AFRA BMP Guide 4.0 Fillable Disassembly Checklist
AFRA BMP Guide 4.0 Fillable Disassembly Checklist
Published by the
Revision 4.0
REVISION HISTORY
Title Page
Table of Contents
COVERSHEET
Company
Name:
Address:
Auditor Information:
Applicability Codes: For a given Best Practice citation, these codes denote the area within the system that
the Best Practice mostly applies to. The codes are:
M = Manual
F = Facility
I = Inventory
A = Audit Records
T = Tooling Records
TR = Training Records
W = Work Package
C = Contract Review (Pull contracts for the reviewed Work Package)
SECURITY
BEST PRACTICE (III)(b) 1 - M Identify the
The Facility shall establish a description of
secure area in which how security will
disassembly will take place. be maintained at
the time of
disassembly; this
may be N/A if
there is
permanent
physical security
evident at the
time of the
Facility
Inspection.
TR Examine
representative
records to
confirm
compliance;
confirm training
in either how to
use manuals or
in specific
applicable
manual
provisions
TR Examine
representative
records to
confirm
compliance;
confirm
employees have
received job-
specific training
DOCUMENTATION & RECORDS / ASSET AND TRANSACTION RECORDS
BEST PRACTICE (V)(a) 1 – A M Identify the
disassembly Facility shall procedure.
have a procedure for
identifying, collecting and W Examine
reviewing the appropriate representative
records related to the Asset. work package to
make sure
records are
actually
collected
W Review
representative
work package(s)
to assure
creation of
manifest(s).
C Review
representative
contract(s) to
assure reference
to manifest(s)
W Review
representative
work package(s)
to assure that
work performed
matches written
customer
expectations.
C Review
representative
contract(s) to
assure
compliance
BEST PRACTICE (V)(a) 4 - A M Identify a
disassembly Facility shall procedure
have a clear, written meeting this
understanding of how the requirement; if
Asset is to be discarded there is no
following disassembly. procedure then
make a note to
confirm that the
issue is
addressed as a
contracting
norm.
C Review
representative
contract(s) to
assure
compliance
W Review
representative
work package(s)
to confirm
compliance; also
check parts
identified during
inventory phase
TAGGING IN A DISASSEMBLY OPERATION
BEST PRACTICE (V)(c) 1 – For M Identify a
each part removed from the procedure for
Asset, the disassembly the completion
Facility shall prepare a of tags meeting
disassembly identification tag this
to identify the part. Each tag requirement; if
shall be attached to the part there is no
or otherwise associated with procedure then
it upon the part’s removal. make a note to
confirm that the
issue is
addressed in the
representative
work packages
or through
examination of
inventory.
I Examine
representative
parts from
inventory to
assure they are
properly tagged
I Examine
representative
parts from
inventory to
assure (1) they
are not tagged
with approval for
return to service
tags OR
(2) approval for
return to service
tags meet
manual
requirements
W Review
representative
work package(s)
to confirm
compliance
BEST PRACTICE (V)(d) 2 – M Identify a
Following disassembly, the procedure
records associated with the supporting this
Asset shall be returned to the requirement; if
Customer or handled there is no
according to the Agreement procedure then
between the disassembly make a note to
Facility and the Customer. confirm that the
issue is
addressed in the
representative
work packages.
W Review
representative
work package(s)
to confirm
compliance
through records
verifying transfer
of documents
F If tooling is
present, then
spot-check to
ensure it is
appropriate;
make a note of
representative
tooling for
reference during
tooling record
review
BEST PRACTICE (VI) 2 – M Identify a
Tooling, equipment and procedure
machinery should be supporting this
maintained, calibrated and requirement; if
tested according to the there is no
manufacturer’s procedure then
recommendations, so long as make a note to
those recommendations are confirm that the
appropriate to the usage at standard is met
the facility. Where there are in tooling
no manufacturer’s review.
recommendations for
maintenance, calibration and T Spot-check
testing, or where the tooling
manufacturer’s maintenance /
recommendations are calibration
inappropriate for the Facility, records
the Facility should develop its
own procedures for
maintenance, calibration and
testing.
W Confirm
compliance with
manual
procedures
through review
of representative
shipping records
if any hazmat
has been
shipped in
relation to the
work package(s)
BEST PRACTICE (VII)(c) 4 – M Identify
The Facility shall have a procedure.
procedure for assuring its
own compliance with import W Confirm
and export regulations. compliance with
manual
procedures
through review
of representative
shipping records
if any exports or
imports have
been undertaken
in relation to the
work package(s)
F Examine facility
to assure
compliance with
procedures
F Identify fluid
management
and disposition
mechanisms,
including
equipment for
drainage,
management
and disposal
BEST PRACTICE (VIII) 3 – The M Identify
disassembly facility shall procedure for
have a procedure for coordination.
evaluating and selecting a
recycling Facility that can C Examine recycler
adequately meet the selection records
Facility’s recycling goals. - confirm that
the
selection/evalua
tion procedure
was successfully
accomplished.