical
finish to prevent fungus growth.
5.1.4. The metering cubicles shall be used as a standalone unit with one set
of floor mounting pedestals and appropriate cable supporting
structure.
5.1.5. The height of meter to be at normal human vision in standing position
with approx. 1.6 meters.
Page 6 of 35
Technical Specification for 11 kV Metering Cubicle
5.1.6. All the material and components used in the manufacture of the
metering cubicle shall be of highest quality and reputed make to
ensure higher reliability, longer life and sustained accuracy.
5.1.7. The construction of the cubicle shall be modular type. It shall be
possible to replace the CTs of different ratios easily without any
modification in either bus bars or connections.
5.1.8. The metering cubicles shall be capable of continuous operation with
rated output under the operating conditions of voltage and frequency
variations as per statutory limits governed by relevant Indian
Standards and Electricity Act-2003 and its amendments in force.
5.1.9. The overall dimension of the all variants of metering cubicles shall be
identical and shall not be more than 1250 mm (Width) x 1000 mm
(Depth) x 1700 mm (Height).
5.1.18. 11KV metering cubicles shall be supplied with 11KV CT/PT (0.2S
Accuracy Class).
5.1.19. It shall be possible to replace the CTs/PTs of different ratios easily from
top of the cubicle after removing the top cover.
Page 7 of 35
Technical Specification for 11 kV Metering Cubicle
5.2.12. All materials used should be of the best quality suitable for
withstanding variations of temperatures and atmospheric conditions
without undue deterioration or setting up of undue stresses anywhere.
All mountings should be so designed as to avoid collection of water
anywhere. All connections and contacts shall be of ample cross
sections and surface for carrying specified currents continuously
without undue heating and shall be secured by nut bolts, screws with
adequate loading arrangement.
Page 8 of 35
Technical Specification for 11 kV Metering Cubicle
Page 9 of 35
Technical Specification for 11 kV Metering Cubicle
5.4.1. The 11KV metering cubicles shall have compartment to house the
energy meter and test terminal block.
5.4.2. The meter is not within the scope of the supply, but necessary
provision for its installation shall be made in the meter compartment.
5.4.3. Nitrile Rubber gaskets to be provided on the door frame of meter
compartment.
5.4.4. The door shall be supported by strong, heavy-duty, concealed type
hinges.
5.4.5. The door hinges should not be accessible from outside in any case.
5.4.6. The Meter compartment shall have a viewing window with toughened
glass of adequate size to ensure clear visibility of for easy/free viewing
of both the energy meter display.
5.4.7. The glass should be provided with suitable weatherproof seal to
prevent ingress of rainwater and dust.
5.4.8. Paper/Nylon washer to be provided with hardware fixing the glass to
avoid any crack at fixing point.
5.4.9. Fixing hardware of glass shall not be accessible from outside the
compartment.
5.4.10. Door of Meter compartment shall be earthed with separate earth braid
of adequate size.
5.4.11. Door of Meter compartment shall have door handle for grip to door
while open/close operation.
5.4.12. The covers shall be placed /fixed with M10/M12 SS hex bolts those
welded to the frame of cubicle.
5.4.13. The metering compartment shall be facilitated with enough space to
accommodated ABT meter with Check meter side by side. The
mounting arrangement shall be provided accordingly with minimum
safe distance.
5.5.1. The CTs shall be suitable for 3Phase 4 Wire 50 Hz systems as required.
Page 10 of 35
Technical Specification for 11 kV Metering Cubicle
5.5.2. The bidder shall use metering class current transformers manufactured
by highly repute firms across the world. Following are the list of
approved makes of CTs. However, purchaser is open to accept any
other equivalent quality.
5.5.2.1. Automatic Electric
5.5.2.2. Silkans
5.5.2.3. Crompton Greaves
Page 11 of 35
Technical Specification for 11 kV Metering Cubicle
5.5.4. The CTs shall be of indoor, single core wound primary, drying resin cast
type with ratio & class as per the requirement.
5.5.5. The core lamination shall be of high-grade steel or other equivalent
alloy.
5.5.6. The CTs shall be able to withstand the thermal and mechanical stresses
resulting from the maximum short circuit and momentary current
ratings as well as completely encapsulated.
5.5.7. The resin used for manufacturing of CTs shall be from reputed make
and resin casting to be carried out under vacuum by only hot setting
process.
5.5.8. The CTs shall have polarity marks indelibly marked on each
transformer and at the associated terminal block.
5.5.9. Each current transformer shall have rating plate with all relevant
details in accordance with IS: 2705. The rating plate shall be made of
noncorrosive material and indelibly punched / painted and shall be
firmly fixed on to body of the CTs.
5.5.10. In addition to the rating plate, the CTs shall have serial numbers and
ratios embossed on the body of the CT, so as same is visible from the
top after removing the top cover.
5.6. Potential Transformers
5.6.1. The potential transformers offered by the bidder shall be
manufactured by highly reputed firms across the world.
5.6.2. Following are the list of approved makes of PTs. However, Purchaser is
open to accept any other equivalent quality.
5.6.3.8. Burden : 15 VA
1.2 for
5.6.3.10. Voltage Factor : continuous and
1.9 for 30 sec.
5.6.4. The PTs shall be of indoor, single core wound primary, drying resin cast
type and with ratio as per the requirement.
5.6.5. The Core lamination shall be with high-grade steel or other equivalent
alloy.
Page 13 of 35
Technical Specification for 11 kV Metering Cubicle
5.6.6. The PTs shall be able to withstand the thermal and mechanical stresses
resulting from short circuits and spikes as well as completely
encapsulated.
5.6.7. The PT shall be provided with suitable rating of HRC fuse for
protection.
5.6.8. The resin used for manufacturing of PTs shall be from reputed make
and resin casting to be carried out under vacuum by only hot setting
process.
5.6.9. Each potential transformer shall have rating plate with all relevant
details. The rating plate shall be made of noncorrosive material and
indelibly punched / painted and shall be firmly fixed on to body of the
PTs
5.7. Bushings
5.7.1. The epoxy bushing terminals shall be suitable for 12KV / 36 KV / 95
KVp voltage systems.
5.7.2. The bidder shall use epoxy bushings manufactured by highly reputed
firms across the world. Following are the list of approved make of
bushings. However, Purchaser is open to accept any other equivalent
quality.
5.7.2.1. BHEL
5.7.2.2. Jayshree Insulators
5.7.2.3. WS Insulators
5.7.2.4. Calcutta Ceramics
5.7.2.5. Allied Ceramics
5.7.2.6. Baroda Bushings
5.8.1. 3 Phase, 4 Wire, Front Connection, link type Test Terminal Block
(TTB) with transparent polycarbonate cover and sealing Studs & Nuts
shall be provided in the meter compartment.
5.8.2. The test terminal block shall be of high grade, non-hygroscopic, low
tracking, fire resistant and made of high-grade engineering plastic that
Page 14 of 35
Technical Specification for 11 kV Metering Cubicle
Page 15 of 35
Technical Specification for 11 kV Metering Cubicle
5.9.5. The load side wiring connections from the TTB shall be running in
transparent HDPE conduits up to meter terminals. The meter ends of
these wires shall be crimped with suitable pin type copper lugs.
5.10. Busbar connections
5.10.1. The busbar used for interconnection shall be made from ETP grade
copper busbar (25 X 6 mm) confirming to IS 191 and its latest
amendments.
5.10.2. Minimum clearance of bus bars shall be maintained according to
requirements of IS: 4237.
5.10.3. The Bus bars shall be fitted /supported in a robust/secure manner by
Epoxy with Brass tube conical bus bar supports.
5.10.4. Adequate contact pressure shall be kept by means of bolt/nut with
plain washer (distribute the load under the bolt head evenly) and
spring washer (Provide constant pressure on nut /Bolt).
