ELSSG02D
ELSSG02D
PIP ELSSG02D
Data Sheet for Medium Voltage Metal-Clad
Switchgear from 2.4 kV to 34.5 kV
PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES
In an effort to minimize the cost of process industry facilities, this Practice has
been prepared from the technical requirements in the existing standards of major
industrial users, contractors, or standards organizations. By harmonizing these technical
requirements into a single set of Practices, administrative, application, and engineering
costs to both the purchaser and the manufacturer should be reduced. While this Practice
is expected to incorporate the majority of requirements of most users, individual
applications may involve requirements that will be appended to and take precedence over
this Practice. Determinations concerning fitness for purpose and particular matters or
application of the Practice to particular project or engineering situations should not be
made solely on information contained in these materials. The use of trade names from
time to time should not be viewed as an expression of preference but rather recognized as
normal usage in the trade. Other brands having the same specifications are equally
correct and may be substituted for those named. All Practices or guidelines are intended
to be consistent with applicable laws and regulations including OSHA requirements. To
the extent these Practices or guidelines should conflict with OSHA or other applicable
laws or regulations, such laws or regulations must be followed. Consult an appropriate
professional before applying or acting on any material contained in or suggested by the
Practice.
Data Provided By: n Buyer l Seller With Proposal t Seller After Order
Service Conditions (4): Power Circuit Breakers (8): (cont’d)
¨ Altitude ___________ Ft ¨ Seismic Zone __________ ¨ Ground & Test Switch Required
¨ Ambient Temperature: Max. ______ ° F Min. ______ ° F Description: ___________________________________
¨ Other ___________________________________________ _____________________________________________
Rating & System Parameters (5): Main Bus Ratings (9.1):
o Volts_____________ Phase ________ Hertz o ________ Amperes o Silver-Plated o Tin-Plated
_____________ Barriers (9.3.3)
o Wye o Delta o Other: __________________ o No o Yes
Fault Current___________(RMS SYM) X/R Ratio________ Remote Control (10.2)
One-Line Dwg. No.__________________________________ o Required (Description Attached) o Not
System Grounding: Required
o High Resistance o Low Resistance o Ungrounded CT Wire Color (10.3.2)
Ground Fault Current ___________________ Amperes o Black o Gray
Feeder Breaker Configuration (6.1.5): Differential CT Wire Color (10.3.10)
o One-High o Two-High o Red/Blue/Yellow o Gray
Indicating Lights (10.7.1):
Cable (6.2):
o Amber______________ Purpose____________________
Power Cable Entry: o Top o Bottom
o Other_______________ Purpose____________________
Cable Lugs: o By Buyer o By Seller
Control Cable Entry: o Top o Bottom Heat Output Data:
l_________________ BTU/HR For Entire Swgr. Line Up
Bus Duct (6.3)
o By Switchgear Seller o By Others oNot Required Metering (10.7):
Bus Duct Entrance (6.3) : o Microprocessor-Based o Other: __________________
o Top o Bottom o Back o Per Layout Sketch o Communication Req’d. o Communication Not Req’d.
o RS 485 o Other: _______________________________
Arc - Resistant Construction (7):
o No o Yes Type B o Other:________________ Protective Relaying (10.8):
Power Circuit Breakers (8): o Relay Description Shown on One-Line________________
o Operating Voltage, 125 VDC o Other:________________ o Flexitest Switches per PIP ELSSG02, Section 10.8.2
o Capacitive Trips for AC Operating Voltage o Relay Description Shown on Attachment______________
For Failure of Capacitive Trip Device: o Automatic Trip Device or ¨ Trip Circuit Monitoring
Relay
o Auto Trip o Alarm Contacts
o Double Output Contacts
¨ Dual Trip Coils Not Required for Motor & Generator
Breakers Space Heaters (10.9):
Operating Voltage Source: o Thermostat Switch Not Required
o By Buyer o By Seller (per attachments) t Space Heater Load ___________ Watts @_________Volts
l Interrupting Rating: ___________kA @____________kV ¨ Other: ________________________________________
l Close and Latch: ___________kA Space Heater Current Monitoring (10.9.4 e)
Remote Racking Device o Required o Not Required o Not Required o Required
¨ Accessories in PIP ELSSG02, Section 8.13 Not Required Interior Finish (11):
¨ Mfg. Std. ¨ White
Data Provided By: n Buyer l Seller With Proposal t Seller After Order
Shop Inspection & Tests (12.4): Documentation:
n Mfr./ANSI Standard Tests ¨ Other Tests as Described Electronic Document Format: ¨ .DXF ¨ Other: _______
¨ Witnessed ¨ Not Witnessed Manufacturer To Provide:
¨ Preshipment Shop Inspection 1 Reproducible Plus
o Certified Test Reports ______ Number of Copies of All Documentation Plus
¨ Other: ______________________________________ ______ Copies of the Operating Manuals
Other Requirements: