Under Implementation 08-2024

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
337 views

Under Implementation 08-2024

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 57

Total Appointed Date/Start

Sr. No. State Project Name NH(New) Mode Lanes Concessionaire


Length Date- Contractor
Bangalore Chennai Expressway (Phase-II Pkg-I) from km.71.000 to
Montecarlo Bangalore Chennai expressway
1 Andhra Pradesh Km 96.000 (Bethamangala in the state of Karnataka to NE-7 25 HAM 6L/8L 10/10/2022
P2P1 Private Limited.
Byreddypalli)
Bangalore Chennai Expressway (Phase-II Pkg-II) from km.96.000
2 Andhra Pradesh NE-7 31 HAM 8L 08/06/2023 APCO Infratech Pvt. Ltd.
to Km 127.000 (Baireddypalle to Bangarupalem section)

Bangalore Chennai Expressway (Phase-II Pkg-III) from km.127.000 BANGARUPALEM GUDIPALA HIGHWAYS
3 Andhra Pradesh NE-7 29 HAM 8L 04/10/2022
to Km 156.000 (Bangarupalem to Gudipala section) LIMITED
Solar Highway Lighting at 18 locations from Km 741.255 to Km
1022.494 on Anakapalli – Annavaram – Diwancheruvu section of Item
4 Andhra Pradesh 16,216A 3.975 Others 19/12/2023 Morphing Inovations (OPC) Pvt. Ltd.
NH-16 & Diwancheruvu - Siddhantham - Gundagolanu section of Rate
NH-216A
Construction of Flyover at Km 936+440 of NH-216A [Jonnada
Junction with Black Spot ID: AP – (02)-134], Flyover at Km
967+180 of NH-216A [Undrajavaram Junction with Black Spot ID:
AP - (02)-078], Flyover at Km 970+370 of NH-216A (Tetali Junction 216A,216A,
5 Andhra Pradesh with Black Spot ID: AP – 005), VUP at Km 1006+525 of NH-216A 216A,216A, 6.425 EPC 4L 19/09/2022 Shrushti Contech Pvt. Ltd.
(Kaikaram Junction with Black Spot ID: AP – 007) for rectification 216A
of Blackspots and construction of Flyover at Km 910+760 of NH-
216A in Rajahmundry City (Morampudi Junction) in the State of
Andhra Pradesh on EPC Mode

One Time Improvement of existing Hanuman Junction Road (From


Item
6 Andhra Pradesh Km. 1055.680 to Km. 1060.800) on Vijayawada - Gundugolanu 16 5.12 4L 05/02/2024 Abhipsa Construction, Bhubaneswar.
Rate
Section of NH-16 (Old NH-5) in the State of Andhra Pradesh
Six Laning of Vijayawada Bypass from Gollapudi to Chinnakakani
7 Andhra Pradesh in Vijayawada - Gundugolanu Section from km. 30.00 to km. 16 17.88 HAM 6L 07/07/2021 Vijayawada Bypass Project Private Limited
47.881 (Pkg-IV)
6L of Chilkararupet bypass from km. 357.400 to km. 371.920 of
8 Andhra Pradesh 16 16.38 HAM 6L 28/06/2021 Chilakaluripet Bypass Private Limited
NH-16 [Revived of earlier terminated N/02004/27001/AP]

Development of Emergency Landing Facility on Chilakaluripet -


9 Andhra Pradesh 16 3.6 EPC 4L 26/12/2019 KMC Construction Ltd.
Nellore Section from km. 1273.00 to km. 1278.00
VUP at Km. 1379.934 of NH-16 [Golagamudi Junction with
Blackspot ID: AP-(02)-392), Service Road from Km. 1380.350 to
Km. 1380.957 of NH-16 [Sundaraiah Colony Junction with NH-16,NH-
10 Andhra Pradesh 3.43 EPC 4L/6L 27/03/2023 Shrushti Contech Pvt. Ltd.
Blackspot ID: AP-(02)-188] & Flyover at Km. 1383.195 of NH-16 16
Nellore T Junction with Blackspot ID: AP-(02)-189] for rectification
of Blackspots
6L of Veera Kaveri Raja Puram to Pondavakkam from km 61.380
11 Andhra Pradesh
to km 96.040 of NH 716B (Pkg-III) 716B 34.66 HAM 6L 25/01/2023 KNR Constructions Limited
6L of Pondavakkam to Kannigaipair from km 96.040 to km
12 Andhra Pradesh
116.100 of NH 716B (Pkg-IV) 716B 20.06 HAM 6L 24/01/2023 IRB Infrastructure Developers Ltd.
6L Aluru - Jakkuva Section of NH-130CD Road from km 365.033 to
13 Andhra Pradesh
km 396.800 (Pkg. 1) 130CD 31.767 HAM 6L 31/03/2022 H.G. Infra Engineering Limited

Page 1 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
6L Jakkuva – Korlam Section of NH-130CD Road from km 396.800
14 Andhra Pradesh
to km 421.100 (Pkg 2) 130CD 24.3 HAM 6L 31/03/2022 NKC Projects Private Limited
6L Kantakapalle – Sabbavaram Section of NH-130CD Road from
15 Andhra Pradesh
Km 445.100 to Km 464.662 (Pkg-4) 130CD 19.562 HAM 6L 06/10/2022 NKC Projects Private Limited
16 Andhra Pradesh
Renigunta - Poyya - Naidupeta km 124.60 to km 183.4 of NH 71 71 57.046 HAM 6L 31/01/2022 Megha Engineering and Infrastructure Ltd.
6L Access Controlled Greenfield Highway from Kodur (Ch. 0+000)
17 Andhra Pradesh
to Vanavolu (Ch. 24+300) of [NH-544G] (Package-1) 544G 24.3 HAM 6L 09/03/2024 Dilip Buildcon Ltd.
6L Access Controlled Greenfield Highway from Yerragudipadu (Ch.
18 Andhra Pradesh 129+000) to Audireddipalle (Ch. 160+000) of [NH – 544G]
(Package-6) 544G 31 HAM 6L 12/02/2024 Megha Engineering and Infrastructure Ltd.
6L Access Controlled Greenfield Highway from Nallacheruvu palli
19 Andhra Pradesh (Ch. 96+300) to Yerragudipadu (Ch. 129+000) of [NH-544G]
(Package-5) 544G 32.7 HAM 6L 12/02/2024 Megha Engineering and Infrastructure Ltd.
6L Access Controlled Greenfield Highway from Odulapalle (Ch.
20 Andhra Pradesh 72+000) to Nallacheruvu-palli (Ch. 96+300) of [NH-544G](Package-
4) 544G 24.3 HAM 6L 05/02/2024 Dilip Buildcon Ltd.

21 Andhra Pradesh 6L Access Controlled Greenfield Highway from Vankarakunta (Ch.


45+700) to Odulapalle (Ch. 72+000) of [NH-544G](Package-3) 544G 26.3 HAM 6L 02/03/2024 Raj Path Infracon Pvt. Ltd.

22 Andhra Pradesh 6L Access Controlled Greenfield Highway from Vanavolu (Ch.


24+300) to Vankarakunta (Ch. 45+700) of [NH-544G] (Package-2) 544G 21.4 HAM 6L 02/03/2024 Raj Path Infracon Pvt. Ltd.

23 Andhra Pradesh 6L Access Controlled Greenfield Highway from Narayanmpet (Ch.


203+500) to Chandrasekharpuram (Ch. 228+000)(Package-10) 544G 24.5 HAM 6L 12/02/2024 Megha Engineering and Infrastructure Ltd.
6L Access Controlled Greenfield Highway from Mallapalle (Ch.
24 Andhra Pradesh
176+000) to Kavulakuntla (Ch. 196+000) (Package-08) 544G 20 HAM 6L 12/02/2024 Megha Engineering and Infrastructure Ltd.

25 Andhra Pradesh 6L Access Controlled Greenfield Highway from Audireddipalle


(Ch. 160+000) to Mallapalle (Ch. 176+000)(Package-07) 544G 16 HAM 6L 07/03/2024 Dilip Buildcon Ltd.

26 Andhra Pradesh 6L Access Controlled Greenfield Highway from Polavaram (Ch.


260+000) to Marripudi (Ch. 285+500) of [NH-544G](Package-12) 544G 25.5 HAM 6L 12/02/2024 Megha Engineering and Infrastructure Ltd.
6L Access Controlled Greenfield Highway from
27 Andhra Pradesh Chandrasekharapuram (Ch. 228+000) to Polavaram (Ch.
260+000)of [NH-544G] (Package-11) 544G 32 HAM 6L 12/02/2024 Megha Engineering and Infrastructure Ltd.
6L Access Controlled Greenfield Highway from Somavarappadu
28 Andhra Pradesh (Ch.314.600) to Muppavaram (Ch.343+240) of [NH-544G]
(Package-14) 544G 28.64 HAM 6L 12/02/2024 Megha Engineering and Infrastructure Ltd.
6L Access Controlled Greenfield Highway from Marripudi (Ch.
29 Andhra Pradesh 285+500) to Somavarappadu (Ch. 314+600) of [NH-544G]
(Package-13) 544G 29.1 HAM 6L 10/02/2024 KNR Constructions Limited
Khammam-Devarapalle Pkg IV [4L Access Controlled (Greenfield)
30 Andhra Pradesh from Recherla village to Gurvaygudem village (Design Chainage
105+236 to 132+664)] 365BG 27.428 HAM 4L 26/09/2022 Jangareddygudem Projects Private Limited

Page 2 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Khammam-Devarapalle Pkg V [4L Access Controlled (Greenfield)
31 Andhra Pradesh from Gurvaygudem village to Devarapalle village (Design Chainage Rajamahendravaram Greenfield Highway
132+664 to 162+126) 365BG 29.462 HAM 4L 26/09/2022 Private Limited
32 Andhra Pradesh
4L PS Mydukur - Badvel from Km 585.820 to Km 630.960 of NH-67 67 45.14 HAM 4L PS 21/09/2023 RITHWIK-NSPR Consortium

Road Safety works with construction of 1 Nos ROB, 2 Nos VUPs,


Service roads, provision of lighting and construction of other
33 Andhra Pradesh
miscellaneous works at various stretches including maintenance
of existing section of NH-4 from AP/Tamil Nadu Border
(Km.134.890) to Nalagampalli village (Km.172.000) 4 5.45 EPC 4L PS 19/06/2023 SD Infra
6L of Varadharajula to Kumarajapet from km 0.000 to km 43.800
34 Andhra Pradesh
of NH-716B (Pkg-I) 716B 43.8 HAM 6L 06/12/2022 KCC Buildcon Pvt. Ltd.
6L of Kumarajapet to Veera Kaveri Raja Puram from km 43.800 to
35 Andhra Pradesh
km 61.380 of NH-716B (Pkg-II) 716B 17.58 HAM 6L 30/10/2023 EKK Infrastructure Limited
4L of Pileru to Kalur Section from Km 55.900 to Km 92.800 & Km
36 Andhra Pradesh
94.500 to Km 95.717 of NH-71(Package-II) 71 38.117 HAM 4L 24/10/2023 Megha Engineering and Infrastructure Ltd.
4L of Madanapalle to Pileru Section from Km 0.000 to Km 55.900
37 Andhra Pradesh
of NH-71(Package-I) 71 55.9 HAM 4L 14/01/2023 G R Infraprojects Limited
Up gradation of Port Connectivity NH Configuration of existing 2L
to 4L road from Achhampeta Junction (NH-216) to Kakinada
38 Andhra Pradesh
Anchorage Port Connecting Vakalpudi light house from Km. 0.000 RK Infracorp Pvt Ltd - Suryodaya Infra
to Km. 13.198 of NH-516F 516F 13.198 EPC 4L 13/07/2022 projects (I) Pvt Ltd (JV)
Development of 4L Road from Samarlakota to Achampeta
39 Andhra Pradesh Junction as part of Kakinada Port Connectivity to NH-16
(Rajanagaram Junction) in East Godavari District 516F 12.25 EPC 4L 17/08/2023 Rail Vikas Nigam Limited
6L of Naidupeta Junction - Turpukanupur Section from km 57.046
40 Andhra Pradesh
to km 91.927 71 34.881 HAM 6L 20/10/2023 APCO Infratech Pvt. Ltd.
Dedicated Port road to Krishnapatnam Port (Package-I) from Km.
41 Andhra Pradesh
0.000 to Km. 18.000 PC 18.98 EPC 6L 20/12/2018 VDB Projects (P) Ltd.

Construction of four lane access controlled highway from


Chillakuru cross road to Turpu Kanupur (Part 1 of Package - II) km
0.000 (131.500 of NH - 16) to km 23.770 on New NH-516W
42 Andhra Pradesh including six lane flyover and approaches on NH-16 (length km
1.050) and six lane access controlled from Turpu Kanupur to Port
South Gate (Part 2 of Package - II) km 23.770 to km 35.015 on
New NH-516W in the state of Andhra Pradesh on HAM Mode
under Bharatmala Pariyojana Phase I 516W 36.065 HAM 4L 07/12/2023 Megha Engineering and Infrastructure Ltd.
Improvement of 4L road to 6L road and 4L dedicated Port Roads
43 Andhra Pradesh for the Port connectivity road from Convent junction to
Sheelanagar Junction 516C 9.58 EPC 6L 14/02/2024 RKD Construction Pvt. Ltd.
Repair And Rehabilitation Of Ambedkar Centenary Bridge, Nehru
44 Andhra Pradesh Centenary Flyover & Ramp-A Flyover on Port Road, Item
Visakhapatnam 516C 10.35 Rate 2L 05/04/2023 FRP-Tech india Private Limited

45 Andhra Pradesh Construction of Flyover/Underpass at Vizag Airport Junction to SVS Mookambika Constructions Private
ensure Flow of container trailers to/from MMLP setup at NH-16 16 1.935 EPC 2L/4L PS 16/08/2023 Limited

Page 3 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
4L Greenfield Road connecting North and South industrial cluster
of Khandaleru Creek near Krishnapatnam port at
46 Andhra Pradesh Thamminapatnam to Mollur from Km 0.0 to Km 16.046, Part I &
6L extension of dedicated port road of NH-67 (Km 18.0 to Km AMR India Limited in JV with Rithwik
19.3, Part II) 516W 15.95 EPC 4L 25/09/2023 Projects Private Limited

4L Road from existing East break water upto Convent Junction


47 Andhra Pradesh
from Phase 1 of the project start from Km. 0.312 [End of
Vishakhapatnam Port Trust (VPT)] to Km. 3.800 [VCTPL Exit Gate] TBD 3.488 EPC 4L 01/04/2022 Sudharma InfraTech Pvt . Ltd.
4 Laning of NH-544D from Km 0.000 to km 37.000 of Anantapur- SRC Infra Anantapur – Muchukota HAM Pvt.
48 Andhra Pradesh
Muchukota section (Pkg-1) 544D 37 HAM 4L/2L PS 23/07/2023 Ltd.
4 Laning of NH-544D from Km 37.000 to km 69.000 of Muchukota-
49 Andhra Pradesh
Bugga section (Pkg-2) 544D 32 HAM 4L/2L PS 17/08/2023 MEIL Ananthapur Roadways Private Limited
4L PS from Kurnool (Existing Km. 5.400 of NH- 40/Design
50 Andhra Pradesh Km.0.000) to Mandlem (Existing Km.38.000/Design Km 30.600) of PSK Infrastructures and Projects Private
NH-340C (Package-1) NH 340C 30.6 HAM 4L 05/10/2023 Limited
4L PS from Mandlem (Existing Km. 38.000/Design Km.30.600) to
51 Andhra Pradesh Atmakur (Existing Km.73.000/Design Km 66.115) of NH-340C PSK Infrastructures and Projects Private
(Package-2) NH 340C 35.515 HAM 4L 23/11/2023 Limited
Construction of LVUP for IISER Campus at Km 504.850 in
52 Andhra Pradesh Penchalkona-Yerpedu section from Km 424.400 to Km 509.400 of
NH-565 565 0.25 EPC 2L PS 04/10/2023 JP Infrastructures
Providing new median Highway lighting supply erection testing
installation and commission(SETIC) at Venkatagiri Municipal
53 Andhra Pradesh Location in Nh-565 stretch from Km 480.690 to Km 483.140(Total
length: 2.450Km) at Penchalakona to Yerpedu Section of Nh-565 Item Arjunvaishnavi Infrastructure and
in the state of Andhra Pradesh 565 2.45 Rate 2L PS 26/01/2024 Developers Pvt. Ltd.

Major Maintenance of NH-30 (Old NH-221) from Ibrahimpatnam


54 Andhra Pradesh
Circle (Km.0+000) to AP/Telangana Border (Km.71.200) of 2 Lane Item
with paved shoulder project in the state of Andhra Pradesh 30 70.19 Rate 2L PS 10/03/2024 Abhipsa Construction, Bhubaneswar.
Rehabilitation and Strengthening of Distressed Major Bridge
55 Andhra Pradesh 649/1 on NH-67 near Kadirinayudupalli Village at Km 648.030 to Item
Km 648.190 67 0.16 Rate 2L 07/11/2023 SSA Techno Construction Pvt. Ltd.
Long-Term Measures for 3 Nos. of Blackspots Locations at
56 Assam
Sundari, Kishan Bazar and Manikpur of NH-27 27 3.32 EPC 6L 01/03/2023 Dhariwal Buildtech Limited
6L Standalone Flyovers at Bongaigaon, Chapaguri, Pathsala,
57 Assam Simlaguri chowk and Baihata Bypass Junctions on stretches of NH-
31 and NH-27 27 6.984 EPC 6L 01/01/2023 Shiv Build India Pvt. Ltd.

NH-31(New
58 Assam
NH-27),NH-
Long Term Measures for 4 Nos. of Black spots at Tihu,Society 54(New NH-
Chowk,Changsari Madanpur & Daboka 27) 4.2 EPC 4L 28/02/2023 Dhariwal Buildtech Limited

59 Assam Balance work of 4L of Narimbanglo–Jatinga Junction-


Harangajoroad section from Km 0.000 to Km 49.230 of NH-27 27 49.23 HAM 4L 16/01/2023 Dineshchandra R. Agrawal Infracon Pvt. Ltd.

Page 4 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

60 Assam 6L Standalone Flyovers at Raha, Demow, Borghat, Kathiatali


junctions and ROB at Jagiroad on stretches of NH 36 and NH 27 27 7.346 EPC 6L 05/12/2022 Dhariwal Buildtech Limited

Rehabilitation work for Damaged Road sections AS-27(KM 40+000


61 Assam
to KM 60+500),AS-25 (KM 83+400 to KM 111+000),AS-24 (KM Item
111+000 to KM 126+450) & AS-23 (KM 126+450 to KM 140+700) NH-54 1.034 Rate 4L 25/05/2023 Dhariwal Buildtech Limited
2L with ES of Yagyi - Kalewa section from Milepost 40/0 to
62 Assam
Milepost 115/5 in Myanmar 112.14 EPC 2L 28/05/2018 Punj Lloyd Ltd. - Varaha Infra Ltd. (JV)
Six Laning of Varanasi to Aurangabad from km. 786.00 to km.
63 Bihar 19 192.4 BOT Toll 6L 12/09/2011 Soma - Isolux
978.40 of Old NH-2
6L of Aurangabad to Bihar-Jharkhand border (Chordaha) section
64 Bihar 19 39.698 EPC 6L 05/04/2022 VRC Constructions (India) Pvt. Ltd.
from km. 209.827 to Km. 249.525 of NH-19 (PKG-02)
Balance work - WB-10 (Gandak Bridge) Km 402.00 to Km 440.00 Item
65 Bihar 27 2.75 4L 30/07/2022 Ganesh Ram Dokania
(Devanpur - Kotwa) Rate
4L Elevated Highway and at grade improvements at Gopalganj
66 Bihar 27 2.75 EPC 4L 04/03/2022 ASC Infratech Pvt. Ltd.
Town from Km. 384.000 to Km. 386.750 on NH-27
Permanent rectification of 3 nos. of black spots in project
Highway NH-27 of U.P border - Dewapur - Kotwa section from
Km.360.915 to km.440.000 (Total Length of 79.085 Km) of NH-
67 Bihar 27 13.604 EPC 4L 12/12/2023 EVRASCON - UARPL JV
27& Permanent rectification of 5 nos. of black spots of project
Highway NH-27 of Kotwa - Mehsi - Muzaffarpur Section from
km.440.000 to km.520.000 (Total length 80.00Km)
4L of Bahadurganj Araria section from Km 49.000 to Km 94.000
68 Bihar
(Package-II) of NH-327E 327E 44.995 HAM 4L 10/01/2022 G R Infraprojects Limited
6L Bridge and its approaches across River Ganga as Part of Patna
69 Bihar Ring Road (NH-131G) starting from Km 8.480 near Sherpur to Km
23.000 near Dighwara 131G 14.52 EPC 6L 05/09/2023 Singla constructions Limited
4L Greenfield Alignment of Amas to Shivrampur from 0.000 Km.
70 Bihar
to 55.002 Km. of NH 119 D (Pkg-I) 119D 55.002 HAM 4L 31/03/2023 Megha Engineering and Infrastructure Ltd.
4L Greenfield Alignment of Shivrampur to Ramnagar from Km.
71 Bihar
55.002 to Km. 109.300 of NH 119 D (Pkg-II) 119D 54.322 HAM 4L 04/07/2023 Megha Engineering and Infrastructure Ltd.
4L Greenfield Alignment from Kalyanapur to Tal Dashraha of NH-
72 Bihar
119D (Pkg-III) 119D 47 HAM 4L PS 16/02/2023 Megha Engineering and Infrastructure Ltd.
4L of Greenfield Alignment from Km. 47.000 to Km. 89.210 of
73 Bihar
Balbhadarpur to Bela Nawda Section of NH-119D 119D 42.21 HAM 4L PS 11/03/2024 Ram Kripal Singh Construction Pvt. Ltd
74 Bihar Ara - Mohania (Pkg-II) 319 60.8 EPC 4L 16/01/2021 Ashoka Buildcon Limited

Construction of VUP’s at Km 565+175 (Tajpur Junction), at km


75 Bihar
574+550 (Mushrigharari Junction) & at Km 593+660 (Dalsingh
Sarai Junction) in the State of Bihar on EPC mode Basis. 122 4 EPC 4L 06/03/2024 Aarpee Infraprojects (P) Ltd.
Rehabilitation and Upgradation of Chroma - Bairgania Section of
76 Bihar National Highway No 227F to 2 lane with paved shoulders from
Design Ch.0.000 to Ch. 34.566 227 F 34.566 HAM 2L PS 01/02/2024 Dhariwal Buildtech Limited

Page 5 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

Construction of 2 flyovers of 4- lanes at Chhatauni Chowk and


Awadesh Chowk on the Piprakothi- Motihari- Raxaul section of
NH-28, Re-construction of 3 no. of gantry girder gates with the
77 Bihar
statue of Mahatma Gandhi on NH-28 and NH-28A & Construction
of Service Road and Drain near Piprakothi on NH27(Old-NH28)
Kotwa – Mehsi- Muzaffarpur Section from km 440.00 to km
520.00(Under TOT) 527D,27 3.335 EPC 2L/4L PS 11/07/2024 Amber Infraproject Pvt. Ltd.
78 Bihar Bakhtiyarpur (Km 153.300) to Mokama (Km 197.900) 31 44.6 EPC 4L 14/06/2017 BSCPL Infrastructure Ltd.

79 Bihar Welspun Enterprises Ltd. In consortium with


Aunta - Simaria including Ganga Bridge 31 8.15 HAM 4L/6L 30/08/2018 Welspun Energy P. Ltd.
4L Elevated Section and at-grade improvements at Begusarai
80 Bihar town (Simaria - Khagaria section) from Km. 221.047 to Km. Altis Holding Corporation -Transrail Lighting
225.302 of NH-31 31 4.255 EPC 4L 27/06/2022 Limited JV
81 Bihar
Bakhtiyarpur-Rajauli Pkg-III from km. 101.630 to km.152.520 20 50.89 HAM 4L 31/12/2021 Gawar Construction Ltd
4L of Munger – Mirzachauki section from Munger to Kharia village Montecarlo Munger Mirzachauki 1 Highway
82 Bihar
junction from Km 69+520 to Km 95+580 (Pkg-1) 80 26.06 HAM 4L 31/03/2022 Private Limited
4L of Munger – Mirzachauki section from Km 157+350 to Km
83 Bihar
193+931 (Pkg-4) 80 36.58 HAM 4L 17/08/2022 APCO Infratech Pvt. Ltd.
4L of Munger – Mirzachauki section from Km 95+580 to Km
84 Bihar
125+000 (Pkg-2) 80 29.42 HAM 4L 12/03/2022 APCO Infratech Pvt. Ltd.
4L of Munger – Mirzachauki section from start of existing
85 Bihar Bhagalpur bypass to Rasulpur from Km 125+000 to Km 157+350 Montecarlo Munger Mirzachauki 3 highway
(Pkg-3) 80 32.35 HAM 4L 06/04/2022 Private Limited
Maheshkunt-Saharsa-Purnea (Pkg I) km 0.00 to km. 90.00 of NH-
86 Bihar
107 231 90 EPC 2L 20/12/2019 Gannon Dunkerley and Co. Ltd
87 Bihar
Maheshkunt -Saharsa-Purnea Pkg II 231 87.96 EPC 2L 13/12/2018 Gammon Engineers & Contractors Pvt. Ltd.
BOT
88 Bihar
Chhapra - Hajipur from km. 143.200 to km. 209.200 31 66.74 Annuity 2L/4L 27/01/2011 Madhucon Projects Ltd
Short Term Improvement and Routine Maintenance for the work
of Four laning of Chhapra-Hazipur section except 2 laning of
89 Bihar Chhapra Bypass of NH-19 from Km 143.200 to Km 209.940 of NH-
19 in the State of Bihar under NHDP phase-III on BOT (Annuity) on Item
DBFOT basis(2nd Call). 31 66.74 Rate 2L/4L PS 19/09/2022 Vinay Construction
Widening with additional 3L abetting Chhapra Bypass Section of
90 Bihar
NH-19 from Km. 143.200 to Km. 159.255 (Pkg-1) NH-31 16.05 EPC 6L 30/08/2024 R K Jain Projects Private Limited
Overlay maintenance of NH-31(Old NH-19) from Km. 174.300 to
91 Bihar Km. 179.700 and from Km. 180.200 to Km. 197.800(Aami to
Sonepur) 2nd call 31 23 EPC 2L 12/03/2024 Kairav Green

Page 6 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

4L Elevated Corridor and at-grade improvements from Design


Ch:0+000 to Design Ch: 19+870 of Danapur – Bihta Section,
Design Ch:0+000 to Design Ch:0+231 connecting the existing RoB
92 Bihar
near Danapur station ,1.35 Km ramps and at-grade improvements
to 4-lane section on Danapur side and Upgradation of existing
Two lane carriageway to Four Lane carriageway from Design Ceigall India Limited-YFC Projects Private
Ch:19+870 to Design Ch:23+500 of Bihta - Koilwar section 922 25.081 EPC 4L 11/03/2024 Limited JV
4L of Bal. works of Patna - Gaya -Dobhi (Pkg-I) from km. 0.00 to Item
93 Bihar
km. 39.00 of Old NH-83 22 39 Rate 4L 14/12/2020 JSP Projects Pvt Limited
4L of Bal. works of Patna - Gaya -Dobhi (Pkg-II) from km. 39.00 to Item
94 Bihar
km. 83.00 of Old NH-83 22 44 Rate 4L 09/11/2020 Ram Kripal Singh Construction Pvt. Ltd
4L of Bal. works of Patna - Gaya -Dobhi (Pkg-III) from km. 83.00 to Item
95 Bihar
km. 127.217 of Old NH-83 22 44.217 Rate 4L 24/11/2020 Ram Kripal Singh Construction Pvt. Ltd
4L Greenfield starting from NH-30 near Saristabad (Patna) to
96 Bihar Nathupur (Project end point of Patna-Gaya-Dobhi Section of NH- H.S. Engineers & Associates-Velji Ratna
83) 83 3.914 EPC 4L PS 27/02/2024 Sorathia Infra Pvt. Ltd. JV
Umagaon-Saharsa (Package-IV) Koshi Bridge & approach Road - Gammon Engineers & Contractors Pvt. Ltd. -
97 Bihar
(Bheja-Bakaur) 527 A 13.3 EPC 2L 12/02/2020 Transrail Lighting Ltd.
Umagaon-Saharsa (Package-V) Bakaur-Parsarma-Bangaon-
98 Bihar
Bariyahi & Spur to Mahishi 327E 39.183 HAM 2L 15/12/2023 Dhariwal Buildtech Limited
99 Bihar
2L PS of Majhauli to Charout section from km. 0.00 to km. 63.655 527C 63.66 EPC 2L PS 05/11/2019 Ram Kripal Singh Construction Pvt. Ltd

Construction of Service Road from Parrikala Junction to Ram


100 Chhattisgarh Darbar Temple Including Minor Bridge & Construction of Rotary
Junction at Km 337.885 on End of Durg Bypass to MH/CG Border
of NH -53 (Old NH-6) From Ch Km 322.400 to Km 405.000 53 1.625 EPC 4L 17/01/2024 Om construction

Rectification of Blackspots for 4nos. of Black Spots Locations,


101 Chhattisgarh
Construction of Mandir Hasaud Flyover and Electrical work of 04
nos at Raipur-Aurang section of NH-53 from Km. 239 to Km 282 53 0.954 EPC 4L 15/01/2024 Vishesh Infrastructure Pvt. Ltd.
Durg-Raipur Bypass Section (Package - 1) from km. 0.00 to km. SMS Ltd. in JV with Mehrotra Buildcon Pvt.
102 Chhattisgarh
44.50 (near Tendesara to near Khatti Village) 53 44.5 EPC 6L 21/07/2023 Ltd.
Durg-Raipur-Arang Package - 2 from km. 44.50 to km. 92.23 (near Kalyan Toll Infrastructure Ltd. - Shelke
103 Chhattisgarh
Khatti Village to near Aurang) 53 47.73 EPC 6L 01/06/2023 Construction (JV)
Flyover and junction development at Tatibandh chowk at km
104 Chhattisgarh
281.7 on Raipur-Aurang section of NH-53 53 3.56 EPC 2L/4L 23/12/2019 Chevrox Constructions Pvt. Ltd.
105 Chhattisgarh 4L of Bilaspur to Urga (km 0.00 to 70.2) of NH-130A 130A 70.2 HAM 4L 25/03/2022 G R Infraprojects Limited
4L of Urga - Pathalgaon from Km. 70.200 to km. 157.745 of NH-
106 Chhattisgarh
130A 130A 87.545 HAM 4L 10/02/2024 Dilip Buildcon Ltd.
Development of 6L of Jhanki – Sargi Section Road from km 0.000 Shalimar Corp Limited - APCO Infratech
107 Chhattisgarh
to km 42.800 of NH-130CD (Pkg-CG-1) 130CD 42.8 HAM 6L 29/09/2022 Private Limited (JV)
Development of 6L Sargi – Basanwahi Section from km 42.800 to Raipur-Visakhapattnam CG-2 Highways
108 Chhattisgarh
km 99.500 of NH-130CD (Pkg-CG-2) 130CD 56.7 HAM 6L 09/01/2023 Limited
Development of 6L of Basanwahi – Marangpuri Section from km
109 Chhattisgarh
99.500 to km 124.661 of NH-130-CD 130CD 25.161 HAM 6L 16/10/2023 KMV Projects Ltd.

Page 7 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Item
110 Chhattisgarh
Repair work of Indravati Bridge 30 0.413 Rate 2L 21/05/2021 B K Chawla
One Time Improvement of Junction including widening of roads Item
111 Delhi 48 1.8 8L 13/03/2024 Mahavir Prasad Gupta & Sons
near Dhaula Kuan Metro Station in the state of Delhi Rate
Development of 6L UER II [Package - I] (NH-1 Near Bakoli till
112 Delhi 344M 15.7 EPC 6L 28/10/2021 H.G. Infra Engineering Limited
Karala Kanjhawala Road) from km. 0.70 to km.15.00
Development of 6L UER II [Package - II] (Karala Kanjhawala Road
113 Delhi 344M 13.45 EPC 6L 28/10/2021 Ceigall India Ltd. - Krishna Constructions (JV)
till Nangloi - Najafgarh Road) from km. 15.00 to km.28.45
Development of 4L UER II [Package - V] (Spur to Bahadurgarh S.S. Builders JV with Diamond Construction
114 Delhi 344 N 7.3 EPC 4L 21/10/2021
Bypass) (NH-10) from km. 0.00 to km.7.30 Co.
Dwarka Expressway from Km -0.600 to Km 5.300 - Pkg-I
115 Delhi
(Shivmurti Chowk-RuB near Dwarka Sector 21) 248BB 5.9 EPC 8L 24/09/2020 J. Kumar and J. Mhatre (JV)
8L of Dwarka Expressway Pkg-II (RuB near Dwarka Sector 21-
116 Delhi
DL/HR Border) from 5.300 Km.to 9.500 Km. of NH-248BB 248BB 4.2 EPC 8L 17/10/2019 J Kumar Infra Projects Ltd.
6L Access Controlled Highway from DND Maharani Bagh - Jn. with
117 Delhi Jaitpur - Pushta Road of NH-148NA from km. 0.00 to km. 9.00 in
NCR 148NA 9 HAM 6L 11/01/2022 Dineshchandra R. Agrawal Infracon Pvt. Ltd.
Gawar Construction Ltd. - E5 Infrastructure
118 Delhi
Akshardham - DL/UP Border (Pkg-01) 709B 14.75 EPC 6L 27/06/2022 Pvt. Ltd (JV)

Construction of 4L Flyover from MES College Junction to Bogmalo


119 Goa
Junction on NH-566 from Km. 7.106 to Km. 10.460 and 4L VUP at
Queeny Nagar Junction from Km. 3.330 to Km. 4.550 566 4.171 EPC 4L 01/08/2024 M. Venkata Rao Infra Projects Pvt. Ltd.
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-26)
120 Gujarat NE-4 32.835 EPC 8L 02/05/2022 Atlas Construction Pvt. Ltd. - NKC (JV)
(Ch.696+890 to Ch.726+390)
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-27)
121 Gujarat NE-4 26.352 EPC 8L 14/02/2022 GHV (India) Pvt Ltd.
(Ch.729.700 to Ch.756.052)
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-28)
122 Gujarat NE-4 25.23 EPC 8L 16/11/2021 GHV (India) Pvt Ltd.
(Ch.756+052 to Ch.781+282)
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-30) (Ch
123 Gujarat 803+420 to Ch.824+920) [Baletiya Village - Junction near Pratap NE-4 21.5 EPC 8L 08/09/2021 Patel Infrastructure Limited
Nagar Village]
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-31)
124 Gujarat (Ch.824+920 to Ch.844+382) [Junction near Pratap nagar Village - NE-4 19.462 EPC 8L 18/05/2021 PNC Infratech Pvt. Ltd.
Junction near Dodka Village]
Vadodara Mumbai Expressway (Kim to Ankleshwar) (Phase IA -
125 Gujarat TBD 24.57 HAM 8L 01/11/2019 Sadbhav Engineering Pvt. Ltd.
Pkg V)
Vadodara Mumbai Expressway (Ena -Kim) (Phase IB - Pkg VI) [Km
126 Gujarat NE-4 36.93 HAM 8L 11/12/2021 G R Infraprojects Limited
217.500 to Km 254.430]
Vadodara Mumbai Expressway (Gandeva to Ena) (Phase IB - Pkg
127 Gujarat NE-4 27.5 HAM 8L 09/11/2021 IRB Infrastructure Developers Ltd.
VII) [Km 190.00 to Km 217.500]
Vadodara Mumbai Expressway (Talsari to Karvad) (Phase IB - Pkg
128 Gujarat NE-4 24.6 HAM 8L 22/03/2022 Roadway Solutions India Infra Ltd.
X) [Km 103.400 to Km 128.000]
Vadodara Mumbai Expressway (Karvad - Jujuwa) from Km.
129 Gujarat NE-4 26.6 EPC 8L 13/04/2024 Roadway Solutions India Infra Ltd.
128.000 to Km. 154.600 (Phase-I Package-IX)
Ahmedabad - Dholera (Pkg I) from km. 0.00 to km. 22.00) [Sardar
130 Gujarat 751 22 EPC 4L 11/01/2022 Gawar Construction Ltd
Patel Ring Road - Sindhrej Village]

Page 8 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Ahmedabad - Dholera (Pkg II) from km. 22.00 to km. 48.52)
131 Gujarat 751 26.52 EPC 4L 21/01/2022 Gawar Construction Ltd
[Sindhrej Village - Vejallka Village]
Ahmedabad - Dholera (Pkg III) from km. 48.52 to km. 71.06)
132 Gujarat 751 22.54 EPC 4L 20/07/2021 GHV (India) Pvt Ltd.
[Vejallka Village - Start of DSIR zone]
Ahmedabad - Dholera (Pkg IV) from km. 71.06 to km. 109.019)
133 Gujarat 751 37.959 EPC 4L 13/12/2021 Dineshchandra R. Agrawal Infracon Pvt. Ltd.
[Start of DSIR zone - Adhelai Village]
6L of Shamla ji to Motachilodha from km.401.200 to km. 494.410
134 Gujarat 48 93.21 HAM 6L 02/01/2019 Chetak Enterprises Pvt Limited
of Old NH-8 (Pkg-VI)
Balance work of Six Laning of Shamlaji-Motachiloda from Km.
401.200 to Km.494.410 section (Design Chainage Km.447.385 to Item
135 Gujarat 48 5.54 6L 06/08/2024 Apex Tarmac Pvt. Ltd.
Km 540.595, Length- 93.210 Km) of old NH-8 (NH-48) in the state Rate
of Gujarat on single Percentage Item Rate Contract

Long term measures for rectification of Accident Blackspots at


various locations of Ahmedabad -Vadodara section of NH-48 in
136 Gujarat 48 2.744 EPC 6L 15/04/2023 Apex Tarmac Pvt. Ltd.
the state of Gujarat on EPC Basis for Blackspots ID 1.Aslali Bypass
GJ-02-151 2.Bidaj Patiya GJ-02-219 3.Vadala Junction GJ-02-214

Construction of 2 VUPs at km 223.950 to 226.200 and one side


137 Gujarat 48 2.25 EPC 6L 16/09/2019 E5 Infrastructure Pvt. Ltd.
storage lane in Bharuch Surat Section (Stand Alone EPC Contract)
Elimination of Blackspot between Vadodara to surat section from
138 Gujarat 48 3 EPC 4L/6L 18/05/2022 Shiwalay Infra Projects Pvt Ltd
Km 108.700 to Km 263.000 of NH-48
Strengthening under one time improvement Vadodara-Surat on Item
139 Gujarat 48 42 6L 13/02/2023 Shiwalay Infra Projects Pvt Ltd
NH-48 Rate
Construction of Six Lane Flyover at the Junction of Kandari Chokdi
140 Gujarat (Ch. 149+440) and Luvara Patiya (Ch. 186+640) for Rectification of 48 2.48 EPC 6L 15/03/2024 Shiwalay Infra Projects Pvt Ltd
Blackspots on Vadodara - Surat Section of NH-8 (New NH-48)
Construction of 6L Flyover at the Jn. of Nilam Hotel Km. 261.500
141 Gujarat Chalthan Chokdi Km..263.400 and service road at Palod Km. 48 3.1 EPC 6L 09/03/2024 Apex Tarmac Pvt. Ltd.
235.600 on Vadodara-Surat Section of NH-48
Elimination of Blackspot from Km 263.000 to Km 502.000 of Surat
142 Gujarat 48 1.5 EPC 6L 22/11/2022 Avadhoot projects Pvt Ltd.
to Dahisar Section of NH-48
6L VUP at Karan (Ch.263.350) [GJ-(02)-24] and Sarodhi
143 Gujarat (Ch.330.500) [GJ-(02)-29] for Rectification of Blackspots on Surat- 48 4.15 EPC 6L 09/03/2024 Apex Tarmac Pvt. Ltd.
Dahisar Section of NH-48
Construction of (i) RUB with service road at km. 357.450
144 Gujarat (Tukwada) (ii) PUP at km. 362.864 (Chharwada) on Surat-Dahisar 48 0.81 EPC 6L 22/11/2022 Avadhoot projects Pvt Ltd.
Section of NH-48
Construction of (i) VUP at km. 334.675 (Dhamdachi) [BKS ID: GH-
(02)-84] (ii) Service Road with Box Culvert on LHS at km. 360.400
145 Gujarat (Balitha Brahmadev Temple) [BKS ID: GH-(02)-83] and (iii) VUP 48 2.1 EPC 6L 06/06/2023 Radhe Associate
with Service Road at km. 379.080 (Talvada) [BKS ID: GH-(02)-128]
on Surat-Dahisar Section of NH-48

Page 9 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Construction of (i) VUP with service road at km. 291.200 (Unn
146 Gujarat Patiya) ID-GJ-02-56 (ii) LVUP at km. 277.600 (Parthan Patiya) ID- 48 1.2 EPC 6L 02/01/2023 Apex Tarmac Pvt. Ltd.
GJ-02-164 on Surat-Dahisar Section of NH-48
Construction of Seven FoBs between Km. 307.700 and 364.000
along with RCC Crash Barrier of 600m length at km. 336.550 on
147 Gujarat 48 0.95 EPC 6L 09/03/2024 RR Constructions and Infrastructure Pvt Ltd.
Surat-Dahisar Section of NH-48 in the state of Gujarat on EPC
Mode
Bridge across Varsova Creek and approaches with interchange Vijay M. Mistry Construction Pvt. Ltd & N.G.
148 Gujarat 48 2.25 EPC 4L 08/02/2018
from Km 496.100 to Km 498.350 Projects Pvt. Ltd. (JV)
Construction of 6L flyover–VUP including RE wall, service road and
149 Gujarat Drain, Reconstruction Two Minor bridges, one HPC culvert near 27 0 EPC 6L 28/02/2022 Shree Construction
PEDHLA village on Porbandar–Jetpur of NH-27
Fixing Lighting Facility along the Highway stretch on Porbandar- Item
150 Gujarat 27 115.64 Others 20/10/2023 Metro Engineers Services
Jetpur & Bamanbore-Garamore section Rate
Widening to 6L of Existing 4L Jetpur - Gondal - Rajkot Section from Engineering Projects (India) Ltd. - Varaha
151 Gujarat 27 67.4 EPC 6L 27/09/2023
Km. 117.600 to Km. 185.00 on NH-27 Infra Limited (JV)
Strengthening of section of NH27 from Malana Patiya (Km. Item
152 Gujarat 27 2.6 4L 14/12/2023 RMPL Construction company
599.350) to Ladbi Nala (Km. 596.750) Rate
6L with PS of Samakhiyali to Santalpur section from km. 339.700
153 Gujarat 27 90.9 BOT Toll 6L 28/12/2023 IRB Infrastructure Developers Ltd.
to Km. 430.100 of NH-27
Sanchore - Santalpur from km 67.000 - km 99.000 of NH-754K (AJ- SKS Infra Projects Pvt. Ltd. - KRC Infra
154 Gujarat
RGBS-Package-3) 754K 32 EPC 6L 10/08/2021 Projects Pvt. Ltd. (JV)
Sanchore - Santalpur from km 99.000 - km 130.073 of NH-754K
155 Gujarat
(AJ-RGBS-Package-4) 754K 31.07 EPC 6L 10/03/2021 CDS Infra Projects Limited

Construction of 2 6L VUPs including RE wall, Service Road and


156 Gujarat Drain at Km. 31.050 near Budiya Village Jn. & Km. 33.580 near
Gabheni Village Jn. and Service Roads on Hazira Port - Surat -
Gujaratl Maharashtra Border section of New NH-53 53 3.72 EPC 4L 15/10/2022 Shree Manglam Buildcon
Construction of 2 6L VUPs including RE wall, Service Road and
Drain, at Ch. 24.930 near Abhava Village Jn. & Ch. 27.100 near
157 Gujarat
Khajod Village Jn. on Hazira Port - Surat - Gujarat/ Maharashtra
Border section of NH-53 53 2.4 EPC 4L 15/10/2022 Shree Manglam Buildcon

158 Gujarat Upgradation to 4L PS from Bhimasar, Junction of NH-41 to Anjar-


Bhuj upto Airport Junction from Km 0.000 to Km 65.478 of NH-341 341 59.538 HAM 4L PS 02/01/2023 G R Infraprojects Limited
Kodinar - Veraval (Package VI) from km. 221.610 to km. 263.00 of
159 Gujarat
NH-8E & km. 120.900 to km. 121.150 of NH-8D 51 41.03 HAM 4L 01/02/2018 Agroh Infrastructre & Developer Pvt. Ltd.
4L Kodinar - Veraval (Package VI) from km. 222.400 to km. 230.00 Item
160 Gujarat
(Kodinar Bypass) of NH-8E (NH 51 new) 51 7.6 Rate 4L 22/04/2022 Kalthia Engineering & Construction Ltd.
4L of Bal Works of Mahuva to Kagvadar from 100.450 Km. to Item
161 Gujarat
140.470 Km. of NH-8E (Pkg- III) 51 40.02 Rate 4L 24/03/2021 KCC Buildcon Pvt. Ltd.
4L of Bal Works of Talaja - Mahuva from 54.990 km. to 100.450 Item
162 Gujarat
km. of Old NH-8E (Package-II) 51 45.4 Rate 4L 24/03/2021 Kalthia Engineering & Construction Ltd.

