KECAMATAN X Y X*2 Y*2 XY
A 80 100 6,400 10,000 8,000
B 70 90 4,900 8,100 6,300
C 60 80 3,600 6,400 4,800
D 85 125 7,225 15,625 10,625
E 100 150 10,000 22,500 15,000
F 150 200 40,000 40,000 30,000
JUMLAH 545 745 72,125 102,625 74,725
Ypred (Y-Ypred)^2
KECAMATAN X Y X*2 Y*2 XY Ypred
A 80 100 6,400 10,000 8,000
B 70 90 4,900 8,100 6,300
C 60 80 3,600 6,400 4,800
D 85 125 7,225 15,625 10,625
E 100 150 10,000 22,500 15,000
F 150 200 40,000 40,000 30,000
JUMLAH 545 745 72,125 102,625 74,725
Column 1 Column 2
Column 1 1
Column 2 0.97986729 1
(Y-Ypred)^2
SUMMARY OUTPUT
Regression Statistics
Multiple R 0.979867287750022
R Square 0.960139901602584
Adjusted R Square 0.95017487700323
Standard Error 10.0426268044087
Observations 6
ANOVA
df SS MS
Regression 1 9717.4159208 9717.4159208028
Residual 4 403.417412531 100.85435313263
Total 5 10120.8333333
Coefficients Standard Error t Stat
Intercept -0.96013018714403 13.3905095424 -0.0717022891551
X Variable 1 1.37754271765663 0.14033855598 9.8158535837997
F Significance F
96.350981578594 0.000604
P-value Lower 95%Upper 95%Lower 95,0%
Upper 95,0%
0.9462808050558 -38.13814 36.21788 -38.13814 36.21788
0.0006039089969 0.9879 1.767185 0.9879 1.767185