0% found this document useful (0 votes)
20 views1 page

LLD Internal Well Flow Incident

LLD

Uploaded by

imranmallick621
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views1 page

LLD Internal Well Flow Incident

LLD

Uploaded by

imranmallick621
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LESSONS LEARNED (INTERNAL INCIDENT)

Well Flow Incident


WHAT HAPPENED?
During pressure testing 3rd party pressure lines, observed well flowing from tubing side. Activated BOP to isolate
annulus immediately and diverted flow from rig floor. Isolated tubing from gravel pack completion setting tool and
secured well.

WHAT WENT WRONG? WHAT WERE THE CAUSES?


• Inadequate risk assessment in terms of monitoring
downhole losses.
• Surface testing lines were having multiple issues.
• No stop work authority was exercised.

CORRECTIVE ACTIONS AND LESSONS:


• Review and update the Well Control Risk Action
Plan for the inclusion of specialized jobs like Gravel
Packs, Frac, ESPs.
• For all the non-routine Completion Operations (like
gravel packing operations), a separate plan for the
well control situation needs to be added with all the
detailed task steps.
• Develop workflows for well control and monitoring
during the completion testing phase both for
perforated / non-perforated wells.
• Issue standing instructions to all Well Site Leaders /
service providers to ensure testing and proper
function of the tools and equipment before mobilization at the rig site and present a “Fit for Job” or “Ready to
Use” certificate to Well Site Leader.
• Develop Well Control Incident Response team with Roles & Responsibilities and respective Training Need
Analysis. Update Well Control Manual.
• All the Well Site Leaders to be engaged for exhibiting proper behaviors during the well control challenging
situations.
• For high-risk critical non-routine activities, Driller’s instructions, needs to have second level review from
Project Engineer.
• Conduct a session with the Well Site Leader for gaps in the management of Well Control Risk.

[email protected].