163 Gujarat Repair and Re-habilitation works of Major Bridge on Sabarmati Item
River near Prantij at Km 156-900 of NH-68 in the state of Gujarat. 68 0.4 Rate 2L 12/07/2024 Sanrachana Structural Strengthening pvt.Ltd

Page 10 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

164 Gujarat 4L PS Divided Carriageway from Patan (Near Rajpur) to Gojariya WAGAD INFRAPROJECTS PVT. LTD. -
From Km 52.000 to Km 128.940 of NH-68 68 76.94 EPC 4L 09/03/2023 RACHANA INFRASTRUCTURE LIMITED (JV)
Strengthening and Maintenance of existing 2L NH-753BE starting
Gujarat, from junction with NH-753B at Taloda and connecting Shahada –
165
Maharashtra Shirpur – Chopda – Yawal - Raver upto Maharashtra / Madhya Item
Pradesh Border 753BE 232.2 Rate 2L 06/07/2023 sundar madhav construction
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-02) (Ch.
166 Haryana 18+500 to Ch. 47+000) [Expressway starting before KMP 148N 28.5 EPC 8L 13/09/2019 APCO Infratech Pvt. Ltd.
Expressway and ending at Ch. 47+000 near Khanpur Ghati]
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-03) (Ch.
167 Haryana 47+000 to Ch. 78+800) [starting near Khanpur Ghati and ending at 148N 31.88 EPC 8L 05/09/2019 Centrodorstroy India Pvt. Ltd
HR/RJ Border]
Delhi-Amritsar-Katra Expressway (Phase-I Pkg-I) from Jussur Kheri
168 Haryana on NH-KMP Expressway to Junction with Rohtak-Panipat road 709 34 HAM 4L 27/12/2021 KCC Buildcon Pvt. Ltd.
(NH-709) near Rukhi Paani village (Km 0+000 to Km 34+000)
Delhi-Amritsar-Katra Expressway (Phase-I Pkg-II) from Junction
with Rohtak-Panipat road (NH-709) near Rukhi Paani village to
169 Haryana 709 ,352A 26.8 HAM 4L 14/01/2022 CDS Infra Projects Limited
Junction with Jind-Panipat road (NH-352A) near Gangana village
(Km 34+000 to Km 60+800)
Delhi-Amritsar-Katra Expressway (Phase-I Pkg-III) from Junction
with Jind-Panipat road (NH-352A) near Gangana village to
170 Haryana 709A ,352A 30.6 HAM 4L 24/12/2021 KCC Buildcon Pvt. Ltd.
Junction with Jind-Karnal road (NH-709A) near Alewa village (Km
60+800 to Km 91+400)
Delhi-Amritsar-Katra Expressway (Phase-I Pkg-IV) from Junction
with Jind-Karnal road (NH-709A) near Alewa village to Junction
171 Haryana 709A ,152 28.85 HAM 4L 14/12/2021 NKC Projects Private Limited
with Ambala-Kaithal-Hissar road (NH-152) near Kharak Pandwa
village (Km 91+400 to Km 120+250)

Delhi-Amritsar-Katra Expressway (Phase-I Pkg-V) from Junction


with Ambala-Kaithal-Hissar road (NH-152) near Kharak Pandwa
172 Haryana 152 ,SH-10 37.67 HAM 4L 23/05/2022 CDS Infra Projects Limited
village to Junction with Patiala-Samana-Patran road (SH-10) near
Ghagga village (Km 120+250 to Km 157+920)
Construction of New Interchange from Km. 126.990 to 125.057 at
173 Haryana Junction of Eastern Peripheral Expressway and Palwal-Aligarh NE-2 1.933 EPC 6L 05/12/2022 Raja Infraconstruction Pvt. Ltd.
Road-SH22A of NE-2
Development of 4L UER II [Package - IV] (Spur to Sonipat Bypass) Ram Kumar Contractor - Bharat
174 Haryana 344P 29.6 EPC 4L 26/11/2021
from km. 0.00 to km.29.60 Construction India Pvt. Ltd. (JV)
Construction of Greenfield Connectivity to Jewar International
175 Haryana Airport from DND-Faridabad-Ballabhgarh Bypass KMP Link - Spur 148NA 31.42 HAM 6L 22/06/2023 APCO Infratech Pvt. Ltd.
to Delhi Mumbai Expressway
Construction of VUP at Km. 51.300 (Baghola) on Delhi-Agra
176 Haryana 19 1.8 EPC 6L 07/06/2023 Chaudhary Construction Company Pvt. Ltd.
section of NH-2

Page 11 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Road Safety Works including construction of Foot Over Bridge,
providing and fixing of median guard rail, pedestrian guard rail
177 Haryana 19 0.72 EPC 6L 21/02/2024 SEC Buildtech Pvt. Ltd.
and widening of existing service road on Delhi-Agra section of NH-
2.
178 Haryana 4L PS of Ambala Ring Road of New NH-44 44 22.524 HAM 4L PS 11/10/2023 Ram Kumar Contractor
Construction of VUP along with additional exit/entry ramp
179 Haryana provided due to shifted location of VUP at Shastri Colony Ambala 44 0.8 EPC 6L 01/02/2021 Welkin India Incorporate
Cantt (Km 198.300) on NH-44
Construction of LVUP near Dakoha railway crossing at Jalandhar
180 Haryana 44 0 EPC 6L 11/02/2022 Bhullar Constructions
city at Km. 370.10 including entry/exit on NH-44
Avenue Plantation/Median Plantation work in Panipat-Jalandhar NH-44 (Old Item
181 Haryana 116 6L 22/07/2022 Amrinder Singh Contractor
section of NH-01 (New NH-44) in the State of Haryana NH-1) Rate
Re-Construction of Major Bridge at Km. 160.100 LHS of NH-44
182 Haryana 44 0.4 EPC 6L 21/11/2022 Krishna Constructions.
(Panipat-Jalandhar section)
Minor Bridges on MCW & SR at Km. 115+830, FOB & Approach
183 Haryana Road etc. from Km 115+300 to 116+300 on Panipat - Jalandhar 44 1 EPC 6L 06/01/2023 Vijay Kumar Contractor
section of NH-1 (new NH-44)
Construction of LVUP Design Ch.117.920, LVUP and other related
184 Haryana works on Panipat-Jalandhar section of old NH-1 (new NH 44) from 44 1.5 EPC 6L 26/02/2024 Kisan Construction Co.
Km 96.000 to Km 387.100
185 Haryana Karnal ring road (Lot-4/Pkg-1) 44 34.5 HAM 6L 31/08/2023 H.G. Infra Engineering Limited
Dwarka Expressway Pkg-III (Delhi/HR Border to Start of RoB
186 Haryana
Gurugram) 248BB 10.2 EPC 8L 29/11/2018 Larsen & Toubro Ltd.
187 Haryana
Dwarka Expressway Pkg-IV (from Rail Over Bridge (ROB) to NH-8 248BB 8.76 EPC 8L 05/12/2018 Larsen & Toubro Ltd.
188 Haryana
Installation of highway lightning on Pb/HR Border - Jind section 352 11.05 EPC 4L 01/11/2023 Faquir Chand Sharma Electric Co.
4L of Jind-Gohana road (Package-1) from km. 0.00 to km. 40.601
189 Haryana
of NH-352 A under NH(O) 352A 40.6 HAM 4L 23/07/2020 Brij Gopal Construction Pvt. Ltd.
190 Haryana Gohana - Sonipat (PKG-2) 352A 38.24 HAM 4L 24/07/2020 Brij Gopal Construction Pvt. Ltd.
Amar infrastructure Ltd. - PS Constructions
191 Haryana
4L Ismailabad to Ambala Section of NH-152 (Lot-4/Package-1) 152 42.5 EPC 4L 07/12/2023 JV

192 Haryana Construction of 5 VUPs and service road (Km 60.300 to km 66.790
) on Delhi Haryana Border to Rohtak Section of NH-09 09 3.2 EPC 4L/6L 19/12/2022 S.S. Builders

Gap Filling and Kaner Replacement work on 4/6 laning of


193 Haryana Delhi/Haryana Border to Rohtak section of New NH-09 (Old NH-
10) from Km. 29.650 to Km. 93.140 including Bahadurgarh and Item
Rohtak Bye-Passes in the State of Haryana 09 63.49 Rate 4L/6L 19/09/2023 North East Organised floritech
Construction of service road along Rohtak Bypass near village
Bhambeva at 4/6 laning of Delhi/Haryana Border to Rohtak
194 Haryana
section of NH-10 from Km. 29.700 to Km. 87.000 including Item
Bahadurgarh 09 63.49 Rate 4L/6L 01/07/2024 Rahul Government Contractor

Page 12 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Construction of service road near Guru Jambeshwar University at
Hisar from km.178.850 to km.180.050 (LHS) and from km.179.450
195 Haryana
to km. 180.050 (RHS) on Hisar-Dabwali section of Old NH-10 (new Item
NH-09) 09 1.2 Rate 4L PS 04/05/2023 Suraj Construction Company
Construction of Vehicular Underpass (VUP) (6-Lane) 1 No on Hisar-
196 Haryana Dabwali section of old NH-10 (new NH-09) from Chainage Km.
217.900 to Km. 218.550 09 0.65 EPC 4L 01/07/2023 Himalayan Infracorp Private Limited
6L access Controlled Greenfield Highway from Adhoya
197 Haryana Musalmana to Sadopur section of Shamli -Ambala (Package-III)
(Design Ch. Form km 84.400 to km 121.786) 344GM 37.39 EPC 6L 03/05/2023 Montecarlo Limited
6L access Controlled Greenfield Highway from Ranipur Barsi to
198 Haryana Adhoya Musalmana section of Shamli -Ambala (Package-II)
(Design Ch. Form km 45.500 to km 84.400) 344GM 38.9 EPC 6L 17/05/2023 APCO Infratech Pvt. Ltd.

Construction of FOB on Km. 21+500 (Design Chainage Ch 21+500


199 Haryana PKG-1) & Km. 29+500 (Design Chainage Ch 29+500 PKG-1) on NH-
148B and Km. 17.500 (Design Chainage Ch 3+100 PKG-I1) at Km.
58+600 (Design Chainage Ch 44-200 PKG-I) on NH-11 148B/11 45.3 EPC Others 18/04/2023 Chaudhary Construction Company Pvt. Ltd.
Balance work of 4 nos. VUPs at km.396+400, km. 380.500, km.
200 Haryana 442.240 and km. 440.220 on Rohtak-Bawal section ofNH-71 (New Item
NH-352) 352 3 Rate 4L 15/03/2023 Khatkar Builders

Construction of RCC Toe Walls along the Toe line of the High
201 Haryana embankments of various structures and Cement Concrete
pavement at various locations at VUP's on 4L Rohtak-Bawal Item
Section of NH-352 (Old NH-71) from km. 363.300 to km. 446.955 352 83.655 Rate 4L 07/09/2023 G3 Infra Projects
4/6L of Gurgaon - Pataudi - Rewari from km. 0.00 to km.43.87 of
202 Haryana
NH-352W 352W 46.11 HAM 4L 24/11/2021 IRCON International Limited

Four Laning of Rohtak Jind Section from Km 307.000 to Km


203 Haryana
347.800 of NH71 and connecting link from Km 347.800 of NH71 VRC Constructions Ltd. - S&P Infrastructure
to Km 9.400 of NH71A (balance work) (left out in NHDP) 352 48.6 EPC 4L 17/08/2020 Developers Ltd.

Providing Highway Lighting Works in selected reaches of 4L UP /


204 Haryana
Haryana Border - Yamunanagar - Saha - Barwala - Panchkula Item
section of NH-07 from Km. 157.192 to Km. 176.400 07 19.2 Rate 4L PS 08/01/2024 Dhingra Brothers (India)
Special repair of Bed Protection work of Major Bridge on Ghaggar
River at Ch. 175.854 On Yamunanagar-Panchkula section of old
205 Haryana NH-73 (New NH-07) from Km. 157.192 to km. 176.400 on EPC
mode under NHDP Phase-III in the State of Haryana (Package-3) Item
(2nd Call) 07 0.15 Rate Others 16/03/2024 Welkin India Incorporate
Installation of View Cutters on Major Bridge on Ghaggar River
from km. 175.700 to km 176.008 on Yamunanagar to Panchkula
206 Haryana
(Package-3) section of Old NH-73 (New NH- 07) in State of Item
Haryana(2nd call) 07 0.308 Rate 4L 02/07/2024 Trinetra Road markers
4L (Greenfield) Jalbhera – Shahbad section from km. 0.000 to km.
207 Haryana
22.850 of NH-152G 152G 22.85 HAM 4L 02/06/2023 Ceigall India Ltd.
208 Haryana 4L Bhiwani-Hansi road section of NH-148B NH-148B 42.934 HAM 4L 17/12/2023 Gawar Construction Ltd

Page 13 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

209 Haryana Junction Improvement works at 02 locations i.e. Chirao Mod and Item
Nagla Chowk on Jind-Karnal section in the State and Haryana 709A 1 Rate 4L 03/08/2023 Welkin India Incorporate

210 Haryana Construction of Foot Over Bridge (FOB) at Ch. 2.180 near Civil Item
Hospital Ambala Cantt on Ambala - Saha section of NH-444A 444A 0.01 Rate 4L 17/11/2023 Satish Aggarwal & Co
Road Safety works on Yamunanagar-Saha-Barwala-Panchkula
Section of NH-73 from Km.70.830 to Km.115.400 – Treatment of 2
211 Haryana Nos. of Potential Blackspot locations (1) Karera Khurd,
Yamunanagar at km.78.520 and (2) Thana Chapper, Yamunanagar
at km.101.228 344 1.89 EPC 4L PS 28/02/2024 Mahender Singh Contractor

VUP on NH-05 (Zirakpur-Parwanoo section) at intersection of NH-


212 Haryana
5 with dividing road of Sector-12A and Industrial Area Phase-1
Panchkula as deposit work of Haryana Government 05 1.5 EPC 4L/6L 29/03/2023 Krishna Constructions.

2-Lane Right Turning Flyover from Sector-12A and Industrial Area


213 Haryana Phase-I to Zirakpur over old NH-22 (New NH-05) between km.
41.740 to km. 42.350 including junction improvement & widening
of at-grade HUDA road in Panchkula city 05 0.71 EPC 2L 05/09/2022 Suraj Construction Company
214 Haryana
4L Ambala - Kalaamb from Km. -0.800 to Km. 33.015 of old NH-72 344 33.815 HAM 4L 08/06/2023 DCC Infra Projects Limited
Overlay work on Ambala Kala Amb Road Section of NH-72 from Item
215 Haryana
km.26.600 to km. 45.000 72 5 Rate 2L PS 28/09/2022 Rajinder Infrastructure Private Limited
Overlay work on Ambala-Kala Amb section of NH-722 from Km Item
216 Haryana
13.750 to Km 26.600 72 12.85 Rate 2L PS 18/04/2023 Jassu Construction Company
217 Haryana
Jagadhari - Tajewala from Km (-)0.175 to 32.337 km of NH-344 907 32.512 EPC 4L 07/02/2023 Raj Shyama Constructions Pvt. Ltd.

Re-Construction of Jagadhari Poanta Sahib Road Section of NH-


218 Haryana 73A (New NH-907) from km. 5.00 to km. 6.540 RHS and carrying
out safety and other works between km. 0.000 to km. 5.000 and Item
km. 9.400 to km. 45.880 in the state of Haryana. 907 45.88 Rate 2L PS 03/10/2022 Jassu Construction Company

219 Haryana Overlay Work on Jagadhari - Paonta Sahib NH-73(A) New NH-907 Item BUDHA Group of Constructions and
from Km. 37.330 to Km. 45.880 in the State of Haryana. 907 8.55 Rate 2L 18/12/2023 properties
Rectification of 11 nos. of Blackspots on 6L Panipat-Jalandhar Item
220 Haryana, Punjab 4,444 2 6L 13/03/2023 Dhingra Brothers (India)
Section of NH-1 from KM 96.000 to 387.000 Rate
Installation of Traffic Impact Attenuators in the State of Haryana Item
221 Haryana, Punjab 44 291.1 6L 13/03/2023 Dhingra Brothers (India)
on Pilot basis. Rate
Construction / Widening of Structures i.e. Major Bridges, Minor
222 Haryana, Punjab Bridges, ROBs etc. and other works on Panipat-Jalandhar section 44 291.1 EPC 6L 05/12/2023 Ram Kumar Contractor
of NH 44 from Km. 96.000 to Km. 387.100
Haryana, Additional Structures on 6LGurgaon-Jaipur Section of NH-48 OJSC Euro-Asian Construction Corporation
223 48 15.244 EPC 6L 23/12/2022
Rajasthan between KM 42.700 to KM 273.00 (Evrascon) JV with Pawan Kumar
Haryana, Uttar Prakash Asphaltings and Toll Highways
224 Operation and Maintenance of Small Wayside Amenities at NE2 ne-2 21 EPC Others 24/12/2021
Pradesh (India) Ltd.

