Technology Concrete
Technology Concrete
Ma
[Time: 3 Hours] Concrete Technology (2015304-P)
(a) Vicat apparatus (b) Le- Chatelier apparatus (c) soundness meter (d) None of these
(arsstH z)
i. During hydration of Cement, which compound liberates lower heat?
(a) C2S (b) C;S (c) CsA (d) CAF
iii. Slump test is done for:
(a) Directly Proportional (b) Inversely Proportional (c) Equal to (d) None of these
(H4rqr) (grsAHgr) (ATa) (Rà )
vii. BY using Super - Plasticizers as an admixture
(a) Water/cement ratio reduces (c) Shrinkage of concrete reduces
(b) Strength of concrete increases (d) Allof the above
(3utes h)
Page I of 4 201530
EDDOI3455B1C926233BSB4lAFDB6312B
-20)
strength
tensile(a) Rounded(a) (b) (a) (a) (a) 27°C(a)
xvi. xvi. XV.
riv. xiii. ) xi.durability(a)
xii.1:0S:(a10 X. (b) (a) 0x. (a) vii.
(tarAR ) More Coarser
(HlZI 10 30 (fz1344) Less Low 75
(75
Rebound f The m min to
Which Water Expansion
(10 The The Grade Aggregate Cement Shinkage
water/cement
(30 150) According
150
grading risk 41)
yÍz process concreting
of in fe) M20
hammer the the ) of in
of
segregation joints has impact concrete in to
following concrete
aggregate
of concrete
mixing, operations a ratio IS
test are nominal 456-2000,
value
Shrinkage
limit(b) is Elongatedaggregate
(b) provided
(b)
used is (b)
transporting, 30°C(b) 1:2:4(b) toughness(b) can (b)
(fregrt) (rta) more mix is
AFDB6312B
15 60 performed (en) the tbe (S0)25 à 25 the
tO m if min of: reduced to
indicator-
measure for. (15 the ( 50slump
gives (60
) length
fr) placing at M20 by value
maximum temperature of-
Page using
of qH (A n
concrete and
2 IATR mm
of (c) Flaky(c) (c) compacting
(c) 35°C(c) hardness(c) I (d) (c) (c)
4 Thickness strength 1:3:6(c) used
(rve) (d) (c) 45 90 above (satn) HUA (3 ) All Proper 100)(50 À50
(3tn) All Large structure
m min HI:) 4H of to in
in (45 100ordnary
of (90 the
Concrete
of concrete? the size ) the
exceed: fr) cement above
member above
aggregates is
Called R.C.C.
(d) mìx
concrete
(d) Cubical(d) None
(d) 40°C(d) hotl:1.5:3(d) strength(d) (d) mm )
work
Surface
s)
(HTE (uu) (HIt)
of 120 weather (30)20 20 for
these should to
min 30beams
hardness
(À not concreting.
(120
and
take
2015304-P 5T frz) slabs
T) more
is
than:
200(a) m (Kg
a10
) Colour(a)
Q.3 Q.2 (m) wii.
Q.5 Q.4 (200+0.) (1m)
0,
Q.6
What What concrete
work?What Write Enlist What What Explain aggregates
Classify What Transport What Gypsum
are are is a the do do is is
the the Compaction short you you
Duft apid the is
application of added
d1tlerent essential note mean mean Abrahnm's concrete weight
hardening
on by by of for
factor? cffect of based
types
requirements one
different
curing hydration
cement? of
Water 300(b) m by (bKg
20
) Strength(b)
of of on cement? (300+0.,) pumps (2m,
f0
%), bag (yvd)
Write of their
material storage cement of manufacturingcementin
types concrete? is
of the Shape. done cement
used a Value on of ratio
good strengthadmixtures. Group
(Tu-)(B) for
Page
(rrer) What law.
in
for OR form
(rar)
ofOR (rr)OR (3rT)OR (3reT)OR a India?
3
eT-proofing? Workability horizontal
of of are
4 work? 400(c) m (30
cKg
) (c)
cement. its (3m,0f%),
objectives? (400+0.) Controll1ng
distance
requirement
of setting
for time
different (d) (dKg
50
)
None (5.)
0%.
(d)
types of (rtnn) Al
these
of of
P above
4 4
Q.10 Q.9 Q.8 Q.7
O.11
transportation
concreate?of
Differentiate mixes? Write Discuss during
and What What laboratory. With Describe Explain What
Define
the are do a are
Nominal the neat any
objectives you the important the
after
advantagesconcreting? sketch, six different
between understand different
mix types
of
Characteristics
explain
setting and stages ofmethods
concrete and cement
design by
disadvantages hot the
and of
mix weatherconcreting compaction indicating for
mix.
hardening of Non-destructive
What design. fine
concreting? Group
of operations? aggregates. their
(3rrar)
ofOR are (3rar)OR
Discuss (34Yar)OR factor
(r4aT)OR (3rat)OR
Ready
Concrete. the physical (C)
various test
mix test (g-
the What
Describe for
steps concrete. of )
What precautions finding properties concert?
methods
to
safety control them the
of and Describe
Precautionsproportioning should inworkability
bleeding short. uses.
be any
6 6 6