5.10.5. Length of bolts used for bus bar joints and others shall have two
threads exposed above the nut after complete tightening. The reason
for this is that the first two threads of a bolt are often poorly formed
and may not engage the nut properly. If they are not doing their share,
the other threads in the nut will be overloaded, and the nut may slip.
5.10.6. The Bus bars connections shall be done using SS-304 hardware.
5.10.7. Symbol identifying the manufacture and Grade shall be marked on the
head of Bolt.
5.10.8. Bolts, screws and nuts shall comply with requirements of IS 1367.
5.10.9. Red insulating sleeve shall be 10mm away from the conductor joints
and Red, Yellow, Blue colored tape to be wound on the bus bars of
CT/PT compartment and Cable compartment termination links.
5.10.10. Grommet shall be provided at the cutouts of cabinet wall where the
bus bars pass through.
5.11. Fasteners
5.11.1. The fastener shall be made of SS 304 grade stainless steel.
5.11.2. The Nut bolt shall be of Austenitic grade confirming to IS 1367 (part-
14) and its latest amendment.
5.11.3. Supplier shall maintain traceability from raw material procurement to
finish product, and the certificate of Traceability should be submitted
along with the consignment.
5.11.4. The mechanical properties of fasteners shall be as per IS 1367 and its
latest amendments.
Page 16 of 35
Technical Specification for 11 kV Metering Cubicle
5.11.5. The bolts shall be supplied along with nut, two plain washers of 2 mm
thickness and one spring washer suitable to size of bolt. The nut, bolt
and washers shall be supplied in assemble condition.
5.11.6. The plain washer shall be confirming to IS 2016 and its latest
amendments.
5.11.7. The spring washers shall be of Type B confirming to IS 3063 – 1994 and
its latest amendments.
5.11.8. The fasteners shall be free from forging and threading defects such as
cuts, spats, bulging taper eccentricity, loose fill etc. which may affect
their serviceability.
5.11.9. The fasteners shall be such that it shall withstand adequate mechanical
stress in extreme weather conditions.
5.11.10. The fasteners shall be smoothed and well finished. The threads shall
be machined well for smooth movement of nut throughout the length.
5.11.11. Finished fasteners shall be surface treated against corrosion and
atmospheric effect.
Page 17 of 35
Technical Specification for 11 kV Metering Cubicle
6.3. Degreasing
This is to be achieved by immersing the sheet metal in alkaline base solution
degreasing bath. The dipping time is 10-15 minutes at room temperature. The pH
value of the alkaline base solution shall be 10-10.5. It removes dirt, grease, oil, like
deposits of the dipped parts.
6.4. Cold Water Rinse
Rinse the sheet metal in cold water. The water shall be clean, fresh and continuous
overflowing. It removes all loose impurities from the surface.
6.5. De-rusting / Pickling
Page 18 of 35
Technical Specification for 11 kV Metering Cubicle
Page 19 of 35
Technical Specification for 11 kV Metering Cubicle
7. Marking
7.1. Danger Plate
7.1.1. The danger plates shall comply with requirements of IS 2551-1982.
7.1.2. The plate shall be fixed on the cover of Incoming and Outgoing cable
compartment with rivets at corners.
7.1.3. The danger plate shall be made from aluminum, at least I.6 mm thick
and vitreous enameled white, with letters, figures and the
conventional skull and cross-bones in signal red color.
7.2. Indication marking of LIVE with symbol as shown below shall be provided on each
cable box cover.
8. Rating Plates
8.1. The CTs and PTs shall have rating plate engraved with manufacturer name, Year of
Manufacture, all technical particulars and in accordance with IS: 2705.
8.2. The rating plate shall be made of non-corrosive stainless steel material and
indelibly punched. The rating plate to be fixed on the CT & PT and need to be
visible from the top after removing the top cover.
8.3. The primary terminals shall have CT ratio punched on it at one side and Serial
Number on other side. The polarity markings shall also be of permanent nature.
8.4. The Rating plates to be fixed at the base of mounting plate of unit in addition to
fixing on the CT&PT.
9. Markings
9.1. Name Plate of Complete Panel
The 11KV metering cubicles shall have a nameplate that is clearly visible, effectively
secured against removal, indelibly and distinctly marked with all essential
particulars given below.
Page 20 of 35
Technical Specification for 11 kV Metering Cubicle
9.1.7. Technical details of CT (Ratio, VA Class, Short Time current, Ref. Indian
standard, Insulation level)
9.1.8. Serial No. of CT for 3 phases (16 digit alphanumeric number to be
provided by Purchaser)
9.1.9. Technical details of PT (Ratio, VA Class, Voltage factor, Ref. Indian
standard, Insulation level)
9.1.10. Serial No. of PT for 3 phases (16 digit alphanumeric number to be
provided by Purchaser)
9.2. Instruction Notice
9.2.1. Label marked with “Use four lug to lift this unit” shall be pasted at
both sides of 11KV metering cubicles near the lifting hook.
9.2.2. Color of letter shall be black and label background with white.
9.3. Phase Indication mark
9.3.1. “R, Y, B” letter shall be painted on the wall of cable compartments
near the R,Y,B termination links and on the front side of cable
compartment cover.
9.3.2. “Incoming and outgoing” shall be painted in red color at the inner base
of cable compartments and on the front side of cable compartment
cover.
9.4. Fastener Torque chart
9.4.1. Standard fastener torque values (Nm) shall be printed on a self-
adhesive label and pasted inside the door of metering chamber.
9.4.2. Background of label shall be white and color of letter to be black.
9.5. Earth marks labels/plates
9.5.1. Earthing terminals shall be marked in accordance with IEC 417 No.
5017.
9.6. Connection diagram
Page 21 of 35
Technical Specification for 11 kV Metering Cubicle
10.4.7. List of testing equipment available with the bidder for final testing of
equipment along with valid calibration reports shall be furnished with
the bid. The manufacturer shall possess 0.1 class instruments for
measurement of losses.
Page 22 of 35
Technical Specification for 11 kV Metering Cubicle
11. Documents
The bidders shall furnish the below documents with the offer.
11.1. General arrangement drawing showing all components suitably mounted.
11.2. Insulating materials to be used for encasing copper bus bars.
11.3. Detailed drawings of the terminal block.
11.4. Detailed drawings of the 11KV metering cubicles showing the location of the seals
to be applied to the make the 11KV metering cubicles intrusion-proof.
11.5. The bidder should own or have assured access (through hire, lease or sub-
contract) of the painting facility including shot blasting and / or the 3-tank process.
11.6. Detailed layout / drawings of the rating and Nameplate.
11.7. Quality Assurance Plan (QAP) and Manufacturing Process Plan (MPP).
11.8. Name of sub-vendors for the raw materials.
11.9. List of standards according to which the raw materials are tested.
11.10. List of test normally carried out on raw materials.
11.11. Information and copies of test certificates in respect of bought out accessories.
11.12. List of equipment for testing along with latest calibration certificates.
11.13. Documents for genuine source of EC grade conductivity section and MS sheets.
12. Minimum Testing Facilities
12.1. The bidder must clearly indicate the details of testing facilities available at the
works of manufacturer and the facilities are adequate to carry out all routine tests.
12.2. These facilities shall be made available Purchaser’s representative whenever
needed for witnessing at manufacturer’s works.
12.3. The bidder shall have following minimum testing facilities.
12.3.1. For CT/PT at original manufacture’s works
1.1.1.1. CT Test Setup with current source, burden box and
standard CT to measure the accuracy and phase angle
error.
1.1.1.2. PT Test Setup with voltage source, burden box and
standard PT to measure the accuracy and phase angle
error.
1.1.1.3. Partial discharge test setup.
Page 23 of 35
Technical Specification for 11 kV Metering Cubicle
13.1. The vendor shall manufacture a prototype 11KV metering cubicles and offer to
Purchaser for inspection.
13.2. 15 day’s advance intimation must be given to Purchaser for organizing the
deputation of their representatives to witness the routine inspection mentioned
under clause 37.2.
13.3. Purchaser can decide upon performing the proto inspection at manufacturer end
or give waver/clearance to process with mass production.
13.4. Inspection and acceptance shall not absolve the vendor of his responsibility to
supply the material in accordance with the specifications/drawings.
13.5. On approval of prototype, the supplier shall submit the drawings and get it
approved from Purchaser before bulk manufacturing. No additional delivery period
will be permitted for approval of prototype and drawings.
13.6. The supplier shall furnish the following drawings (in AutoCAD format) along with
the offer.
13.6.1. Complete assembly drawings of the 11KV metering cubicles showing
plan, elevation and typical sectional views and locations of cable
boxes, bus bars, metering compartment, meter etc. with principal
dimensions
13.8. The 11KV metering cubicles shall confirm to latest revisions of relevant standards at
the time of ordering and Purchaser shall reject any work or materials, which, in
their judgment, is not in full accordance therewith.
Page 24 of 35
Technical Specification for 11 kV Metering Cubicle
13.9. In case for series production, the metering 11KV metering cubicles to be 100%
checked by vendor at their premises.
13.10. Vendor shall keep record of internal inspection/testing and to be submitted
whenever demanded.
13.11. Routine test report and Final inspection checklist in soft copy form to be E-Mailed
to Purchaser QA/QC and hard copy to be attached with invoice copy during the
dispatch of 11KV metering cubicles to Purchaser stores.
14. Pre-dispatch inspection
14.1. All acceptance tests and inspection shall be carried out at the place of
manufacturer unless otherwise specially agreed upon by the supplier and
purchaser at the time of purchases.
14.2. The supplier shall give 10 day advance intimation to the purchaser to organize
stage and pre-dispatch inspection of the metering cubicle.
14.3. The material shall not be shipped before the inspection has been carried out
according to the approved quality assurance plan unless otherwise instructed by
the purchaser.
14.4. The manufacturer shall offer the inspector representing the purchaser all the
reasonable facilities free of charge, for inspection and testing, to satisfy him that
the material is being supplied in accordance with this specification.
14.5. The Metering cubicle shall be subjected to the all the routine/ acceptance test
mentioned in this specifications in presence of purchaser’s representative at the
place of manufacture before dispatch without any extra charges.
14.6. To ascertain the quality of raw material the original manufacturer’s test report shall
be submitted at the time of inspection. The purchaser may test the raw material at
the place of manufacture without any extra charges.
14.7. Purchaser can test the Metering cubicle by using their own testing instruments at
manufacturer’s premises.
14.8. The acceptance of any material prior to shipment shall in no way relieve the
supplier of any of his responsibilities for meeting all the requirements of the
Specification and shall not prevent subsequent rejection if such materials are
found to be defective.
15. PO MILESTONES
15.1. The supplier to provide the Purchase order execution plan within 7 days from the
placement of PO covering followings:
Page 25 of 35
Technical Specification for 11 kV Metering Cubicle
15.3. Purchaser shall review Documents and provide the comments else approval within
5 working days.
15.4. The supplier shall provide updated documents within 7 days from the receipt of
comments from Purchaser.
15.5. Purchaser shall review final set of documents and provides approval within 5
working days after receipt of revised documents.
15.6. The supplier shall offer the inspection at least 7 days in advance for customer hold
points as per approved QAP.
15.7. In case any Non-conformance observed during inspection, the supplier the re-offer
the inspection within 7 days from inspection.
15.8. The supplier shall intimate respective store in-charge for the delivery in 7 days
advance after receipt of MDCC.
15.9. In case any non-conformance observed post supply of the material, the supplier
shall visit the site as per following matrix for preliminary assessment or immediate
correction action:
Sr Criticality Days
15.10. The supplier shall submit the Root cause analysis and CAPA report within 30 days
from the report of non-conformance.
16. Tests
16.1. Type Tests
Type tests shall be carried out on a sample of 11KV metering cubicles to verify
compliance with standards. The type tests listed below shall be carried out from
laboratories, which are accredited by the National Board of Testing and Calibration
Page 26 of 35
Technical Specification for 11 kV Metering Cubicle
Page 27 of 35
Technical Specification for 11 kV Metering Cubicle
Page 28 of 35
Technical Specification for 11 kV Metering Cubicle
In addition to what specifically mentioned in the specification, the bidders shall provide the
following.