Page 14 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Himachal 4L of End of Pinjore Bypass - Baddi - Nalagarh section (km. 4.200
225
Pradesh to km. 35.370) of NH-21A 21A 31 EPC 4L 05/04/2022 Patel Infrastructure Limited

Conversion of Partially Excavated Escape Tunnel to Uni-


Himachal
226 Directional 2L Tunnel(including construction of cross passages and
Pradesh
approach roads on either side of the tunnel) from Km 12.732 to Gawar Kiratpur Nerchowk Highway Private
Km 14.568 of Kiratpur to Nerchowk Section of NH-21 21 1.8 EPC 2L 15/09/2022 Limited
Himachal One Time improvement from km 86 Kainchi Mod Swarghat to km Item
227
Pradesh 165.300 Jadol of Old NH-21 2,05,154 79.3 Rate 2L 31/03/2022 State PWD
Himachal Nerchowk (km 190.000) to Pandoh including Pandoh bypass (
228
Pradesh km221.305) 3 26.29 EPC 4L 14/01/2018 KMC Construction Ltd.
Himachal One time maintenance of existing road from Km 191.190 to Km Item
229
Pradesh 203.500 1,543 12.31 Rate 2L
Himachal
230 Construction of Alternate Road from Pandoh Dam to HPPWD Rest Item
Pradesh
house, Pandoh & Kenchi Mod to HPPWD Rest House 03,03 3.7 Rate 4L 04/10/2023 State PWD
Himachal One time Maintenance of existing road from Deod to Larji Power Item
231
Pradesh house 03 9.8 Rate 2L 31/03/2022 State PWD
One time maintenance of existing Road Nagwain Village(250+200
Himachal
232 to 251+450) & Existing Road Jhiri to Manikaran Chowk (253+790 Item
Pradesh
to 261+600) 03 9.06 Rate 2L 09/03/2022 State PWD
Reconstruction of damaged location between Kullu to Manali
Himachal
233 section of NH-03 from km 272.000 to km 309.345 in the state of Item
Pradesh
Himachal Pradesh 03 3.8 Rate 4L 03/11/2023 Gawar Construction Ltd
Himachal
234 Interim protection measures on NH-03 between Pandoh (km 221) Item
Pradesh
to Manali (km 309) in the state of Himachal Pradesh 03 84.945 Rate 2L/4L 02/08/2024 AV Construction
Construction of 9 Nos FOB's between Pandoh to Manali section of
Himachal
235 NH-21 ( Now NH-03) from km 221+305 to km. 309.345 under EPC
Pradesh
Mode in the state of Himachal Pradesh 03 84.945 EPC 2L/4L 16/03/2024 Vijay Kapoor
Himachal 4L Sundar Nagar Bypass from Km.173.900 to Km.179.600 of NH-
236
Pradesh 21 21 6.68 EPC 4L 15/06/2022 Kaluwala Construction Private Limited
Himachal 4L of HP/Punjab Border - Mo from km. 11.00 to km. 42.00 of Old
237
Pradesh NH-20 (New NH-154) (Package-IA) 154 28.7 HAM 4L 18/05/2022 IRB Infrastructure Developers Ltd.
Himachal 4L of Mo - Sihuni from km. 42.00 to km. 51.00 of Old NH-20 (new
238
Pradesh NH-154) (Package-IB) 154 8.33 HAM 4L 10/06/2022 Gawar Construction Ltd
Rehabilitation and Upgradation to 4L configuration &
Himachal
239 Strengthening of Sihuni to Rajol from Km 51.000 to Km 72.000 of
Pradesh
NH-154 (Package-IIA) 154 18.45 HAM 4L 27/09/2023 Gawar Construction Ltd
Rehabilitation and Up-gradation to 4L configuration & Universal Contractors and Engineers Private
Himachal
240 Strengthening of Thanpuri to Paror section from Km 85.135 to Km Limited - Shree Riddhi Siddhi Buildwell Ltd
Pradesh
100.840 of NH-154 (Pkg-IIC) 154 16.275 EPC 4L 05/03/2024 (JV)
Rehabilitation and Up-gradation of existing road to 2L PS from End
Himachal
241 of Hamirpur Bypass (near Chilbahal) to Bhangbar section from
Pradesh
Km. 138.295 to Km.175.270 of NH-88 (Pkg-IV) 88 36.975 HAM 2L PS 28/04/2023 NG Projects Ltd.
4L of Bhangbar (Near Ranital) to Kangra Bypass Section of Old NH-
Himachal
242 88 (New NH-303,503) up to Intersection with NH-154 from Km
Pradesh
175.270 to Km 193.400 (Pkg-VB) 3,03,503 18.13 HAM 4L 29/12/2022 Gawar Construction Ltd

Page 15 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Himachal 2L PS of Hamirpur Bypass from Km 121.175 to Km.138.295 of NH-
243
Pradesh 103&3 103 17.12 HAM 2L PS 30/10/2023 Jandu Construction India Pvt. Ltd.
Strengthening under One Time Improvement scheme from km.
Himachal 79.000 to 95.000 on to be bypassed section from Brahmpukhar
244
Pradesh (Km 71.00 ) to Bhager Flyover (km 97.300) section of NH-88 on Item
Shimla Mataur corridor to HP PWD 205 16 Rate 2L 15/03/2023 State PWD
Rehabilitation & Re-construction of 2-lane of Shimla-Mataur
Himachal
245 section of NH-205 from km. 18/500 to km. 18/615 at Ghandal
Pradesh
landslide location 205 0.115 EPC 2L 18/09/2023 Punia Construction Co.
Construction of Two Viaducts at km. 88/340 to km. 88/600 (0.260
Himachal
246 km) LHS and km. 103/250 to 103/400 (0.150 km) LHS at
Pradesh
Parwanoo-Solan section of NH-05 05 0.41 EPC 2L 16/01/2023 Shiva Associates
Himachal Solan - Kaithlighat Section of NH-22 Now NH-5 from Km. 106.139 Airef Engineers Pvt. Ltd. and Prakash
247
Pradesh to Km.129.05 5 22.91 EPC 4L 09/11/2018 Asphaltings& Toll Highways (I) Ltd. (JV)
Himachal 4L of Kathlighat to Shakral Village from Km 128.835 to Km SP Singla Constructions Pvt. Ltd. - Rail Vikas
248
Pradesh 146.300 of NH- 5 (Shimla Bypass - Pkg I) 5 17.465 HAM 4L 20/04/2023 Nigam Ltd. (Consortium)
4L of Shakral Village to Dhalli Section from Km 146.300 to Km
Himachal
249 156.560 (Shimla Bypass - Pkg II) and Shimla connectivity from Km Gawar Construction Ltd. - Bharat
Pradesh
0.000 to Km 0.725 of NH-5 05 10.985 HAM 4L 04/03/2024 Construction (India) (P) Ltd. (JV)
Delhi-Amritsar-Katra Expressway (Phase-II Pkg-XIV) from Junction
Jammu and with Pathankot-Gurdaspur road (NH-54) near Balsua to Junction
250 54 44.6 HAM 4L 26/09/2022 Megha Engineering and Infrastructure Ltd.
Kashmir with Hiranagar Road near village Gurha Baildaran (km 423+500 to
km 468+100)
Delhi-Amritsar-Katra Expressway (Phase-II Pkg-XV) [Junction with
Jammu and Hiranagar Road near village Gurha Baildaran to Junction with
251 44 35.15 HAM 4L 26/09/2022 Vishwa Samudra Engineering Pvt. Ltd.
Kashmir Jammu Ring Road (NH-244A) near Jakh village from Km 468+100
to Km 503+250]
4/6L Access Control Expressway from Design Chainage Km
Jammu and 515.000 to 528.300 (Kunjwani to Sidhra Section of NH-44) and APCO Maa Vaishno Expressway Private
252 144 28.92 HAM 4L 15/06/2023
Kashmir from Design Chainage Km 550.900 to Km 566.520 (Domel to Katra Limited
Section) (Phase II-Package XVII)
Delhi-Amritsar-Katra Expressway (Phase-II Pkg-XVI) Existing Jakh
Jammu and
253 (Vijaypur)-Kunjwani section of NH-44 including spur Connectivity 44 , 144A 21 HAM 4L 27/09/2022 Shivalaya Construction Co. Pvt. Ltd.
Kashmir
to Jammu Airport ( NH-144A) [Km 503+500 to km 514+500]
Delhi Amritsar Katra Expressway (Phase-II Pkg XVIII) Development
Jammu and and Upgradation of Four lane Access Control Expressway from
254 44 15.3 EPC 4L 21/11/2023 Gawar Construction Ltd
Kashmir Design Chainage KM 530.00 to KM 545.300 (Sidhra to Domel
Section of NH-44)
Jammu and 4L Ring road/bypass around Srinagar city from km 0.000 to km
255 44 41.7 EPC 4L 06/08/2021 NKC Projects Private Limited
Kashmir 42.100 (Phase-I)
Jammu and Banihal Bypass (Delinked from Srinagar - Banihal) from km. 187.00
256 1A 2.37 EPC 4L 05/01/2021 MG Contractors Pvt. Ltd.
Kashmir to km. 189.350
Jammu and Balance works of 4L of Srinagar to Banihal section from Km.
257 44 67.76 EPC 4L 24/03/2021 Gawar Construction Ltd
Kashmir 220.700 to Km. 286.110 of NH-44

Page 16 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

4L of twin tube tunnel configuration including approaches from


Jammu and Marog to Digdol (from Km.154.210 to Km.158.650 (North Bound)
258 44 4.38 EPC 4L 12/08/2022 TATA Projects Ltd.
Kashmir and from Km.155.940 to Km.160.260 (South Bound)) of Ramban
to Banihal (Pkg-I) of Old NH-1A (New NH-44)

4L twin tube tunnel including approaches from Digdol to Khuni


Jammu and Nallah (North Bound connecting with existing major bridge on NB) Ceigall India Limited-Patel Engineering
259 44 3.2 EPC 4L 01/02/2022
Kashmir and South Bound connecting with Tunnel T4 ,Single tube tunnel of Limited (JV)
Ramban to Banihal (Pkg-II) of Old NH-1A (New NH-44)
4L of Km.165.092 to Km.171.855 (North Bound) and from
Jammu and Km.166.895 to Km.173.638 (South Bound), excl. certain reaches
260 44 6.02 EPC 4L 04/02/2022 Ceigall India Ltd.
Kashmir of North Bound and South Bound of Ramban to Banihal (Pkg-III) of
Old NH-1A (New NH-44)
Jammu and Overlay of Ramban to Banihal Section From KM. 151.000 to KM. Item
261 44 36 2L 16/04/2021 Gawar Construction Ltd
Kashmir 187.000 of NH-44 Rate
Construction of 03 nos. of Wayside Amenities at Jhajjar Kotli(Km
Jammu and
262 35.00) , Qazikund (Km 205.100) & Marhama (Km 253.200) of NH- 44 0 EPC Others 15/04/2023 Kapahi Construction Company
Kashmir
44
Construction of Tunnels/Viaducts at identified sliding/slip zones at
Jammu and Km 130.550 to Km.130.750; Km. 131.170 to Km. 131.763; Km. Bharat Constructions (India) Pvt. Ltd. in JV
263 44 2.22 EPC 4L 05/04/2022
Kashmir 132.560 to Km. 133.168; Km. 133.590 to Km. 133.743 and Km. with Ram Kumar Contractors
147.877 to Km. 148.715 of Udhampur-Ramban section of NH-44

Jammu and Strengthening under one time improvement for Bypassed section Item
264 NH-44 6.4 2L 14/09/2023 New Chenab Enterprises
Kashmir from Udhampur to Ramban(Km.131.00 to Km.151.00) Rate
Rectification of Black Spots at Gole Mela and Construction of
Jammu and
265 Service Road to Existing VUP at Sangoor on Jammu Udhampur 44 1.827 EPC 2L/4L 26/07/2023 Bandh & Co.
Kashmir
Section of NH-44
2L NH-1 from km 8.660 to km 33.775 (Sumbal to Wayul) to 4L
Jammu and Rajinder Infrastructure Private Limited -
266 dual carriageway NH standard as part of Srinagar Ring Road 44 25.1 EPC 4L 26/12/2023
Kashmir Satish Aggarwal & Co. (JV)
Phase–II [Design Ch. 41.907 to Ch. 66.609]
Construction of twin tube tunnels on Jammu Kashmir Ring Road
Jammu and (NH-244A) Between Design Ch. 50+600 to 51+700 and design Ch.
267 244A 3.36 EPC 4L 08/06/2023 Bharat constructions (India) pvt. Ltd
Kashmir 53+535 to 55+700 on EPC mode under residual NHDP component
of Bharatmala Pariyojna
Corridor Efficiency Improvement including removal of black spots
Jammu and
268 in Lakhanpur - Samba section of NH-44 from Chainage Km. 16.300 44 28.485 EPC 4L 19/12/2022 Satish Aggarwal & Co
Kashmir
to Km. 74.100
Jammu and Balance work of RUB NO.173 at KM. 69+422(road 72+507) on Item
269 NH-44 0.5 4L 15/07/2021 MILLENIUM BUILDERS
Kashmir Pathankot- Jammu section NH-44 Rate
Rectification of MoRTH Identified Blackspot No. JK- 02-023 SIDCO
Jammu and
270 at KM 69.135 to KM 69.980 on NH44 by taking Longer Term NH-44 0.845 EPC 4L 06/06/2024 DMR Builders Pvt. Ltd.
Kashmir
Measures in the UT of Jammu Kashmir on EPC mode
Long Term measures to the MoRTH identified Blackspot ID JK-02-
Jammu and
271 005 at Barnoti & Additional measures to the other Blackspots on NH-44 2.544 EPC 4L 15/03/2024 DRB Infrastructure Pvt. Limited
Kashmir
NH44 in the UT of J&K on EPC Mode

Page 17 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Jammu and Upgradation and Strengthening of Chenani to Nashri Section via SRM Contractors Limited - DMR Builders
272
Kashmir Patnitop of NH244 from Km 0.000 to Km 39.100 244 39.1 EPC 2L 06/08/2024 Private Limited (JV)
Maintainance work of Jaswal Bridge-Maitra stretch of
Jammu and
273 RambanGool old Alignment (BRO road) and construction of 240 ft Item
Kashmir
span BSB at Ramban NH44 5.5 Rate MIP 02/01/2023 New Chenab Enterprises
Six Laning of Bihar - Jharkhand Border (Chordaha) - Gorhar section
274 Jharkhand 19 59.66 EPC 6L 03/06/2019 Reliance Infrastructure Ltd.
of NH-2 from km 249.525 to km 320.810
RKD Construction Pvt. Ltd. - Bharat Road
275 Jharkhand
4L of Palma to Gumla from km. 26.00 to km. 89.170 of NH-23 23 63.17 HAM 4L 01/04/2022 Network Pvt. Ltd. (JV)
Construction of ROB between Piska and Itki Railway Station in
276 Jharkhand
Ranchi at Km 14.730 of NH-23 43 1.17 EPC 4L 12/04/2023 Anand Construction

277 Jharkhand Elevated Corridor in Ranchi city from Km 0.00 to Km 3.260 of NH-
75 including down ramp on NH-23 from Km 0.100 to Km 0.600 75 & 23 3.76 EPC 2L 07/07/2022 KCC Buildcon Pvt. Ltd.
4L of Ormanjhi-Gola section from Km 81.450 to Km 53.600 of NH-
278 Jharkhand
320B(PKG-II) 320B 27.85 HAM 4L 21/06/2023 PRA Gola Ormanjhi Highway Pvt Ltd
4L of Gola-Bokaro(Jaina More) section from Km 53.600 to Km
279 Jharkhand
21.110 of NH-320(PKG-1) 320 32.49 HAM 4L 26/06/2023 NG Projects Ltd.
Balance work of Ranchi-Mahulia Section of NH-33 from Km
280 Jharkhand
113.730 (Vikas) to Km 140.000 (Rampur) (Pkg-I) 33 26.27 EPC 4L 11/06/2019 Ram Kripal Singh Construction Pvt. Ltd
4L from Km 219.600 (Khajuri) to Km 260.483 (Wyndhamganj) on
281 Jharkhand
NH-75 (Sec-V) 75 41.06 HAM 4L 15/09/2023 MG Contractors Pvt. Ltd.
4L from Km 147.450 (Bhogu) to Km 196.870 (Sankha) on NH-75
282 Jharkhand
(Sec-III) 75 49 HAM 4L 09/11/2023 Dineshchandra R. Agrawal Infracon Pvt. Ltd.
283 Jharkhand Barhi-Koderma Section of NH31 km 0.00 - km 27.5 31 27.67 EPC 4L 18/11/2019 Ram Kripal Singh Construction Pvt. Ltd
6L Grade Separator at Km 36.530 with LVUP at Km 36.894
including approaches to grade separator & LVUP from Km 35.840
284 Jharkhand
to 37.240 in Barhi-Hazaribagh section (Hazaribagh Bypass) of NH-
20 20 1.4 EPC 6L 07/07/2021 PRL Projects and Infrastructure Limited
Rectification of Blackspot (JH-02-033) by Construction of Ramps
285 Jharkhand (Slip Roads) to Kothar-Bridge from Km. 89.500 to Km. 90.000 of
NH-33 33 0.5 EPC 4L 15/05/2023 Jai Mata Dee Construction
Strengthening of Purulia (JH) - Balarampur - Chandil Section of NH-
286 Jharkhand 18 from Km, 140.280 to Km. 142.100 and Km. 143.920 to Km. Item
153.705 NH-18 11.605 Rate 2L 19/12/2023 Biswajyoti Bhattacharyya
4L of Mehgama - Hansdiha from km. 41.900 to km. 93.000 of NH -
287 Jharkhand
133A (Pkg-II) 133 51.825 HAM 4L 09/05/2023 Dilip Buildcon Ltd.
4L of NH-80 from km 215.00 to km 260.00 Mirza Chauki to Farkka
288 Jharkhand
(Pkg-I) 80 42.71 HAM 4L 31/12/2021 Ram Kripal Singh Construction Pvt. Ltd
289 Jharkhand 4L of Basukinath- Deoghar Section of NH-114A 114A 45.16 HAM 4L 12/12/2023 Gawar Construction Ltd
Dilip Buildcon Ltd. - Hindustan Construction
290 Jharkhand
4L of Sahibganj - Manihari Ganga Bridge including Manihari Bypass 133B, 131A 21.89 EPC 4L 01/11/2020 Company Ltd. (JV)
6L from Belgaum to Sankeshwar Bypass from Km. 515.000 to Km.
291 Karnataka 48 40.017 EPC 6L 25/10/2022 Ashoka Buildcon Limited
555.017 of NH-48 (Pkg-I)
6L from Sankeshwar Bypass to MH-KNT Border from Km. 555.017
292 Karnataka 48 37.836 EPC 6L 25/10/2022 S M Autade Pvt Ltd
to Km. 592.853 of NH-48 (Pkg-II)
4/6L of Bangalore - Pune Section of bypass connecting Dharwad - APS Hydro Private Limited - R&C Infra
293 Karnataka 4 30.35 EPC 4L/6L 25/03/2023
Hubli from km. 403.80 to km. 433.20 engineers Private Limited (JV)

Page 18 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

Six Laning and Strengthening of km 340+000 to km 403+400 of


Hubli-Haveri section of NH-48 (Old NH-4) in the State of Karnataka
294 Karnataka to execute on EPC (Standalone) mode –Construction of LVUP at 48 0.795 EPC 6L 09/03/2024 MD-Infra India Pvt. Ltd.
Kursapur (Km.361+900), Service road at Varur (Km.391+760) and
Structure of VOP at Chabbi (Km.392+600)

Construction of of LVUP at Kasturi Rangappana Halli at grade


junction Ch.147+500 (KA-02-044) and Giddobanahalli at grade
junction Ch.171+400( KA-02-265) Under road safety for
295 Karnataka 48 0.5 EPC 6L 24/10/2022 Paidala Thirupathi Reddy & Bros.
rectification of Blackspot in the stretch of Tumkur-Chitradurga
section from Km 75+000 to 189+000 of NH-48 (Old NH-4) in the
state of Karnataka Under EPC Mode
296 Karnataka Tumkur - Nelamangala (6L) 4 44.73 EPC 6L 25/08/2022 H.G. Infra Engineering Limited
Repair and Retrofitting Measures for Distressed Bangalore to
Item
297 Karnataka Nelamangala Viaduct in Bangalore on Bangalore-Nelamangala 48 19 6L 15/05/2023 Freyssinet Prestressed Concrete Co. Ltd
Rate
section ofNH-48 in the state of Karnataka
S&P Infrastructure Developers Pvt. Ltd. -
298 Karnataka Bangalore/TN border to Hoskote 648 21 EPC 4L/6L 15/02/2023
Skylark Infra Engineering Pvt. Ltd. (JV)
Bangalore Ring Road (STRR)-NH-948A- Package-I of Phase-III from
Montecarlo Balagondapalli Highway Private
299 Karnataka Belagondapalli (TN) to TN/KNT border from km 144.480 to 948A 35.766 HAM 4L 18/05/2023
Ltd
179.969
Construction of additional VUPs, LVUP, Foot Over Bridge and
300 Karnataka Service Road under KNT-01 project from Km. 484.800 to Km. 44 33.5 EPC 4L/6L 06/02/2020 Nikhil Infratech
518.300 of NH-44
6L Bridge on Palguni River near Kulur at Km. 368.849 (From km
301 Karnataka
368.356 to km 369.132) of NH-66 66 0.776 EPC 6L 12/04/2021 Shinde Developers Private Ltd.

