0% found this document useful (0 votes)
43 views7 pages

Manikanta

Document

Uploaded by

murali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views7 pages

Manikanta

Document

Uploaded by

murali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

CURRICULUM VITAE

MANIKANTA. A
D.NO: 4-7,
K.KOTHAPAIEM (v),
MOPIDHEVI (m), KRISHNA (d),
A.P-521125.

Email Id: [email protected]


Mobile: 9989908323, 6302068119...

OBJECTIVE:
Continuous improvement is my way of life and work professionally to succeed, which
requires dedication, creativity, confident enough to venture into the challenging work.

EDUCATION:

SSC: School of Secondary Education in Z.P.Highschool (2009-2010),


K.Kothapalem.

DIPLOMA: Civil Engineering in S.M.V.M.Polytecnic (2010 -2013) Tanuku.

BPCE: bachelor program in Civil Engineering at Asian institute of management


and technology (2014 -2017)

WORK EXPERIENCE:
∙ 6th months project work in PRI@ attili
⮚ Roads (c.c road, tanuku to attili L=400mts B=10mts Es cost =98
lakhs), Buildings, culverts & drains.
∙ Experience in adithya construction @ 3 months
⮚ Irrigation works in Bhimavaram (structures (D.P’s, TAIL DAM.))

SKILLS, ROLL & STRENGTHS IN PROJECTS…..


 Execution of works as per contracts specifications of the section
 To guide the engineers on explaining the layout & drawings and execute
with full technical compliance
 Provide inputs for preparing the work plans and resource requirements for
works
 A preliminary survey has to be conducted before the start of excavation of works
 Seek necessary resources for my section from superiors or reasonable persons
 Ensure compliance of quality & safety in my section
 achieving the production norms & cost reduction norms in my section
 quantity estimations & joint measurements with field engineer
 manage the field performance for achievements
 to do the sub-contractor bill as per work in site
 preparing the working drawings for minor structures
 take the permission from independent engineers for all respective works

PROJECTS HANDLED ARE:


1. PROJECT (Jul2013 to Dec2015)
EMPLOYER: BSCPL INFRASTRUCTURE LTD.

PROJECT DETAILS: FOUR LANING OF ORISSA BORDER-AURANG FROM Km 88+000


TO KM 237+000 OF NH-6 IN THE STATE OF CHHATTISGARH TO BE EXECUTED AS
BOT(TOLL) ON DBFOT PATTERN UNDER NHDP PHASE-IV . Cost: 1040 cores.

Description: Consisting of approx. 150Km length of Flexible Road


with pipe culverts, slab culverts, Box culverts, Minor bridges,
Major bridges, Toll Plazas.
Tenure: Nov, 2013 to2017.
▪ Client: National Highway Authority of India
▪ Concessionaire: BSCPL Aurang Toll ways Limited

▪ EPC: BSCPL Infrastructure Limited


▪ Independent Engineer: AARVEE ASSOCIATES
ARCHITECTS ENGINEERS & CONSULTANTS PVT. LTD.

Role in this project : joined as a DET in structures department and promoted as


junior engineer, tackled 8.5kms stretch in this project , 5kms above median drain,
1.8km side drain, one toll plaza(advanced), 5 winding bridges, 2 proposed bridges
in one was PSC gadder bridge, and pipe culverts extra(24nos)……….

2. PROJECT (JAN 2016 to April 2018 ).


EMPLOYER: (GAYATRI PROJECTS LTD) RATNA INFRASTRUCTURE
PROJECTS PVT. LTD.

PROJECT DETAILS: Widening To Two Lane with Geometric Improvement of NH44A


with in the state of Mizoram. Cost: 900crores.

Description: Consisting of approx. 103Km length of Flexible Road with


Retaining walls, pipe culverts, slab culverts, Box culverts, Minor bridges, and
Major bridges.

Tenure: 2012 to till date.


▪ Client: GVT of India ministry of shipping, road transport &highways
department of road transport & highway.
▪ Concessionaire: Gayatri projects ltd.

▪ EPC: ratna infrastructure projects ltd.

▪ Independent Engineer: PWD.

Role in this project: joined as a site engineer in structures department and


promoted as Asst. project manager for all respective works. Tackled nearly
17.5kms DBM completed in my under, so much of typical earth works
completed in my under & nearly 38kms all respective structures I did…
(Nearly 110 above structures)

DESIGINATION: Asst. Project Manager cum site in charge (all recording work in
reach)

RESPONSIBILITIES:
Role: APM cum site in charge
∙ Responsible to Project Manager.
∙ Executes work through sub contract/own labour economically as per drawings.
∙ Checks work done on regular basis especially lines, levels etc.
∙ Safe keeps all tools in good condition.
∙ Execution of Laying in the site as per drawing with standard specifications.
∙ Making of BBS of Structures as per design drawings.
∙ Estimation of quantities of Steel, concrete of Structures.
∙ making of bills for the Sub-Contractor as per quantities.
∙ Preparing the BBS
∙ Participation of testing’s relevant to Structures like (Load test).
∙ Conducts regular housekeeping practices ensures safety procedures, co-
operates with safety supervisors. ∙ Interact with PWD .JE & SDO to fallow the
PWD JE instruction and managing in site. ∙ To move the work with as per site
condition.
∙ Layout checking and marking execution at site.
∙ Structures finalization as per site witch type of structures come.
∙ Maintain the sub contractors in site
∙ preparing the pre stressed graders.
∙ handling the pre stressed operation in casting add.
∙ arranging the machinery what you required at site.
∙ helping to pwd je in site execution.
∙ preparing the working drawing.
∙ Arrange the materials to sub contractors what we required at site.
∙ maintaining the good relation with local people for works.
∙ planning for good progress in my reach.
∙ Preparing work sites for DBM and manage the department Je at that time.
∙ Maintain the stock adds with required materials.
∙ I am responsible for anything in my reach (work &staff).
3. PROJECT (aprl2018 to oct2019).
EMPLOYER: GAYATRI PROJECTS LTD...