18.1. Equipments list and its specifications.
18.2. Name of sub vendors for the raw materials.
18.3. Information and copies of test certificates in respect of bought out accessories.
18.4. List of equipment for testing along with latest calibration certificates.
18.5. Purchaser Quality shall witness the Routine tests and submit their findings thru
Proto Inspection report.
18.6. Vendor shall comply with the findings and submit compliance report and If the
compliances are found to be satisfactory, Purchaser Quality shall grant
clearance/acceptance for the proto.
18.7. Purchaser Quality can decide upon performing the proto inspection at
manufacturer end or give waver/clearance to precede with mass production.
18.8. Proto type acceptance is limited to only physical, dimensions & Operational
purpose. Inspection and acceptance shall not absolve the vendor of his
responsibility to supply the material in accordance with the specification.
19.5. The easily damageable material shall be carefully packed and marked with
appropriate caution symbols. Whenever necessary, proper arrangement for lifting,
such as lifting hooks etc. shall be provided.
19.6. Vendor shall be responsible for any damage to the equipments during transit and
delivery because of inadequate and improper packing. Vendor is liable for free
replacements of damaged items due to defective or insufficient packing and / or
protection inadequate packing.
Page 29 of 35
Technical Specification for 11 kV Metering Cubicle
19.7. Loose material can be packed in Polyethylene bags and tagged inside the 11KV
metering cubicles.
19.8. Plastic packaging made of virgin or recycled plastic, shall not be less than fifty
microns in thickness.
20. Dispatch
20.1. 11KV metering cubicles covered in this specification shall be delivered to various
stores of the Purchaser, Ahmedabad, Surat, and Dahej will be intimated to the
successful vendors.
20.2. The vendor shall quote delivery periods for various equipments and shall stick to
the committed delivery.
20.3. It may clearly be noted that the delivery period will under no circumstances be
linked up with other formalities.
21. Submission of drawings
Schedule of submission of drawings for approval shall be as under
21.1. First submission within 10 days of PO/LOI
21.2. Purchaser’s comments in 10 days from the receipt of drawings
21.3. Supplier to furnish final drawings within next 5 days of commented drawings
21.4. Purchaser to send back stamped approved copy within 10 days after receipt of
correct drawing.
21.5. As built drawing to be submitted within 7 days of final inspection
22. Deviations
The bidders are not allowed to deviate from the principal requirements of the
specifications. However, the bidder is required to submit detailed list of all deviations
without any ambiguity. Unless otherwise brought out separately by the bidder in the
schedule of deviations, the energy Fuses offered shall conform to the specification
scrupulously. The discrepancies between the specification and the catalogues or literature
submitted as part of the offer shall not be considered as valid deviations unless specifically
brought in the schedule of deviations.
Page 30 of 35
Technical Specification for 11 kV Metering Cubicle
Annexure-A
Guaranteed Technical Parameters
1. Name of Manufacturer :
2. Address of Manufacturer :
3. System parameters
5. Insulation Level
6. Cubicle
Page 31 of 35
Technical Specification for 11 kV Metering Cubicle
7. Current Transformer
7.1. Make of CT :
7.3. Type :
7.10. Burden :
Page 32 of 35
Technical Specification for 11 kV Metering Cubicle
8. Potential transformer
8.1. Make of PT :
8.3. Type :
8.9. Burden :
9. Bushings
Page 33 of 35
Technical Specification for 11 kV Metering Cubicle
12.1. Make :
Page 34 of 35
Technical Specification for 11 kV Metering Cubicle
2. Copper Conductor
3. MS Sheet/Angles/Channels
5. Gaskets
6. HV Bushings
7. Paint
LIST OF DOCUMENTS
(The bidder shall submit the below documents for each size of transformer)
2. Details of fittings.
Page 35 of 35