302 Karnataka 4L Service road for covered drain with Footpath from Km 336.240
to Km 338.100 on Kundapur to Surathkal Section of NH-66 66 90.28 EPC 4L 10/02/2021 Hindustan Construction
Permanent rectification of Black spot KA-(02)-304 by constructing
Vehicular Overpass (VOP) with Retaining Walll Approaches at
303 Karnataka
Chainage Km. 314+092 and Service Road (Chainage Km. 313+650 -
Km. 314+720) on NH - 66 NH 66 1.07 EPC 6L 03/10/2022 The Trinity Group
Strengthening of Kundapur (Km.283.300) to Surathkal
304 Karnataka (Km358.686) and Nantoor (Km.1.900) to Talapady (Km.17.200)
(BOT) NH 66 90.08 BOT Toll 4L 19/10/2023 Udupi Tollway Pvt Ltd.
6L of MH/KN Border (Nimbal Village) to KN/TS Border (Singnodi
305 Karnataka Village) from Km. 26.000 to Km. 97.000 in Gulbarga of NH-150C
(Pkg-II) 150C 71 HAM 6L 28/12/2022 PNC Infratech Pvt. Ltd.
6L of MH/KN Border (Nimbal Village) to KN/TS Border (Singnodi
306 Karnataka Village) from Km. 97.000 to Km. 162.500 in Yadgir of NH-150C
(Pkg-III) 150-C 65.5 HAM 6L 24/04/2023 Dilip Buildcon Ltd.
6L of MH/KN Border (Nimbal Village) to KN/TS Border (Singnodi
307 Karnataka Village) from Km. 162.5 to Km. 203.100 in Raichur of NH-150C
(Pkg-IV) 150C 40.6 HAM 6L 13/11/2022 Ashoka Buildcon Limited

Page 19 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

308 Karnataka Strengthening of existing stretch of Sanquelim - Belagavi section


[km 26.130 to km 69.480] of NH-748AA in the state of Karnataka 748AA 43.35 EPC 2L 15/03/2024 M.B Kallur Infrastructure Company

4LPS Access Controlled Highway of Bellary Bypass (Balance work)


309 Karnataka from Ch. 254+750 to Ch. 266+837 and construction of 4LPS from
Ch. 277.690 to Ch. 278.690 at D. Hirehal Village (Balance work) of
NH 150A of Bellary – Byrapura Section 150A 13.087 EPC 4L 01/08/2024 SRC Infra Developers Private Limited
Challakere to Hariyur section from km 358.500 to km 414.205 of
310 Karnataka
NH-150 A 150A 55.705 HAM 4L 25/01/2021 PNC Infratech Pvt. Ltd.
Construction of LVUPs at Thambahalli village Ch. Km 250.46 and
Vadaguru Ch. Km 256.500 including Service road & drain in
311 Karnataka
Bangalore-Hoskote-Mulbagal Section from Km 237.700 to Km
318.000 of NH-4 75 4.2 EPC 4L/6L 08/01/2021 JSR Constructions (P) Ltd

Single flyover on RHS at Katamanallur @ Ch.71+885 cross under


312 Karnataka
road safety for rectification of Blackspot in Bangalore-Hoskote- Sree Bharamara Infrastructures Private
MulbagaI Section from Km 237.700 to Km 318.000 of NH-75 75 1 EPC 4L/6L 23/12/2022 Limited

Single flyover on LHS at Narsapura @ CH.4 1.774 under road


313 Karnataka
safety for rectification of black spot in Bangalore-Hoskote-
Mulbagal Section from Km 237.700 to Km 318.000 NH-4 75 1.2 EPC 4L/6L 22/08/2022 SVS Mookambika Constructions Pvt. Ltd

Single flyover on LHS at Bellur Bridge @ 45.100 and provision of


314 Karnataka VUP at Narsapira industrial Area cross @44.420 under road safety
for rectification of black spot in Bangalore -Hosket -Mulbagal
section from Km 237.700 to Km 318.000 of NH-4 75 2.2 EPC 4L/6L 22/08/2022 SVS Mookambika Constructions Pvt. Ltd
Construction of VOP at Narasimhatheertha at Km 233.300 in the
315 Karnataka stretch of Mulbagal -AP/KNT Border Section from Km 216.912 to Sree Bharamara Infrastructures Private
Km 239.100 of NH-75 75 1.1 EPC 4L/6L 23/12/2022 Limited
LVUP of Nangali cross at Km 220+770 and provision of PUP at
220+380 under road safety for rectification of blackspots in the
316 Karnataka
stretch of Mulbagal-AP/KNT Border Section of NH-75 from Km
216+912 to Km 239+100 75 1.29 EPC 4L/6L 03/06/2022 Ammapur Infrastructure Pvt. Ltd.

VUP at Tayalur cross at Km 237+080 and provision of SVUP at Km


237+370 KGF cross in the approach portion of Black spot &
317 Karnataka
construction of LVUP at Virupakshi Juction at Km 238+250 under
road safety for rectification of blackspots in the Mulbagal AP/KNT
border Section of NH-75 from Km 216.912 to Km 239.100 75 2.75 EPC 4L/6L 22/08/2022 SVS Mookambika Constructions Pvt. Ltd
VOP at Vaddahalli Juction at Km 226+715 under road safety for
318 Karnataka rectification of blackspots in the stretch of Mulbagal AP/KNT
Border from Km 216+912 Km 239+100 75 1.2 EPC 4L/6L 22/08/2022 SVS Mookambika Constructions Pvt. Ltd

Page 20 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

Construction of VUP (Talkere Hand Post-KA-(02)-057), LVUP


(Agrahara Junction- KA (02) - 273) and VUP (Tippasandra Hand
319 Karnataka
Post- KA (02) - 015) of MORT&H Identified Black Spots on
Devihalli-Hassan section of NH-75 to be executed on Engineering
Procurement and Construction (EPC) mode 75 3.123 EPC 4L 05/08/2024 Abdul Kalam Azad
320 Karnataka Strengthing of Devihalli-Hassan (DBM+BC) 75 11.32 BOT Toll 4L 19/12/2022 A. D. Construction
Construction of Light Vehicular Underpass (LVUP) at Km. 112.917
(Blackspot location Nagathihalli KA-02-269) and Construction of
FOB @ Dodderi Gate Blackspot location KA-(02)-223 with Median
321 Karnataka
grill for 4 Lanning of Devihalli-Hassan km.110.00 to Km.189.500of
NH-48 (New NH No. 75) in state of Karnataka to be executed on
EPC mode 75 0.702 EPC 4L 01/07/2024 Hindustan Construction
Hassan (km 184.912) to Maranahally (km 230.060) of NH - 75 in
322 Karnataka
Karnataka 75 45.14 EPC 4L 06/03/2017 Isolux Corsan Pvt. Ltd
4L of Addahole (Near Gundya) to Bantwal Cross section (Pkg-02)
from Design Km 270.270 to Design km 318.55 including flyover at
323 Karnataka
Kalladka Town including approaches from Km. 311.57 to Km.
313.67 of NH-75 (Old NH-48) 75 48.485 EPC 4L 23/11/2021 KNR Constructions Limited
4L of Addahole (Near Gundya) to Bantwal Cross section (Pkg-01)
324 Karnataka from Design Km 255.703 to Design Km 270.270 of NH-75 (Old NH-
48) 75 15.13 EPC 4L 01/10/2021 S M Autade Pvt Ltd
Strengthening of B.C. Road - Padil (Suratkal-Nantur)(New Item
325 Karnataka
Mangalore Port) NH 73 11.752 Rate 4L 27/03/2023 T. R Infra Project
4L of Channarayapatna Bypass and Hassan Bypass with structures Power Mech Projects Ltd. - SRC Infra
326 Karnataka
in Devihalli - Hassan section 75 39.01 EPC 4L 18/01/2021 Developers Pvt. Ltd.
Strengthening under one time improvement for the Bypassed
Sections of Bidadi, Ramanagara, Channapatna, Maddur, Mandya
327 Karnataka
and Srirangapatna city limit in Bangalore to Mysore Section of NH-
275 275 19 EPC 4L 11/12/2023 Associated Engineers

Long Term Remedial Measures at 1) Muguru (Km 251.450), 2)


328 Karnataka
Dodda Aladamara to Kumar Farm and 3) Tirumala Tower to SVP
Nagar on Kollegala-Mysore-Gundlupete Section on NH-766 766 3.1 EPC 4L/2L PS 15/10/2022 H B Ravi Kumar
4L of Left-Over Works of Hospet-Bellary -Karnataka/AP border
329 Karnataka from Km.280.080 (Dec.Ch.) to Km.375+450(Des.Ch.) of NH-63
(New-67) 67 95.37 EPC 4L 16/05/2023 SRC Infra Developers Private Limited
330 Karnataka Aurad - Bidar Km 0.00 to Km 45.878 161A 45.878 EPC 2L PS 14/09/2021 RMN Infrastructure Limited
331 Karnataka Yekkambi-Haveri 766E 74.98 EPC 2L 08/03/2022 Ammapur Infrastructure Pvt. Ltd.

332 Karnataka Belakeri Port to Kumta - Sirsi road from km 0.00 - km 4.265 of 766E & R.N.S. Infrastructure Ltd. Gayatri Projects
Belekeri Port Road Link Rd. and km 4.965 - km 60.00 of SH-69 766EE 58.92 EPC 2L PS 07/12/2020 Ltd (JV)

Page 21 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

Permanent Rectification of Blackspots by (i) Construction of VOP


at Basaveshwara Circle at Ilkal Town (ID No. KA-02- 199) at
Km.330+275 along with Slip Road from Km.329+680 to Km.
330+780 (on both sides) (ii) Construction of VOP at Metagal Cross
(ID: KA-02-430) at Km.387+930 along with Slip Road from
Km.387.500 to Km.388.460 (on both sides) (iii) Flyover at Hulgi at
333 Karnataka
Km.412+530 (iv) VUP At Hosahalli at Km.409+600 (v) LVUP at
Shahapur Cross at Km.406+040 along with Slip road from
Km.405+640 to Km.406+500 (on both sides) and SVUP at ROB
Approach at Km. 407+130 along with Service road from
Km.406+550 to Km.407+200 (on both sides) in Hungund to
Hospet Section of NH-50 in the State of Karnataka through
Engineering, Procurement & Construction (EPC) Mode 50 5.62 EPC 4L/6L 20/07/2024 S S Alur Construction Company
Construction of Foot over Bridge at Km.361+000 of NH-50 near
334 Karnataka MB Iyyanahalli village between the stretch of Hospete- Item
Chitradurga section in the state of Karnataka NH50 0.1 Rate 4L 27/03/2024 Govindaraj Contractor and Earth Movers
BRT Tiger Reserve Boundary (Km.287.500) to Bangalore Section
335 Karnataka
(Km.458.420) of NH-209 in Karnataka 948 170.92 HAM 2L/4L 21/08/2017 Gawar Bangalore Highways Private Limited
Rectification of Black spot at Ch.457.257 with ID(KA-(02)-1) near
336 Karnataka Agra – Tatguni cross of NH-209 including EOP construction at
Km.457.300 209 1.008 EPC 6L 04/03/2023 Maruthi Construction
Strengthening and One time Improvement from Km.0+000 to
337 Karnataka
Km.12+300 of Tumakuru Shivamogga section of NH-206 73 12.3 OMT 2L/4L PS 05/03/2023 Raj Promoters & Civil Engineers Pvt Ltd.

338 Karnataka Strengthening under one time improvement of Arasikere Tank


Bund section and existing stretch of Tiptur Town limits 73 6.26 HAM 4L/2L PS 24/03/2023 BMRG PROJECTS (INDIA) PVT
Strengthening and one time improvement of existing stretch of
339 Karnataka Banawara town limits & re-alignment portion of Bendekere
Village of NH-206 73 3.05 HAM 2L/4L PS 12/02/2024 Ganesh Ram Dokania
4L of Bettadahalli- Shivamogga section from Km.170.415 to km.
340 Karnataka
226.750 of NH-206 (Tumkur- Shivamogga Pkg-IV) 206 56.335 HAM 4L 20/10/2021 Ashoka Buildcon Limited
4L of Sannur to Bikarnakatte section from Km 691.350 to Km
341 Karnataka
736.362 of NH-169 Karkala - Mangalore (Package-III) 169 45.012 HAM 4L 10/10/2022 Dilip Buildcon Ltd.
Balance work of 2L PS from Km 30.800 to Km 70.800 and 2L with
342 Karnataka Rigid Carriageway from Km 70.800 to km 84.120 of Khanapur-
KA/GOA Border section of NH-4A 4A 54.12 EPC 2L PS 18/11/2022 V.M. Matere Infrastructures (India) Pvt.Ltd.
Short Term Recitification of 5 nos. of blackspots of Jewargi - Item Arjunvaishnavi Infrastructure and
343 Karnataka
Shahapur from Km. 0.000 to Km. 50.000 150A 50 Rate 2L Developers Pvt. Ltd.
Maintenance work for Repair of Bad reaches, patching of potholes
and developing earthen shoulders and otherrelated works in
344 Karnataka
selected reaches of Jevargi – Shahapur section of NH-150A from Item
Km.0+000 to Km.50+000 150A 50 Rate 2L 04/11/2022 L Kasi Reddy
Maintenance of Jevargi – Shahapur section of NH-150A for re-
345 Karnataka surfacing of balance 20.00km bad reaches in the State of Item
Karnataka 150A 50 Rate 2L 15/03/2024 KKB Engineering and Constructions Pvt. Ltd

Page 22 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
is Beautification of Median & enhancing the Safety of the road
Item Arjunvaishnavi Infrastructure & Developers
346 Kerala section from Airport Jn. (Ch.324+200) to Edappally Jn. 544 17.8 4L 12/12/2023
Rate Pvt. Ltd.
(Ch.342+000) of NH-544 in the State of Kerala.
Rectification of 11 Nos Blackspots/accident spots under Annual
347 Kerala Road Safety plan for 2023-2024 in the stretch of Walayar – 544 12.145 EPC 6L 13/03/2024 P.S.T Engineering Construction
Angamaly Section of NH-544
Item
348 Kerala NH Connectivity to ICTT Vallarpadam 966 A 17.121 4L 05/04/2024 CDR & Co. Constructions
Rate
Six Laning of KT/KL Border (Thalapaddy) -Chengala from Km.
349 Kerala
17.200 to Km. 57.20 66 39 HAM 6L 18/11/2021 ULCCS Kasaragod Expressway Private Limited

350 Kerala Megha Engineering and Infrastructure Ltd. -


6L of Chengala - Neeleshwaram from km. 56.200 to km. 93.468 66 37.27 HAM 6L 15/10/2021 Navyuga Engineering Co. Ltd. (Consortium)

351 Kerala 6L of Perole (Nileshwar town) to Taliparamba from Km 94.248 to Megha Engineering and Infrastructure Ltd. -
Km 134.650 of NH-66 66 40.11 HAM 6L 15/10/2021 Navyuga Engineering Co. Ltd. (Consortium)
6L of Taliparamba to Muzhappilangad from Km 134.650 to Km
352 Kerala
170.6 of NH-66 66 29.95 HAM 6L 29/11/2021 Vishwa Samudra Engineering Pvt. Ltd.
6L of Azhiyur-Vengalam from km. 189.200 to km. 230.400 of NH-
353 Kerala
66 66 40.8 HAM 6L 30/10/2021 Adani Enterprises Ltd.
6L Minor Bridge (Paloli Palam) at km. 203.160 & Major Bridge
354 Kerala
(Morad) at km. 204.895 and allied works 66 2.1 EPC 6L 09/12/2020 E5 Infrastructure Pvt. Ltd.
Kozhikode Bypass (Calicut Bypass) Vengalam Jn. to
355 Kerala
Ramanattukara Jn. 66 28.4 HAM 6L 22/02/2021 KMC Construction Ltd.
6L of Ramanatukkara Junction to start of Valanchery bypass
356 Kerala
section of NH-66 66 39.682 HAM 6L 21/01/2022 KNR Constructions Limited
6L of Valanchery bypass to Kappirikkad of NH – 66 from km.
357 Kerala
298+500 to km 335+850 66 37.35 HAM 6L 21/01/2022 KNR Constructions Limited
6L of Kappirikkad to Thalikulam section from km 335.85 to km
358 Kerala
369.015 of NH - 66 (old NH-17) 66 33.165 HAM 6L 01/09/2022 Shivalaya Construction Co. Pvt. Ltd.
6L of Thalikulam to Kodugallur section from km 369.015 to km
359 Kerala
397.850 of NH - 66 (old NH-17) 66 28.735 HAM 6L 17/09/2022 Shivalaya Construction Co. Pvt. Ltd.
6L of Kodugallur to Edapppally section from km 397.750 to km
360 Kerala
423.780 of NH - 66 (old NH-17) 66 26.03 HAM 6L 25/10/2022 Oriental Structural Engineers Pvt. Ltd.
361 Kerala Aroor-Thuravoor Thekku 66 13 EPC 4L 01/02/2023 Ashoka Buildcon Limited
362 Kerala Thuravoor Thekku-Paravoor 66 38.388 EPC 6L 17/03/2022 KCC Buildcon Pvt. Ltd.
363 Kerala Paravoor-Kottankulangara 66 37.5 EPC 6L 29/08/2022 SEW Infrastructure Limited
Vishwa Samudra Oachira Expressway
364 Kerala
Kottankulangara- Start of Kollam Bypass 66 31.5 HAM 6L 12/04/2022 Private Limited.
365 Kerala Start of Kollam Bypass - Kadambattukonam 66 31.25 HAM 6L 01/10/2022 Kollam Highways Private Limited
366 Kerala Kadambattukonam-Kazhakuttom 66 29.83 EPC 6L 23/07/2022 RDS Project Limited

Rectification of 4 Nos Blackspots/Accident Spots in


367 Kerala
Thiruvananthapuram Bypass section of NH-66 under Annual Road Cherian Varkey Construction Company Pvt.
Safety Plan for 2023-24 in state of Kerala on EPC Mode 66 2.42 EPC 4L 22/02/2024 Ltd.
Widening/Development of Existing NH-85 from Km 0.000 to Km
368 Kerala 124.636 section to 2L/@L+PS section in the state of Kerala on EPC
Mode under Bharatmala Pariyojana 85 124.636 EPC 2L PS 26/06/2023 EKK Infrastructure Limited

Page 23 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
6L flyover at Rau circle at from km 11.700 to Km 12.920 in 6L
369 Madhya Pradesh
Indore –Dewas Section of NH-52 52 1.22 EPC 6L 02/06/2022 Vindhya Construction Company
Additional works (2VUPs, MR-10 junction flyover and underpass)
370 Madhya Pradesh in Six lane Indore-Dewas section of NH-52 in the state of Madhya
Pradesh on EPC Mode 52 4.26 EPC 6L 18/01/2023 Mehrotra Buildcon Private Ltd.

Construction of additional 3 lane with paved shoulder (design


371 Madhya Pradesh length 8.87 km) as realignment of Bakaner ghat (between Indore
to Khalaghat Section from existing Km 59+190 to Km 66+120) of
NH 52 (Old NH 3) on EPC mode in the State of Madhya Pradesh 52 8.87 EPC 3L 09/06/2023 Kaluwala Construction Private Limited
4L of Bhawarkuan to Tejaji Nagar section from Km. 0.000 to Km.
372 Madhya Pradesh
6.500 of NH-347BG (Indore-Edlabad, Pkg-I) 347BG 6.5 EPC 4L 14/02/2022 PD AGRAWAL INFRASTRUCTURE LIMITED
373 Madhya Pradesh
Indore - Edlabad (Pkg-II) [Tejajinagar to Balwara] 347BG 33.4 HAM 4L 16/01/2023 Megha Engineering and Infrastructure Ltd.
4L of Indore - Boregaon (Pkg-III) [Balwara to Dhangaon] from km.
374 Madhya Pradesh
42.260 to km. 82.660 of NH347BG & 753L 347BG 40.4 EPC 4L 22/04/2022 GHV (India) Pvt Ltd.

375 Madhya Pradesh Overlay works with DBM and BC of Tejajinagar to Balwara Section Item
( Indore - Edlabad Package-II) from km 9.0 to Km 43.0 347BG 34 Rate 2L 25/06/2022 Mahavir Sharma
4L Boregaon Buzurg to Shahpur (Pkg I of Boregaon Buzurg to
376 Madhya Pradesh
Muktainagar) of NH 753L 753L 47 HAM 4L 15/03/2024 Kalyan Toll Infrastructure Ltd.

377 Madhya Pradesh 4L Shahpur to Muktainagar from Km. 186.000 to km 216.278 of BNA Infrastructure Pvt. Ltd. in JV with Agroh
NH 753L (Pkg II of Boregaon Buzurg to Muktainagar) 753L 30.14 HAM 4L 16/03/2024 infrastructure Developers Pvt. Ltd.
4L Greenfield Rudhi to Deshgaon (Pkg V of Betul-
378 Madhya Pradesh
Khandwa/Deshgaon) Greenfield 28.68 EPC 4L 06/10/2023 Shree Belhekar JV

(i) 4L Vidisha to Hinotiya from km 0.000 to Km 27.000 (Vidisha –


379 Madhya Pradesh
Mehulwa-Talbehat Pkg-I) Section of NH- 346 and (ii) 4L Vidisha to
Morikori from Km 39.000 to 59.476 section of NH-146 1,46,346 47.476 HAM 4L 22/12/2023 Bansal Construction Works Pvt. Ltd.
PD AGRAWAL INFRASTRUCTURE LIMITED -
380 Madhya Pradesh Prakash Asphaltings & Toll Highways (India)
Berkhedi to Godpehra on NH-44 (Sagar link road) 146 28.52 EPC 4L 04/11/2022 Ltd. (JV)
381 Madhya Pradesh
4L of Sagar - Mohari from Km.8 to Km.50 (Pkg-I) 934 42.3 EPC 4L 06/04/2022 Bansal Construction Works Pvt. Ltd.
4- Laning of Mohari to Satai Ghat section NH-934 from Km 50+300
382 Madhya Pradesh to Km 89+875 (Total length 39.575 km) (Package-2) in the State of Shree Girrajjee Infra Heights Private Limited
Madhya Pradesh on EPC Mode 34 39.575 EPC 4L 28/08/2024 in JV with Jeet Asia Private Limited
Shreeji Infrastructure India Pvt. Ltd. - PRL
383 Madhya Pradesh
Katni bypass from km. 359.50 to km. 378.50 30 20 EPC 4L 15/09/2020 Projects & Infrastructure Pvt. Ltd.
Outer Ring Road of Jabalpur Town from Manegaon to NH-45 (Pkg-
384 Madhya Pradesh
2) TBD 20.53 EPC 4L 08/03/2024 NKC Projects Private Limited
385 Madhya Pradesh
Outer Ring Road of Jabalpur Town from NH45 to Kushner (Pkg-3) TBD 36.3 EPC 4L 05/03/2024 ISC Projects Pvt. Ltd.
Velji Ratna Sorathia infra Pvt. Ltd in joint
386 Madhya Pradesh Outer Ring Road of Jabalpur Town from Kushner to Amjhar Road Venture with Vijay kumar Mishra
including Airport Connectivity (Pkg-IV) TBD 23.47 EPC 4L 06/03/2024 Construction pvt .Ltd.