PROJECT DETAILS: FOUR LANING OF ANDRA PRADESH/TAMILNADU


BORDER TO NALAGAMPALLI FROM KM.133.36 TO KM.171.59 OF NH-4
UNDER NHDP-PHASE-lV in the state of ANDRA PRADESH…. Cost: 308
crores.

Description: Consisting of approx. 38Km length of rigid


pavement Road with Retaining walls, pipe culverts, slab
culverts, Box culverts, Minor bridges, and Major bridges. &
extra…
Tenure: 2017 to till date.
▪ Client :national highways authority of INDIA.
▪ Concessionaire: Gayatri projects ltd.
▪ EPC :agrs projects llp.
▪ Independent Engineer: aarvee associates.

Role in this project: joined as DPM (deputy project manager) (overall structures in
project… 37.11kms) in structures…..

Responsibilities of deputy project manager (structures)


⮚ Play the key role in execution of structures in my
stretch
⮚ Drawing study & if there any correction suggest to designer as per site…
⮚ Taking approval from IE for all respective works.
⮚ Preparing BBs
⮚ preparing sub-contractor bills
⮚ Responsible to DPM
⮚ Allot the work to sub-contractor based on their workmanship
⮚ Arranging materials to contractors
⮚ Maintain the quality at the same time cost controlling

4. PRESENT PROJECT (oct2019 to till date).

EMPLOYER: Sphiro Infratech Pvt Ltd...

PROJECT DETAILS: REHABILITATION AND UP-GRADATION OF “SECTION –


III, FARDAPUR – JALGAON” FROM KM. 99+660 TO KM. 144+750 (DESIGN
CHAINAGE) OF “AURANGABAD – JALGAON ROAD NH-753F” AS PER NEW COS
4-LANE STANDARD CONFIGURATION IN THE STATE OF MAHARASHTRA.
COST: - 440 Cr.
Description: Consisting of approx. 45.09Km length of rigid
pavement Road with Retaining walls, pipe culverts, slab
culverts, Box culverts, Minor bridges, and Major bridges. &
extra…
Tenure: 2015 to till date.
▪ Client: national highways authority of INDIA.
▪ Concessionaire: LANCO-RITHWIK JOINT VENTURE.
▪ EPC: SPHRO – DARA JV.
▪ Independent Engineer: PIDC PVT LTD.

Role in this project: joined as DPM (deputy project manager) (overall structures in
project… 45.09kms) in structures…..

Responsibilities of deputy project manager (structures)


1. Responsible for execution and completion of project tasks for the organization
while ensuring the tasks are on time, on budget, and within scope
2. Resource planning & Controlling time management.
3. Organizing and delivering the project activities.
4. Cost estimating and developing the site construction budget.
5. Responsible for site progress.
6. Focus on resolving site issues.
7. Responsible for leading the particular site team.
8. Organizing and controlling the specific site activities.
9. Must communicate with all the team members

⮚ Play the key role in execution of structures in my


stretch
⮚ Drawing study & if there any correction suggest to designer as per site…
⮚ Taking approval from IE for all respective works.
⮚ Preparing BBs
⮚ Preparing sub-contractor bills
⮚ Responsible to Project manager
⮚ Allot the work to sub-contractor based on there workmanship
⮚ Arranging materials to contractors
⮚ Maintain the quality at the same time cost controlling

EXPERIENCE On
1. VUP (3) & PUP (1)

2. MNB (23) & MJB (4)

3. SC (21), BC (67) & HPC (257)


4. Toll Plaza
(2) ♦ Buildings (11)

❖ TUNNEL (1)
❖ Side drain (1.8km/1.2km)

5. Median Drains/side drain (14.5km)


6. RR masonry retaining walls.
7. Earth work in hill area (18km)
8. All layers like sub grade, gsb, wmm (17.5km)
9. DBM (17.5km)

STRENGTHS:

Sincere and punctual towards work, a good team worker with sound communication and
analytical skills.

SOFTWARE SKILLS
∙ Drafting Software :Auto CAD.
∙ Fundamentals: MS- Office (Word, Excel)

TOTAL Experian’s
0 year 6 months training in PRI
0 year 3 months in adhitya construction
2 years 6 months in BSCPL IL
3 years 10 months in Gayatri projects Ltd.
1 years 10 months in Sphiro Infratech Pvt Ltd (present

working) From 8 years 11 months in field

PRASENT DESIGNATION

: Deputy project manager (overall structures in project… 44.00kms)

PERSONAL DETAILS:
Father’s Name: Addanki Rambabu
Date of Birth: 14-05-1995.
Marital Status: Single
Sex: Male
Nationality: Indian
Mother Tongue: Telugu
Language Proficiency: Telugu, English, Hindi.

Hobbies:
 Studying Books.
 Listening to music.
 Watching entertainment programs.
 Investing in stock market.

LIFE TIME GOLE:


∙ I want to work in at least one milestone project at INDIA

DECLARATION:

I hereby declare that above-mentioned information is correct up to


my knowledge and I bear the responsibility for correctness of above-
mentioned particulars.

Place:
Date:

(A.MANIKANTA)

You might also like