Page 24 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Outer Ring Road of Jabalpur Town from Barela to Manegaon (Pkg-
387 Madhya Pradesh
1) TBD 16.15 EPC 4L 07/03/2023 Jandu Construction India Pvt. Ltd.
Indore - Harda (Pkg-I) [Indore to Raghav Garh from km. 0.25 to
388 Madhya Pradesh
km. 26.903] 47 26.653 EPC 4L 01/11/2022 PD AGRAWAL INFRASTRUCTURE LIMITED
Indore - Harda (Pkg-II) [Raghavgarh to Nanasa from km. 29.30 to Shreeji Infrastructure India Pvt. Ltd. - PRL
389 Madhya Pradesh
km. 92.30] 47 63.67 HAM 4L 15/03/2024 Projects & Infrastructure Pvt. Ltd.
Indore - Harda (Pkg-III) [Nanasa to Pidgaon Section from km
390 Madhya Pradesh
95.000 to km 142.445] 47 47.445 HAM 4L 01/10/2021 Adani Enterprises Ltd.
4L of Harda - Betul (Pkg-II) from Km. 30.00 to Km.81.00 S&P Infrastructure Developers Pvt. Ltd. -
391 Madhya Pradesh
[Temagaon to Chicholi] 47 51 EPC 4L 21/02/2023 Skylark Infra Engineering Pvt. Ltd. (JV)
Balance work of 4L of Nauradehi Sanctuary de-scoped stretch of
392 Madhya Pradesh Hiran River to Sindoor River from Km. 66.00 to 130.00 NH-12 Kanti Prasad Mittal - Shiv Build India Pvt Ltd
(New NH-45) 45 11.96 EPC 4L 19/07/2021 (JV)
4L of Chandesara to Khedakhajuriya from Km. 0.000 to (-) 750 &
393 Madhya Pradesh
Km 0.000 to km 41.400 of NH-148NG (Pkg-I) 752D 42.15 HAM 4L 28/09/2022 GHV (India) Pvt Ltd.
4L of Suhagadi to Bardiya Amra from Km. 89.200 to Km. 135.351
394 Madhya Pradesh
of NH-148NG (Pkg-III) 752D 46.151 HAM 4L 17/10/2022 MKC Infrastructure Ltd.

395 Madhya Pradesh 2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 to


Km 75.700 (Vidisha – Mehulwa-Talbehat Pkg-II) Section of NH- 346 346 48.7 EPC 2L PS 13/09/2023 SMC Infrastructures Private Limited
2L PS of Satna - Maihar Section of NH-135BG from Km 80.800 to
396 Madhya Pradesh
Km 120.125 135BG 39.33 EPC 2L PS 21/02/2022 GRTCPL-AIPL(JV)
Itarsi (Km. 63.000) to Betul (Km. 137.000) of NH-69 in Madhya
397 Madhya Pradesh
Pradesh 46 73.96 EPC 4L 22/02/2018 Longjian - Jitendra singh (JV)
4L of Ratapani stretch from Km. 8.300 to Km. 20.680 of
398 Madhya Pradesh Obedullganj - Itarsi sec on of NH – 46 (Old NH-69) in the state of
Madhya Pradesh on EPC Mode 69 12.38 EPC 4L 28/09/2022 Bansal Construction Works Pvt. Ltd.

399 Madhya Pradesh One Time Improvement of Nagjhiri to Datana with renewal of Item
existing stretch of Palkhanda and Narwar Bypass 752D 12.07 Rate 2L/4L PS 28/03/2024 State PWD
400 Madhya Pradesh
4L of Ujjain to Badnawar from km 26.900 to km 96.00 of NH-752D 752D 69.1 HAM 4L 10/10/2022 G R Infraprojects Limited
4L PS Balaghat- Gondia Section from Km. 0.00 to Km. 41.210 of
401 Madhya Pradesh
NH-543 543 41.21 EPC 4L 31/01/2024 Shiv Build India Pvt. Ltd.

Balance works of 4 lane divided carriageway of Missing Link


section of NH-39 (Rewa Bypass) from junction with NH 30 near
402 Madhya Pradesh
Bela to Junction with MPRDC ring road near Silpara on SH 9
(design length 13.100 km) on EPC Mode under Bharatmala
Pariyojana in the State of Madhya Pradesh 39 13.1 EPC 4L 24/04/2024 Udit - PRL(JV)
Strengthening and repair under One Time Improvement Scheme
of mohaniya Ghat portion from km 33/200 to km 41/700 ( length
403 Madhya Pradesh 8.5 km) & from 41/700 to km. 52/400(length 3km) and repair &
Rehabilation of Churhat Town from 52/400 to 55/400(length 3km) Item
of NH 75E 39 22.2 Rate 2L 10/06/2022 Nitin Barsainya
Madhya
Construction of 26 VUPs, Major Bridge, Service Road etc. on
404 Pradesh, Uttar 44 24.35 EPC 4L PS 06/03/2024 Dhariwal Buildtech Limited
Lalitpur-Sagar-Lakhnadon section of NH-44 (NS)
Pradesh

Page 25 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Vadodara Mumbai Expressway (Phase II - Pkg XI) [Km. 77.000 to
405 Maharashtra NE-4 26.4 HAM 8L 18/05/2022 RKC Infrabuilt Private Ltd.
Km. 103.400] (Ganjad - Talsari)
Vadodara Mumbai Expressway (Phase II - Pkg XII) [Km. 50.700 to Montecarlo Vadodara Mumbai Expressway
406 Maharashtra NE 4 26.3 HAM 8L 23/03/2022
Km. 77.000] (Masvan - Ganjad) P2P1 Private Limited
Vadodara Mumbai Expressway (Phase II - Pkg XIII) [Km. 26.582 to
407 Maharashtra NE 4 27.12 HAM 8L 08/02/2022 G R Infraprojects Limited
Km. 50.700] (Shirsad - Masvan)
Vadodara Mumbai Expressway (Phase II - Pkg XIV) [Km. 3.000 to
408 Maharashtra NE 4 17.2 HAM 8L 10/11/2022 IRCON International Limited
Km. 20.200 of Spur] (Shirsad - Akloli)
Vadodara Mumbai Expressway (Phase II - Pkg XV) [Km. 20.200 to
409 Maharashtra NE 4 18 HAM 8L 10/11/2022 Agroh Infrastructre & Developer Pvt. Ltd.
Km. 43.000 of Spur] (Akloli - Amne)
Vadodara Mumbai Expressway (Phase II - Pkg XVI) [Km. 43.000 to
410 Maharashtra NE 4 24.6 HAM 8L 01/11/2022 Shivalaya Construction Co. Pvt. Ltd.
Km. 69.800 of Spur] (Amne - Bhoj)
Vadodara Mumbai Expressway (Phase II - Pkg XVII) [Km. 69.800 to
411 Maharashtra NE 4 9.98 HAM 8L 19/01/2023 IRCON International Limited
Km. 79.783 of Spur] (Bhoj - Morbe)
Construction of VME Spur of 7.00 KM length (from Borivali KM
412 Maharashtra 38.200 to Kirawali KM 45.200) for connecting Samruddhi NE 4 7 EPC 8L 01/08/2023 MSRDC
Mahamarg of MSRDC
Design and Construction of (i) VUP with service road at Km.
382.000 (Achhad 12mx5.5m) (ii) VUP with service road at Km.
439.700 (Nandgaon 10.5m x 5.5m) (iii) VUP with service road at
Km. 441.040 (Vikramgadh 10.5m x 5.5m) & FOBs at (i) 388+800
413 Maharashtra Parsi Dhaba (ii) 401+000 Dapchari (iii) 438+800 Fanaspada (iv) 48 1.7 EPC 6L 16/05/2023 R.C. Patel
475+350 Bhavkhal (v) 475+900 Vanganpada (vi) 479+700
Shivechapada (vii) 485+800 Kolhi (viii) 495+150 Sasupada
(ix)497+350 Arvino Hotel (x) 499+350 Daras Dhaba on Surat-
Dahisar Section of NH-48
Strengthening with(i) White Topping on the existing bituminous
Carriageway & Service Road from km 381.000 to km 502.000 (ii)
VUP with service road at Delhi Darbar Km.499.150 (20mx5.5m)(iii)
414 Maharashtra NH 48 121 EPC 6L 31/10/2023 Nirmal Build Infra Pvt. Ltd.
VUP With Pandurangwadi km 501.250 (20m x4.5m) (iv)LVUP wih
service road at Sativali km 454.180 (12mx4.0m) & (v) Safety
measures on Surat Dahisar Section of NH-48

Design and construction of crossing facility of VUP at 4 locations


viz. (i) Kikvi Village (Km 801+080) (ii) Harischandri (Km 806+020)
(iii) Shivare (km 817+360) (iv) Khedshivapur (km 820+340) and
415 Maharashtra 48 3.29 EPC 4L/6L 18/12/2023 Nikhil Construction Group Private Limited
FOB at 863+200 and other miscellaneous works on Pune-Satara
Section of NH-4 from km 725.000 to 865+350 (length km 140.350)
in the State of Maharashtra on EPC Mode
Tunnel at Khambataki Ghat Section and its approaches from Crescent EPC Projects & Technical Services
416 Maharashtra 48 6.46 EPC 6L 28/02/2019
existing Km. 771.730 to existing Km. 782.000 Ltd.
6L of Kagal-Satara section from Km 592.500 to Km 658.000 of NH-
417 Maharashtra 48 61.685 EPC 6L 13/01/2023 Roadway Solutions India Infra Ltd.
48 (Pkg-I)
6L of Kagal-Satara section from Km 658.000 to Km 725.000 of NH-
418 Maharashtra 48 67 BOT Toll 6L 16/12/2022 Adani Road Transport Ltd.
48 (Pkg-II)

Page 26 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Construction of metro viaduct cum 4L Flyover (under Nagpur
419 Maharashtra Metro Rail) - Kamptee Road between Automotive Square to 53 4 EPC 4L 28/10/2019 Mahanagar Metro Rail Corporation Ltd.
Gaddigodam from km. 0.706 to km. 4.735
Ring road /Bypasses for Nagpur City, Package-2 from km 34.000 Outer Ring
420 Maharashtra 28.035 HAM 4L PS 20/01/2017 Bansal Pathways (NRR-2) Pvt. Ltd.
to km 62.035 Road
Flyover at Km.544.650 including ROB, Service Roads ,Footpath for
Gannon Dunkerley & Co. Ltd. - SMS
421 Maharashtra RCC drains on urban link to Nagpur -Raipur road (Pardi octroi 53 7.046 EPC 4L 31/03/2016
Infrastructure Ltd (JV)
Naka to Itwari)
4L of Indora Chowk to Pachpaoli and Agrasen Chowk - Ashoka
422 Maharashtra 44 8.9 EPC 4L 01/07/2023 NCC Limited
Chowk
VUP including approaches and Service Roads at Shedgaon
423 Maharashtra 44 1.335 EPC 4L 02/05/2022 Shrushti Contech Pvt. Ltd.
Junction at Km. 59.437 of NH-44
Construction of Flyover at Kalode Square at Hinganghat in
424 Maharashtra Wardha District from Km 74.745 to Km 76.020 including 44 1.275 EPC 6L 20/07/2024 Shri Sai Construction Company
approaches on Borkhed-Jam-Wadner Section of NH-44
Strengthening of Borkhedi – Wadner – Deodhari – Kelapur –
425 Maharashtra Maharashtra / Telangana Border from Km. 36.600 to Km. 175.000 NH 44 139 InvIT 4L 15/10/2023 GNI Infra JOCPL JV
Section of NH 44
Vadape to Thane from km 539.202 to km 563.000 section of NH-3
426 Maharashtra
new NH-848 848 20.71 HAM 8L 21/01/2019 MSRDC Infrastructure Projects Ltd.
6-lane VUP at Khadavali junction (Km 528.086) on Vadape - Gonde
427 Maharashtra
section 3 0.722 EPC 6L 20/01/2020 Sitaram InfraProject Pvt. Ltd.
Standalone 6L structures (04 Nos. (3 LVUPs +1 Flyover)) of Vadape
428 Maharashtra
- Gonde (km 539.5 to km 440) section of Old NH-3 160 3.3 EPC 6L 01/03/2021 Ceigall India Ltd.
Road Safety Improvement Works on Ghoti-Sinnar Section from Item
429 Maharashtra
Km. 0.00 to Km. 53.500 on NH-160A 160A 54 Rate 2L 12/04/2023 Milestone Corporation
4L bypass to Mozari town (Taluka-Tiwasa) from km. 0.000 to km.
430 Maharashtra
6.100 of NH-53 53 6.1 EPC 4L 15/06/2022 Dristti Structural Engineering Private Limited
Implementation of Road Safety Measures on Nagpur Amravati Item
431 Maharashtra
Section of NH-53 from Km. 9.200 to km 166.550 53 23 Rate 4L PS 17/07/2023 Dhingra Brothers (India)
Construction of 11 Nos of Standalone safety structures/works at
432 Maharashtra
different locations on various NHs 53,361 30.6 EPC 4L 05/07/2024 Shri Swami Samarth Engineers Ltd.
Rectification of Blackspot of 6 L flyover at km 518.440 (Mouda T-
433 Maharashtra Junction) on Nagpur - Wainganga Bridge Section from km 517.655
to km 519.100 53 1.445 EPC 6L 04/01/2024 Shri Swami Samarth Engineers Ltd.

434 Maharashtra 6L of Wainganga Bridge - Bhandara (including Bhandara Bypass)


section from km 485.000 to km 499.800 of NH-53 (old NH-6) 53 14.8 EPC 6L 06/04/2022 Shri Swami Samarth Engineers Ltd.
4L Mitigation Measure structures on CH/MH Border to Agrawal Global Infratech Pvt Ltd - SMS
435 Maharashtra
Wainganga Bridge Section of NH-6 (New NH-53) 53 10.995 EPC 4L 08/11/2021 Limited (JV)
6L of Saundard ROB on Raipur Nagpur (from 441.970 km to
436 Maharashtra
443.560 km) 53 1.6 EPC 6L 04/12/2018 Rajdeep Buildcon Pvt. Ltd.
Balance work of 4L Panvel to Indapur section of NH-66 (Old NH-
437 Maharashtra
17) from km 0.000 (Panvel) to km 42.300 (Kasu) 66 42.3 EPC 4L 29/03/2023 J.M. Mhatre infra Pvt. Ltd.
Balance works of 4L Panvel - Indapur section of NH-66 (old NH-17)
438 Maharashtra
from km 42.300 (kasu) to km 84.600 (Indapur) 66 42.3 EPC 4L 18/11/2022 Kalyan Toll Infrastructure Ltd.
439 Maharashtra
Short Term Improvement Standalone VUP at Purmepada of NH-03 03 1.3 EPC 6L 20/04/2023 S B Deshmukh

Page 27 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Strengthening of 6-lane Pimpalgaon-Nashik-Gonde (Km. 380 - Km.
440) section of NH-3 in Maharashtra using Thin White Topping
440 Maharashtra
(TWT) and BC Overlay on Service Road & Viaduct/ Deck of
Structures on EPC mode 03 60 EPC 6L 14/06/2024 Raj Infrastructure Development (I) Pvt. Ltd.
Construction of (a) VUP (20mx5.5m) at Km. 47.920 (b) VUP
(20mx5.5m) at km 126.735 (c) VOP ((14m+14m)x5.5m) at Km.
441 Maharashtra 135.675 and (d) VUP ((12m+20m+12m)x5.5m) at Km. 142.735 on
Pune Solapur (Km. 40+000 to Km. 150+050) (PKG-I) section of NH-
65 65 3.76 EPC 6L 16/05/2023 N P Infraprojects Pvt Ltd.
Construction of LVUPs at Km 153.600 at Adhegaon Junction & at
km 217.565 at Mohol Junction on NH-65 & four laning of
Tembhurni town portion from Old Ch. Km. 153+050 to Km
442 Maharashtra
159+280 (Not a part of NH-65) with Design Length = 6.230 Km in
Pune-Solapur section of NH-09 (New NH 65) in the state of
Maharashtra on EPC mode 6.23 EPC 4L 12/04/2022 AK Shivhare Infrastructure Pvt. Ltd.

443 Maharashtra 4L of existing 2/4L stretch from Lonand to Dive Ghat (Km 166.400 Thakur Infraprojects Pvt. Ltd. - T & T Infra
to Km 220.900 ) of Mohol – Alandi section of NH-965 (Pkg - V) 965 54.5 EPC 4L 02/05/2022 Limited (JV)
Dharampuri-Lonand from km. 117.00 to 166.40 (Pkg-IV) on Mohol- Vijay Nirman Company Pvt Ltd - RK Chavan
444 Maharashtra
Alandi Section 965 49.4 EPC 4L 14/09/2021 Infrastructure Pvt. Ltd. (JV)
Strengthening of Existing Alignment of Pandharpur Town (Part
445 Maharashtra Bypassed Section of NH 965 from KM 36.230 to KM 44.230) from
Chh. Shivaji Maharaj Chowk to Wakhari 965 8 EPC 4L PS 01/11/2023 AK Shivhare Infrastructure Pvt. Ltd.
Bal. Works of Fagne (Km. 510.000) to Maharashtra/Gujarat
446 Maharashtra
Border (Km. 650.794) 53 140.79 EPC 4L 18/09/2020 J.M. Mhatre infra Pvt. Ltd.
Sharda Construction & Corporation Private
447 Maharashtra
Balance works of Tuljapur-Ausa Section of NH-361. 361 1.28 EPC 4L PS 19/06/2024 Limited
448 Maharashtra
4 laning of Waranga - Mahagaon from km 253.700 - km 320.580 361 66.88 HAM 4L 21/05/2018 Gawar Waranga Highways Pvt Ltd.
Strengthening under one time improvement of existing
carriageway in Deoli Town with white topping [Length - 3.200
449 Maharashtra
Km.] on Yavatmal - Wardha Section of NH-361 in the State of
Maharashtra on EPC Mode. NH 361 3.2 EPC 2L 01/02/2024 Sunrise Constructions

Balance Works (i) Pedestrian Underpass at Km .514+960 including


approaches & both side service road , (ii) Bus lay bay & bus
450 Maharashtra
shelter, (iii) Drain from Km.514.660 to Km.515.087 on both sides
and (iv) Junction at Km .514.960 on 4-laned Wardha - Butibori
section of NH-361 (Km.465-:-500 to Km .524.690 361 0.6 EPC 4L 10/01/2024 PHOENIX Engineering
Construction/widening of service road and installation of street
451 Maharashtra
lights on Solapur-Yedeshi section of NH-52. 52 9 EPC 2L/4L PS 01/07/2024 D.C Ajmera
452 Maharashtra Bodhre - Dhule 211 67 HAM 4L 29/01/2022 Kalthia Engineering & Construction Ltd.
Balance work under Phase-II for 4L of Khed Sinner Section
comprising of (i) Kalamb bypass (km 68.576 to km 72.390), (ii)
453 Maharashtra
Linear length of Bhatkalwadi (km 89.550 to km 90.400) and
Alephata bypass (km 92.030 to km 96.000) 60 8.634 EPC 4L 29/12/2020 V.M. Matere Infrastructures (India) Pvt.Ltd.

Page 28 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Design and Construction of Standalone 4- lane Vehicular
Underpass with approaches at Sangamner bypass end Junction
454 Maharashtra
(Km.150.200) and Wavi Junction (Km.163.900) on Khed Sinnar
Section of NH-60 (Old NH-50) 60 2.4 EPC 6L 22/05/2023 Yewale Constructions Company
Construction of VUP with approaches at Khodad Junction
455 Maharashtra (Km.78.600) and Ambikhalsa Junction (Km.113.150) on Khed
Sinnar Section of NH-60 (Old NH-50) 60 2.1 EPC 6L 10/10/2023 New India structures private limited
Design & Construction using Thin White Topping (TWT) including
routine maintenance & balance works from Km. 42.000 to
456 Maharashtra
Km.179.946 (Total Length-137.946 Km) in the State of
Maharashtra as Standalone project on EPC Mode 60 137.94 EPC 4L/6L 10/06/2024 Shankar Ramchandra Earthmovers Pvt.Ltd.
4L PS from existing km 88.400 (Savali Vihir) to km 163.400 (start Rudranee Infrastructure Ltd. - Manisha
457 Maharashtra
of Ahmednagar bypass) section of NH-160 160 75 EPC 4L PS 05/06/2023 Construction Co. (JV)

OJSC Euro-Asian Construction Corporation


458 Maharashtra (EVRASCON) - V.P. Sethi Constructions -
Courage Infra Pvt. Ltd. (Formerly known as
4L of Aurangabad-Paithan 752E 44.217 EPC 4L 24/01/2023 B.M. Danve Patil) (JV)

Construction of works in the state of Maharashtra on EPC mode;


A) ROB at km 377+800 along with approaches at Bhaiya Chowk
Junction & Service Road from Ch. 365+740 to Ch. 366+580 (BHS)
on Sangli - Solapur section of NH-166, VUP at Ch. 210.592
(Yawali) including SVUP at Ch. 211.139 on Pune Solapur Pkg-II
459 Maharashtra
section of NH-65, C) VUP at Ch. 36+580 along with street light
work on Solapur-Yedshi section of NH-52., D) Service Road from
Ch- 129+440 to 129+990 RHS, Ch. 129+750 to 129+990 LHS, Ch.
135+650 to 136+100 BHS, Ch. 101+750 to 102+050 BHS, Ch.
104+200 to 104+780 RHS & Widening of Box culvert at Ch.
104+759 on Akkalkot - Solapur section of NH-150 (E) NH-166 3.47 EPC 4L/6L 14/03/2024 PRL Projects and Infrastructure Limited

460 Maharashtra Strengthening under One time improvement (DBM +BC) of 4L


Miraj- Solapur Section from Km189.300 to Km200.100 of NH-166 166 10.8 EPC 4L/2L PS 01/04/2022 NIRMAN CONSTRUCTIONS
4L of Ratnagiri - Kolhapur section of NH-166 from km 0.000 to km
461 Maharashtra
19.769 and km 31.000 to km 67.140 (Pkg – I) 166 55.909 HAM 4L 22/11/2022 Ravi Infrabuild Projects Private Limited
4L of Ratnagiri - Kolhapur section from km 67.140 to km 112.340 J M Mhatre Infra Pvt Ltd - Thakur
462 Maharashtra
of NH-166 (Pkg – II) 166 45.2 HAM 4L 26/05/2023 Infraprojects Pvt. Ltd. (JV)
4L of Ratnagiri - Kolhapur section from km 112.340 to km 145.300
463 Maharashtra
of NH-166 (Pkg–III) 166 32.96 HAM 4L 26/05/2023 Megha Engineering and Infrastructure Ltd.
Maintenance of 2L PS of Ratnagiri - Kolhapur Section from 0.000
464 Maharashtra
to Km 137.285 of NH-166 166 126.054 OMT 2L PS 09/06/2022 MD-Infra India Pvt. Ltd.
4L of Nagpur-Katol Section from Km. 13.00 to Km. 62.900 of NH- Joint Stock Company Industrial Association
465 Maharashtra
353J 353J 49 EPC 4L 29/10/2021 Vozrozhdenie
Additional safety/one time improvement works (Package- V)
466 Maharashtra under O&M head in various projects in Maharashatra under Agrawal Global Infratech Pvt Ltd - SMS
NH(O) on EPC basis 353J 10.9 EPC 4L/6L 20/07/2024 Limited (JV)

Page 29 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
White toping along with reconstruction of 20no. of culverts of 2
Lane paved Shoulder of NH-61 (NH-222) from Malshej Ghat to
Ane Ghat (101/000 to 161/570 PKG-I) from Ane Ghat to
467 Maharashtra
Ahmednagar Bypass (161/570 to 211/000 PKG-II) & from
Kharwandi Kasar to Junction of NH-211 (284/000 to Km 337/000
PKG-III) 61 163 EPC 2L PS 28/06/2024 T&T Infra Pvt. Ltd.
4L of Baramati to Indapur (Pkg-II) from km. 41.400 to km. 84.550 Vijay Nirman Company Pvt Ltd - RK Chavan
468 Maharashtra
of NH-965G (Saint Tukaram Marg) 965G 48.5 EPC 4L 09/09/2021 Infrastructure Pvt. Ltd. (JV)
4L of Rajura-Korpana-Adilabad Road upto M.S. Border from km
469 Maharashtra
32.910 to km 89.090 of NH-353B 353B 56.18 HAM 4L 17/10/2022 G R Infraprojects Limited
4L of Indapur to Tondle (Pkg-III) from km.84.550 to km. 131.00 of
470 Maharashtra
NH-965G (Saint Tukaram Marg) 965G 47 EPC 4L 07/09/2021 GHV (India) Pvt Ltd.
4L of Bamni - Rajura - Warur - Devada upto M.S. Border of NH -
471 Maharashtra
930D (from km 19.000 to km 52.425) 930D 32.985 HAM 4L 28/03/2024 GR Infra Projects Ltd
Karnala Jn of Navi Mumbai International Airport Interchange on
472 Maharashtra
east side (NH -4B D-G Section) 4B 4.614 EPC 6L/8L 15/02/2024 TPF engineering Pvt. Ltd.
Navi Mumbai International Airport Interchange on West side
473 Maharashtra
(Amra Marg/NH-348A) 348 A 3.49 EPC 6L/8L 15/02/2024 TPF engineering Pvt. Ltd.
474 Odisha Bhadrak (KM 136.500) to Baleshwar (KM 199.141) 16 62.64 HAM 6L 20/03/2019 Brij Gopal Construction Pvt. Ltd.
Construction of Underpass at Km.116+670 along with approaches M S Infraengineers Pvt Ltd Nuapada Chhaka,
475 Odisha from Km.116+330 to Km.117+030 on Chandikhole-Bhadrak 16 0.7 EPC 6L 13/03/2023 Madhupatana, Khapuria,Cuttaka -753010
section of NH-5 (New NH-16) ,Odisha
Construction of Underpass at Km.80.450 along with approaches M S Infraengineers Pvt Ltd Nuapada Chhaka,
476 Odisha from Km.80.280 to Km.80.750 on Chandikhole-Bhadrak section of 16 0.47 EPC 6L 13/03/2023 Madhupatana, Khapuria,Cuttaka -753010
NH-5 (New NH-16) ,Odisha
Construction of FOB at Km. 118+900 in front of District Judge
Court, Nalanga on Chandikhole-Bhadrak section of NH-5 (New NH-
477 Odisha 16 0.005 EPC 6L 02/06/2024 Maa Durga Associates
16) in the state of Odisha on Engineering Procurement and
Construction (EPC) Mode.
Construction of 2 No. of FOBs at Km. 1+300 (Satsang Vihar) & at
478 Odisha Km. 417+350 (Nayapalli) on Chandikhole-Jagatpur-Bhubaneswar 16 2 EPC 6L 05/06/2023 Dhingra Brothers (India)
Section of NH-16
Construction of Foot Over Bridge (FOB) near DN Regalia at
479 Odisha Km.408+360 on Tangi Bhubaneswar Section of NH-16 in the state 16 1 EPC 4L/6L 18/12/2023 Dhingra Brothers (India)
of Odisha

Construction of RCC wall/drain from Km.1.932 to 1.992 (60mtr)


480 Odisha
on RHS (near Greater Sambalpur, Bareipali) & other activities in Item Abhipsa Construction, Engineer and
Sambalpur Bargarh - Orissa I Chhattisgarh Border Section of NH·06 NH-53 0.06 Rate Others 17/03/2023 Contractors
Construction of 6-lane flyover at Ainthapali junction and a 2-lane
481 Odisha ROB (LHS) on NH-53 (Earlier NH-6) in Sambalpur, on EPC mode in
Odisha under NH(O) 53 3.44 EPC 6L 18/06/2024 ASC Infratech Pvt. Ltd.
Strengthening with DBM+BC and one time improvement of
existing highway of Jamankira bypass from Km.514+110 to
482 Odisha
Km.517+540 of Teleibani - Sambalpur section of NH-06 (New NH- Item
53) in the State of Odisha NH-53 3.43 Rate 2L 10/06/2023 Ashok kumar Jalan

Page 30 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

Strengthening with DBM+BC and repair and rehabilitation of 10


483 Odisha
nos bridges in Teleibani Sambalpur Section of NH-53 from Item
Km.518.900 to Km.545.176 (Badarma Wildlife Sanctuary Area) NH-53 26.276 Rate 2L 15/04/2024 V. M and CO
Construction of FOB at Manada (Bangriposi) at Km.225.600 on
484 Odisha
Baharagora-Singhara section of NH-49 49 0.001 EPC Others 04/03/2023 Dhingra Brothers (India)

Strengthening with DBM+BC and Curve improvement in


485 Odisha
Bangriposi Ghat Section (Dwarasuni Ghat) between Km.228.620 Item
to Km.237.500 in Baharagora-Singhara Section of NH-49 49 8.88 Rate 2L 22/02/2023 Jai Mata Dee Construction
Installation of Sign Boards and New Jersey Crash Barrier at
486 Odisha Bangriposi Ghat Section (Dwarsasuni Ghat) from Km.230+000 to Item
Km.239+000 of NH-49 49 9 Rate 2L 24/02/2023 Dhingra Brothers (India)
6L of Dhanara - Hatibena Section from Km 124.611 to km 146.50
487 Odisha
of NH-130-CD (Package – OD-1) 130 CD 21.839 HAM 6L 25/03/2022 NKC Projects Private Limited
6L of Hatibena - Badakumari Section from Km 146.50 to km PRA Hatibena Badakumari Expressway
488 Odisha
179.00 of NH-130-CD (Package – OD-2) 130 CD 32.5 HAM 6L 04/03/2022 Private Limited
6L of Badakumari - Karki Section from Km 179.000 to km 226.500
489 Odisha
of NH-130-CD (Package – OD-3) 130 CD 47.5 HAM 6L 13/04/2022 Adani Road Transport Ltd.
6L of Karki – Kaliagura Section from Km 226.500 to km 249.000 of
490 Odisha
NH-130-CD (Package – OD-4) 130 CD 22.5 HAM 6L 25/03/2022 NKC Projects Private Limited
6L Greenfield Kaliagura – Baunsaguar Section of NH-130-CD Road
491 Odisha
from km 249+000 to km 293+000 (Package – OD-5) 130CD 44 HAM 6L 30/05/2022 H.G. Infra Engineering Limited
6L Greenfield Baunsaguar - Baraja Section of NH-130-CD Road
492 Odisha
from km 293+000 to km 338+500 (Package – OD-6) 130CD 45.5 HAM 6L 01/06/2022 H.G. Infra Engineering Limited
6L Greenfield Baraja - Kandili Section of NH- 130-CD Road from
493 Odisha
km 338+500 to km 342+500 (Package-OD-7) 130CD 4 HAM 6L 30/09/2022 Dineshchandra R. Agrawal Infracon Pvt. Ltd.
6L Greenfield Kandili - Aluru Section of NH-130-CD Road from km Max Infra (I) Limited - Bekem Infra Projects
494 Odisha
342+500 to km 365+033 (Package-OD-8) 130CD 22.533 HAM 6L 17/10/2022 Pvt. Ltd. (Consortium)
Four Laning of Angul to Sambalpur from Km.112.000 to
495 Odisha
Km.265.000 55 150.86 EPC 4L 03/03/2017 Gayatri-PTPS (JV)
6L Flyover including RE Wall approaches with Flexible Pavement in
496 Odisha the Elephant Corridor of Angul – Sambalpur Section of NH-42
(New NH-55) Km.202.533 42 2 EPC 6L 21/06/2024 Agrawal Infrabuild Private Limited
Construction of 6 lane PUP including RE Wall approaches at Km.
497 Odisha 152.590 in Luhamunda Village of Angul Sambalpur section of NH
55 55 1.22 EPC 6L 31/08/2023 Agrawal Infrabuild Private Limited

One time improvement existing road (bypassed portion) of NH-55,


498 Odisha Passing through sambalpur town i.e. Naxapali- Dhanupali Chowk-
Sindurpank Chowk (from Km. 0+000 to Km. 6+800)Angul-
Sambalpur section of NH-55 in state of Odisha NH-55 6.8 EPC 2L 01/04/2024 Enfive Systems Private Limited
Cuttack-Angul Section of NH-42 (New NH-55) from km 0.400 to
499 Odisha
km 60.200 (Pkg-I) in the State of Odisha 55 59.8 EPC 4L PS 19/01/2018 Gayatri Projects Limited
Cuttack-Angul Section of NH-42 (New NH-55) from Km.60.200 to
500 Odisha
Km. 112.000 (Pkg-II) in the State of Odisha 55 51.8 EPC 4L PS 12/03/2018 Gayatri Projects Limited

Page 31 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Construction of 02 nos. of VUPs at Km. 2.300 (Near Gandhi Chhak)
501 Odisha and Km. 4.720 (Dhumabati) on Cuttack-Angul section of NH-42
(New NH-55) (Km.00.400 to Km.60.200) 55 1.621 EPC 6L 05/12/2023 B.B. Verma Engineers & Contractors
Strengthening with One time improvement along with electrical
502 Odisha work in Angul city from Km.92.000 to Km.111.800 in Cuttack- Item M/s. C.P. Arora Engineers and Contractors
Angul section of NH-42 (New NH-55) Pkg-II 55 19.8 Rate 2L 29/01/2024 Pvt Ltd.
Shifting of 400 KV Meramundali- JSPL D/C Transmission line at 3
nos location (i.e. Km 92.570, Km 94.860 & Km 96.800) in Cuttack-
503 Odisha
Angul section of NH-42 (New NH-55) from Km.60.200 to Item
Km.112.00 Pkg-2. 55 4.23 Rate 2L 23/03/2024 M K Group
Construction of VUPs at Km. 11.300 (Kalabadia Chowk) and Km.
504 Odisha 14.280 (Kuliana village) in Jharpokharia - Baripada - Baleshwar
Section of Old NH-5 (New NH- 18) 18 1.39 EPC 4L 06/10/2020 E5 Infrastructure Pvt. Ltd.

Installation of signboards on the National Highway at Elephant


505 Odisha
Crossing Points on Jharpokharia –Baripada-Balasore section of NH- Item
5 (New NH-18) from Km.0.00 to 80.600 in the state of Odisha 18 81.257 Rate 4L PS 05/01/2022 Sanjay Kumar Agrawalla
Balance work of Panikoili Rimoli Section of new NH-20 from Km Item
506 Odisha
0.00 to Km. 163.000 20 21.05 Rate 4L 12/03/2021 ARSS - SCPL (JV)
Construction of Underpass at Km.06+853 along with approaches
507 Odisha from Km.06+205 to Km.07+495 on Panikoili-Rimuli Section of NH-
215 (New NH-20) 20 1.29 EPC 4L 25/03/2023 Shivam Condev Pvt Ltd.
Construction of Underpass at Km. 100.880 along with approaches
508 Odisha from Km.100.370 to Km.101.260 on Panikoili-Rimuli Section of NH-
215(New-NH-20) 20 0.89 EPC 4L 02/05/2023 Durga Condev Pvt Ltd.
Construction of Underpass at Km.89.155 (at Langalkanti) along
509 Odisha with approaches from km. 88.690 to Km. 89.470 on Panikoili-
Rimuli Section of NH-215 (New NH-20) 20 0.78 EPC 4L 22/12/2023 JBCO Infratech Private Limited
Construction of Underpass at Km.38.380 (at Salapada) along with
510 Odisha approaches from km. 37.920 to Km. 38.772 on Panlkoili- Rimuli
Section of NH·215 (New NH·20) 20 0.852 EPC 4L 22/12/2023 JBCO Infratech Private Limited
Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole
511 Odisha – Paradip Section of NH-53 (Old NH – 5A) from Km.39.000 to
Km.60.00 (Package-3) 53 21 HAM 8L 15/12/2023 Rajbir Construction Private Limited

Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole


512 Odisha
– Paradip Section of NH-53 (Old NH – 5A) from Km 18.00 to Km PSK Infrastructures and Projects Private
39.00 in the State of Odisha on HAM mode (Package-2) 53 21 HAM 8L 15/12/2023 Limited
Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole
513 Odisha – Paradip Section of NH-53 (Old NH – 5A) from Km.0.00 to
Km.18.00(Package-1) 53 18 HAM 8L 15/12/2023 Agrawal Infrabuild Private Limited
4 Laning of Talcher to end of Kamakhyanagar Bypass km 8.844 -
514 Odisha km 15.725 of NH-149 and km 301.875 - km 335.946 of NH-53 (Pkg-
I) 53 & 149 41.73 EPC 4L 21/02/2019 MonteCarlo Ltd. - Iron Triangle Ltd. (JV)
Construction of LVUP at Baisingha (Km.339+360) in the stretch of
515 Odisha End of Kamakhyanagar bypass to Duburi section of NH-53 in the
state of Odisha 53 0.8 EPC 4L 07/04/2023 Kumar Piyush Construction Private Limited

Page 32 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

516 Odisha 4 Laning of Duburi Chandikhole from km 388.376 to km 428.074 Gammon Engineers and Contractors Pvt Ltd.
(Pkg-III) 53 39.7 EPC 4L PS 11/02/2020 JV with Gammon Infrastructure Projects Ltd.
3L Major Bridge over River Brahmani at Km. 401.250 (Duburi - M.S. Infraengineers Pvt. Ltd.- Unique
517 Odisha
Chandikhole Section) of NH-200 (New NH -53) 53 1.247 EPC 3L 02/08/2022 Construction (JV)

Construction of 6L VUP at Km. 245.900 including approaches


518 Odisha
between Km. 245.545 to Km. 246.330 and FOB at Km. 246.760 on
Brahamani Bypass - Rajamunda Section of NH-143 143 0.785 EPC 4L/6L 20/01/2022 Vijay Kumar Sahu Infrastructure Pvt . Ltd.
4-L of Rajamunda to Barkote Section of NH-23 from km. 287.200
519 Odisha
to km. 337.185 143 49.99 EPC 4L PS 17/12/2018 Gayatri Projects Limited

Bed Protection works to a thickness of 750 mm with Self


Compacting Concrete (SCC) of average size of 330 m×80 m with
520 Odisha
curtain walls from km. 172+895 to Km.173+670 at 6-Lane Major
Bridge Over Kanupur Spillway channel in Rimuli- Koida Section of Item
NH-215(New NH -520) in the state of Odisha. NH 520 0.775 Rate 6L 05/06/2024 Barbrik Project Limited
Construction of Light Vehicular Underpass (4x12) at
521 Odisha Birabhadrapur at Km. 51+500 on Bhubaneswar-Puri Section of NH-
316 in the State of Odisha. 316 0.613 EPC 4L 08/06/2024 Gee Tech Foundation
Delhi-Amritsar-Katra Expressway (Phase-I Pkg-VII) from Junction
with Patiala-Bathinda road (NH-7) near Bhawanigarh to Junction
522 Punjab 7 ,SH-11 36.94 EPC 4L 11/07/2022 Ceigall India Ltd.
with Ludhiana-Malerhkotla (SH-11) near Bhogiwal village (Km
188+830 to km 225+770)
Delhi-Amritsar-Katra Expressway (Phase-I Pkg-VIII) from Junction
with Ludhiana-Malerkotla (SH-11) near Bhogiwal village to OJSC Euro-Asian Construction Corporation
523 Punjab 5 , SH-11 35.09 EPC 4L 15/03/2023
Junction with Ludhiana-Moga road (NH-5) near Mullanpur Dakha Evrascon - MKC Infrastructure Ltd. (JV)
(Km 225+770 to km 260+860)
Delhi-Amritsar-Katra Expressway (Phase-I Pkg-IX) from Junction
with Ludhiana-Moga road (NH-5) near Mullanpur Dakha to OJSC Euro-Asian Construction Corporation
524 Punjab 5 43.04 EPC 4L 18/07/2022
Junction with Jalandhar - Moga road (NH-703) near Kang Sahibu Evrascon - MKC Infrastructure Ltd. (JV)
village (Km 260+860 to km 303+900)
Delhi-Amritsar-Katra Expressway (Phase-I Pkg-X) from Jn. with
Jalandhar - Moga road (NH-703) to Jn. with Jalandhar-Kapurthala OJSC Euro-Asian Construction Corporation
525 Punjab 3 39.5 EPC 4L 11/07/2022
road (NH-703A) and to Jn. with Kapurthala - Sultanpur Lodhi road Evrascon - MKC Infrastructure Ltd. (JV)
(NH-703A) (km 0+00 to km 24+000 to Amritsar connectivity)

Delhi-Amritsar-Katra Expressway (Phase-I Pkg-XI) from Junction


with Jalandhar - Kapurthala road (NH-703A) near khojewal village OJSC Euro-Asian Construction Corporation
526 Punjab 3 , 503A 43.02 EPC 4L 15/11/2022
to Junction with Amritsar-Mehta-SriHargobindpur-Tanda road Evrascon - MKC Infrastructure Ltd. (JV)
(NH-503A) near SriHargobindpur (Km 319+400 to km 362+420)

Delhi-Amritsar-Katra Expressway (Phase-I Pkg-XII) from Junction


with Amritsar-Mehta-SriHargobindpur-Tanda road (NH-503A) OJSC Euro-Asian Construction Corporation
527 Punjab 503A , 54 35.28 EPC 4L 01/01/2024
near SriHargobindpur to Junction with Pathankot-Gurdaspur road Evrascon - MKC Infrastructure Ltd. (JV)
(NH-54) near Gurdaspur (Km 362+420 to km 397+700)

Page 33 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

Delhi-Amritsar-Katra Expressway (Phase-I Spur-I) from Jn. with


Kapurthala - Sultanpur Lodhi Road (NH-703A) near Isharwal village
528 Punjab 3 17 EPC 4L 17/04/2023 S.P. Singla Construction Pvt. Ltd
to Jn. with Kapurthala - Tarn Taran road (NH-703AA) near Goinwal
Sahib [Km 24+000 to Km 41+000 of Amritsar connectivity]

Delhi-Amritsar-Katra Expressway (Phase-I Spur-III) from Junction


with Amritsar-Jalandhar road (NH-3) near Bhishambarpura to Joint Stock Company Industrial Association
529 Punjab 54 28 EPC 4L 09/11/2022
Junction with Amritsar-Anjala road (NH-354) near Amritsar Airport Vozrozhdenie
[Km 71+000 to Km 99+000 of Amritsar connectivity]
Development of 6L (Greenfield) Jalandhar Bypass starting from
530 Punjab Kahlwan (NH-03) ending at Kang Sahbu (NH-703) via Sarmastpur - 46.5 HAM 6L 29/12/2022 Krishna Constructions.
(NH-44) - Madara (NH-03) - Khajurla (NH-44)
NH-1 (New Item
531 Punjab Rectification of 6 nos. of Blackspots in District of Ludhiana, Punjab 291.1 6L 27/04/2022 Satish Aggarwal & Co
NH-44) Rate
Road Safety works with construction of Steel Truss Bridge at Km.
1+700, 2+450, 3+300 and 3+900 over Sidhwan Canal on 4-lane
532 Punjab 5 0.136 EPC 3L 26/12/2023 Bhullar Constructions
(Partial Access Controlled) Laddowal Bypass from Km 0.000 to Km
17.041
FOB near Passport Office at design km 4.200 of Elevated Samrala Item
533 Punjab 95 0.1 4L/6L 25/01/2023 Preeti Buildcon Pvt. Ltd.
Chowk section of NH-95 (new NH-05) Rate
2L/4L Flyover at existing km.6.00 at Bharat Nagar Junction with 4L
flyover towards ISBT from km.5.302 and 2L ramp towards railway Gaanesh Kartikey Construction Private
534 Punjab 05 1.58 EPC 2L/4L 18/11/2021
station from km.5.240 (Back chainage) i/c Limited
resurfacing/construction of existing service road of NH-05
Shifting and Installation of Toll Equipment from Km 132.965
535 Punjab (Jagjitpura) to Toll Plaza at Km 127.400 Village Malian of Moga- Item
Tallewal-Barnala Section NH-703 703 0.001 Rate 4L PS 14/03/2024 N.B.Construction Company
6L of Jodhpur Romana (Bathinda) - Mandi Dabwali (Punjab
536 Punjab Haryana Border) section of NH-54 from km. 0.000 to km. 27.400
of NH-54 54 27.4 HAM 6L 11/08/2023 Ceigall India Ltd.
6L Amritsar-Bathinda Greenfield section from village Tiba on NE-
537 Punjab 5A to Jn. with Moga Jalandhar road (NH-703) near Dharamkot
from km 0.000 to km 39.000 of NH-754A (Pkg-1) NH-754A 39 HAM 6L 14/11/2022 G R Infraprojects Limited
6L Amritsar-Bathinda Greenfield section from Jn. with Moga
Jalandhar road (NH-703) near Dharamkot to Jn. with Bhagta Bhai
538 Punjab
Ka-Bhadaur Road near Dyalpura Bhai Ka from km 39.000 to km
93.000 of NH-754A (Pkg-2) NH-754A 54 HAM 6L 01/11/2023 Krishna Constructions.
6L Amritsar-Bathinda Greenfield section from Jn. with Bhagta Bhai
Ka-Bhadaur Road near Dyalpura Bhai Ka to Jn. with Mandi
539 Punjab
Dabwali Bathinda Road on NH-54 near Sangat Kalan from km
93.000 to km 154.866 of NH-754A (Pkg-3) NH-754A 61.866 HAM 6L 01/11/2023 Krishna Constructions.

6L Access Controlled Ludhiana-Bathinda Greenfield highway from


540 Punjab Jn. with Amritsar-Bathanda Greenfield Road (NH-754A) near
Rampura Phul to Jn. with Moga-Barnala Road (NH-703) near
village Tallewal from Km 0.0 to Km 30.3 of NH-754AD (Pkg-1) NH754AD 30.3 HAM 6L 14/09/2023 Ram Kumar Contractor

Page 34 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Repair and Overlay work on Existing portion of Proposed zirakpur
541 Punjab Bypass sectionof PR-07 starting from Birchatt Junction from Item
Km.0.000 to Km 5.000 in the state of Punjab PR-07 5 Rate 6L 25/05/2023 Rajinder Infrastructure Private Limited
Widening and up-gradation of Zirakpur to Patiala section from km Item
542 Punjab
00.000 to km 50.000 in state of Punjab 07 0.2 Rate 4L 25/07/2023 North East Organised floritech
2L service road along with RE Wall at Patiala Sanaur Junction
543 Punjab (Existing VUP @ km. 54+702) on Patiala Bypass section of NH-64 Item
(New NH-07) 07 1.417 Rate 2L 30/03/2022 Royal Deep Construction Private limited
Demolition and Re-construction of Deck Slab and super structure
544 Punjab of Minor Bridge at km. 60.682 (LHS) on Patiala Bypass Section of Item
NH-07 07 0.2 Rate 4L 24/02/2023 N.B.Construction Company
Strengthening of damaged road from 230.100 km to 230.400 km
545 Punjab and bridge on Ch. 230.645 km in Khanauri of NH-52) on Sangrur Item
to Pb/Hr stretch 52 0.4 Rate 4L 29/12/2023 N.B.Construction Company

546 Punjab Construction of Rainwater drain and inspection chambers at Item


service road at Ch. Km. 51.000 (RHS) of approx. length of 587 Mtr. 7 19.28 Rate 4L 16/03/2024 N.B.Construction Company
4L LVUP alongwith approaches between existing km 172.500 to
547 Punjab Km 174.000 on Barnala-Bathinda Section of old NH-64 (new NH- Item
07) 7 1.5 Rate 4L 06/01/2022 Varinder Kumar Contractor

Road Safety works with Restoration of Highway from the Junction


548 Punjab
of Green City Chowk to Ballaram Chowk and Installation of Safety Item
Measures in Bathinda City Section of New NH-07 7 0.57 Rate 4L PS 27/07/2023 Shivam Construction Co.
4L Greenfield (a) Malout bypass from ch. Km 44.500 to ch. Km
35.500 on NH-07 and Ch. Km 0.000 to Km 6.984 on NH-09
549 Punjab
(b)Mandi Dabwali Bypass from Ch. 38.450 Km to Km 27.910 (Pkg-
02) 09 24.934 EPC 4L 31/12/2022 Gawar Construction Ltd
550 Punjab
Moga - Bagha Purana - Bajakhana from km. 0.00 to km. 43.32 105B 43.32 HAM 4L 28/12/2022 VRC Constructions (India) Pvt. Ltd.
Balance work of ROB and Other Associated Works of Four Laning
551 Punjab of Ludhiana to Talwandi Section of NH-95 from km 92.000 to km. Item MCCMAHADEO Constructions Private
170.000 of old NH-95 (new NH-05)(Part-2) 95 1.6 Rate 4L/6L 01/02/2023 Limited

Providing and Fixing view cutter on RE Wall, Structures in front of


552 Punjab
Police Stations/Government Offices at Mullanpur, Jagraon, Moga Item
and other locations on Ludhiana Talwandi Section of NH 05 5 78 Rate 4L 15/12/2023 Welkin India Incorporate
Road Safety works with constrution of Foot Over Bridge near CT
553 Punjab University on Ludhiana to Talwandi Section of NH-95 from km Item
92.000 to 170.000 5 0.01 Rate 4L PS 15/12/2023 VMAKS Constructions Private Limited
Road Safety works with Construction of Foot Over Bridge at
554 Punjab Mullanpur Dakha near Govt. School on Ludhiana to Talwandi Item
section of NH-95 from km 92.000 to 170.000 5 0.01 Rate 4L PS 14/12/2023 Satish Aggarwal & Co

Varindera Constructions Limited (Lead


555 Punjab
Member of JV - Varindera Constructions Ltd.
4L of Greenfield section from Sirhind to Mohali 205AG 27.37 EPC 4L 08/05/2023 and Vijai Construction (India) Pvt. Ltd.)

Page 35 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

556 Punjab Construction of FOB in front of Government School at Lalru (Km.


17.770) on Ambala-Chandigarh section of NH-152 152 0 EPC 4L 04/10/2022 The Shivam Enterprises

Construction of 4L VUP at Km. 34.420, Flyover at Km. 35.940 and


557 Punjab
2 nos. of FOB at Km. 34.890 & Km. 37.045 on Ambala-Chandigarh Gaanesh Kartikey Construction Private
section (from Km. 33.800 to Km. 37.100)of NH-152 152 3.3 EPC 4L 23/04/2022 Limited
Construction of LVUP at Dhakoli Junction at Km.39.784 of Ambala
558 Punjab
Chandigarh Section on NH-152 152 0.66 EPC 4L 09/09/2022 Associated Engineers

559 Punjab Construction of 4L VUP at Bhankarpur Junction at Km.33.275 on Gaanesh Kartikey Construction Private
Ambala-Chandigarh section of Old NH-22 (new NH-152) 152 0.865 EPC 4L 20/07/2023 Limited

4/6L Greenfield Ludhiana– Rupnagar highway from Jn. with NE-5


560 Punjab village near to Manewal(Ludhiana) to Jn. with NH-205 near
Bheora Village (Rupnagar) from Km. 0.00 to Km. 37.7 including
spur to Kharar with Ludhiana bypass of NH-205K (Pkg-1) 205K 37.7 HAM 4L/6L 12/12/2022 G R Infraprojects Limited
4/6L Greenfield Ludhiana–Rupnagar highway from Jn. with NE-5
village near to Manewal(Ludhiana) to Jn. with NH-205 near
561 Punjab Bheora Village (Rupnagar) from Km 66.0 to Km 91.0 i/c spur to
Kharar from Km 0.0 to Km 19.5 with Ludhiana bypass of NH-205K
(Pkg-3) 205K 43.26 HAM 4L/6L 06/02/2023 IRCON International Limited
562 Punjab 6L of IT City Chowk to Kurali Chandigarh Road 205A 31.23 EPC 4L 10/10/2022 Ashoka Buildcon Limited

6L of Ambala-Chandigarh greenfield section from Km. 0.000 to


563 Punjab
Km. 25.000 with 4L spur to Lalru from Km. 0.000 to Km. 5.828 &
spur to PR-7 road from Km. 0.000 to Km. 11.157 TBD 30.828 HAM 6L 12/10/2023 VRC Constructions (India) Pvt. Ltd.
Maintenance and Blackspot rectification of Kharar-Banur-Tepla
564 Punjab
section from Km.0.000 to Km. 39.530 of NH-205A 205A 39.53 EPC 2L/4L 30/05/2022 Rajinder Infrastructure Private Limited
4L of Fazilka to Abohar section of NH-07 including construction of
565 Punjab
Greenfield Abohar & Fazilka Bypasses 07 44.96 HAM 4L 13/04/2024 Gawar Construction Ltd
Amritsar(airport Junction) - Ramdas from km. 100.835 to km.
566 Punjab
139.813 (Pkg - IV) 354 39.165 EPC 4L/2L PS 16/03/2022 KRC Infraprojects Pvt. Ltd.
One Time Improvement of Bypassed Section of new NH-354 of
567 Punjab section Amritsar (Airport junction) to Ramdas from Ch. 100.835 to Item
Ch. 139.813 354 9.823 Rate 4L 16/08/2023 Satish Aggarwal & Co
SKS Infra Projects Pvt. Ltd. - KRC Infra
568 Punjab
Amritsar Bypass (Pkg III) from km. 71.496 to km. 105.158 354 49.944 EPC 4L PS 31/08/2022 Projects Pvt. Ltd. (JV)
4L of Beas-Mehta-Batala-Dera Baba Nanak from intersection with
Jalandhar-Amritsar Highway (NH-3) near Beas till start of Batala
569 Punjab
Bypass near Village Acchhal (from Km. 0.000 to Km. 31.300) (Pkg-
1) TBD 31.3 EPC 4L 22/06/2023 Ganeshgarhia Construction Private Limited

4L of existing Beas – Baba Bakala - Dera Baba Nanak Section from


570 Punjab start of Batala Bypass till intersection with Ajnala Gurdaspur
Highway (NH 354) near Dera Baba Nanak ( from Km. 31.300 to
Km. 69.100 ) with Additional batala Bypass (Pkg-II) NH - 503D 47.8 EPC 4L 22/06/2023 Varaha Infra Ltd.

Page 36 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

Rectification of Blackspot by Construction of 4L VUP at km 39.960,


571 Punjab
flyover at km 40.320 and km 46.630 between km 39.300 to km
47.170 in Kurali-Kiratpur section of old NH-21 (new NH-205) 205 2 EPC 4L/6L 01/11/2022 Oasis Technocons Limited
4L of Amritsar-Ghoman - Tanda - Una Section from Km 8.270 to
572 Punjab
Km 54.000 of NH-503A (Package-I) 503A 45.33 HAM 4L 20/06/2022 Chetak Enterprises Pvt Limited
Strengthening of Bypassed Sections of Sri-Hargobindpur, Rarra
573 Punjab and Tanda in length of 11 Km on the Ghoman-Tanda section of Item
NH-503 A from Km. 54.000 to Km. 85.500 503A 11 Rate 2L 30/03/2024 Dhingra Brothers (India)
Construction of VUP Service road at km.17.325 in village Behram
574 Punjab
on Phagwara- Rupnagar section of NH-344A 344A 1.083 EPC 4L 09/06/2023 Associated Engineers
Construction of the service road from Km.74.220 to Km.75.00
575 Punjab including Minor Bridge at Km.74.361 at Village Fatehpur Distt. SBS Item
Nagar 344A 0.78 Rate Others 06/11/2023 Mahipal Construction Co.
Rectification of Blackspot by Construction of Underpass at Sohal
576 Punjab Town on Pathankot - Amritsar Section of NH-15 from Km.6.082 to
Km.108.502 at Ch. 43+500 54 0.9 EPC 4L 20/01/2024 Vijay Kumar Contractor
Strengthening of existing four lane carriageway of Pathankot to
577 Punjab Amritsar section of NH-54 from Km. 6.082 to Km. 108.502 in the
state of Punjab 54 102.42 BOT Toll 4L 11/01/2021 IRB Infrastructure Developers Ltd.
4 Nos. of Foot Over Bridges at Kotla Shamshpur at Km. 49.000,
578 Punjab Khant at Km. 30.340,Mandera at Km. 41.370 and at Km.15.700
(Chandigarh University). 05 0 EPC Others 22/01/2021 E5 Infrastructure Pvt. Ltd.

6L of existing Taran Taran flyover to Golden Gate stretch of NH-03


579 Punjab inc. 6L flyover at Km 446.590 (in front of best price) & Km 448.100
(in front of the Daboorja Road) and VUP at Km 448.590 and Major
bridge at Km 445.957 for Blackspot rectification 3 3.5 EPC 6L 07/01/2022 DMR Builders Pvt. Ltd.
6L flyover at existing km 430.625 near Tangra town and 6L VUP at
existing km 435.170 near Mallian town inc. construction of new
580 Punjab
service road at location of flyover & VUP for blackspot
rectification of NH-03 03 1.5 EPC 6L 07/01/2022 MYC Infra Private Limited
6L elevated structure in Rayya at km 419.690 of NH-03 with
581 Punjab service road on both sides including approaches for rectification
of blackspots 03 1.5 EPC 6L 20/09/2021 DMR Builders Pvt. Ltd.
Construction of 6L Flyover at km 417.374 and 6L VUP at Km
416.700 i/c construction of new service road at location of flyover
582 Punjab
and VUP on Jalandhar-Amritsar section of NH-03 for rectification
of Blackspots 03 1.5 EPC 6L 07/01/2022 MYC Infra Private Limited

583 Punjab 6L Elevated highway including LVUP/VUP at Junction of Amritsar -


Tanda section from Km. 39.220 to Km 40.910 of NH-03 (Blackspot) 03 1.169 EPC 6L 15/03/2022 MYC Infra Private Limited
Cycle Track from War Museum to Attari Border, Amritsar on NH-
584 Punjab
03 3 18 TBD Others 07/07/2022 MVD Cementation and Construction Pvt. Ltd.
Construction of VUP, widening of existing Minor Bridge including
585 Punjab Construction of new Service Road at Loharaka crossing at km
462.339 of NH-03 03 1 EPC 4L 17/08/2021 Rajinder Infrastructure Private Limited

Page 37 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Construction of New MNB on Main Carriageway at Km 462+087
near Loharka crossing, MNB on Service Road including
586 Punjab dismantling of old bridge, service road at RHS and concrete crash
barrier with friction slab at RHS in the state of Punjab on EPC
mode 3 1 EPC 4L 14/07/2022 Rajinder Infrastructure Private Limited
Construction of Service Road from Km. 464.265 to Km. 464.905 Item
587 Punjab
(LHS) old NH-01 (New NH-03) 3 1 Rate 4L 18/07/2022 Roadlink Infratech Pvt. Ltd.
Design, Supply, Installation/erection, testing and commissioning
588 Punjab of Monumental National Flag Mast of 418 Feet with Surveillance Item
Post at Attari Border on NH-03 3 0.05 Rate TBD 28/11/2022 SKIPPER Limited
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-09) (Ch.
589 Rajasthan 247.310 to Ch. 292.950) [Junction with MDR-1 (Baonli-Jhalai road) 148N 45.64 EPC 8L 18/12/2020 H.G. Infra Engineering Limited
to End of Interchange on NH-166 near village Mui]
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-10) (Ch. Dhaya Maju Infrastructure (Asia ) Sdn.
590 Rajasthan 292.950 to Ch. 319.400) [End of Interchange on NH-166 near 148N 26.45 EPC 8L 22/05/2021 Berhad - Crescent EPC Projects & Technical
village Mui to Hardeoganj village near Indergarh] Services Ltd.
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-11) (Ch.
591 Rajasthan 319.400 to Ch. 331.030) [Hardeoganj village near Indergarh to 148N 11.63 EPC 8L 22/05/2021 Larsen & Toubro Ltd.
Major Bridge on Mej River]
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-13) (Ch.
592 Rajasthan 359.170 to Ch. 388.420) [Junction with SH-37A to Junction with 148N 29.25 EPC 8L 25/03/2021 CDS Infra Projects Limited
NH- 76]
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-14) (Ch. Dhaya Maju Infrastructure (Asia ) Sdn.
593 Rajasthan 388.420 to Ch. 419.000) [Junction with NH- 76 to Junction with 148N 30.58 EPC 8L 24/05/2021 Berhad - Crescent EPC Projects & Technical
NH-12 near village Ummedpura] Services Ltd.
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-15) (Ch.
419.000 to Ch.427.300) [Junction with NH-12 near village Dilip Buildcon Limited - Altis - Holding
594 Rajasthan 148N 8.3 EPC 8L 05/07/2021
Ummedpura to Major bridge over Takli river near Nayagaon Corporation (DBL AHC JV)
Jageer village]
4L Greenfield spur from Delhi-Vadodara Greenfield expressway
595 Rajasthan NE4C 67 HAM 4L 11/11/2022 G R Infraprojects Limited
near Bandikui to Jaipur
Construction of 6 laning flyover at Km. 178.250 (Baba Bal Nath
596 Rajasthan Samadhi Sthal) on Gurgaon Kotputli Jaipur section of NH 48 in the NH-48 1.13 EPC 6L 06/07/2024 Welkin India Incorporate
state of Rajasthan on EPC Mode
Construction of Balance Works of Two Number of Interchanges at
Jaipur Ring Road (NH-148C) from Tonk Road (NH-52) to Ajmer Sheeraj Project Pvt Ltd in JV with KCC
597 Rajasthan NH-148C 6.872 EPC 6L 23/06/2024
Road Section (NH-48) in the State of Rajasthan on Engineering, Buildcon Pvt. Ltd.
Procurement & Construction (EPC) Mode
Additional Works on 6L Jaipur-Kishangarh-Ajmer-Beawar section
598 Rajasthan 58 0 EPC 6L 06/09/2022 Apex Tarmac Pvt. Ltd.
of NH-48, NH-448 and NH-58
6L flyover at the junction of Bhankrota (Ch. 278.278),
Narsinghpura (Ch. 282.640), Mahalan (Ch. 301.090),
599 Rajasthan Mokhampura (Ch. 312.347), Padasoli (Ch. 339.879) and 3L Flyover 48 6.268 EPC 6L 13/09/2022 J.K. Associates
at Heerapura Junction (Ch. 278.891) on Jaipur Kishangarh section
of NH-8 (New NH-48)

Page 38 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Rectification of 01 No. Blackspot identified by MORTH under
Jurisdiction of PIU Chittorgarh at Km. 485+920 (Gangrar) on Six
600 Rajasthan NH-79 1.31 EPC 6L 06/12/2023 Vishesh Infrastructure Pvt. Ltd.
Lane of Gulabpura-Chittorgarh section of NH-79 (Km. 90.000 to
Km. 214.870)
Strengthening for (i) Pindwada – Sawroopganj section of 4-Lane
27 E.W.,27
NH-14 (New NH-27) from km 248+700 to km 264+000. (ii)
601 Rajasthan E.W.,27 49.024 EPC 4L 05/07/2024 Suraj Construction Company
Pindwada-Udaipur section of 4-Lane NH-76 (New NH-27) from km
E.W.
10+000 to km 12+000 & from km 73+000 to km 104+724
Rectification of Black Spots on 4L Gomati Chauraha - Udaipur
602 Rajasthan
section of NH-8 from KM 177.000 to KM 260.100 8 79.3 EPC 4L 16/01/2023 Shri Rajendra Kumar Kalal
Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border (Phase-I)
603 Rajasthan
(AJ/DRGB-Package-6) 754K 25 EPC 6L 12/08/2021 Lakshmi Infrastructure & Developers Pvt Ltd
Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border (Phase-I)
604 Rajasthan
(AJ/DRGB-Package-7) 754K 30 EPC 6L 16/07/2021 Lakshmi Infrastructure & Developers Pvt Ltd
Jiangxi Construction Engineering (Group)
605 Rajasthan Deogarh (near Dhandhaniya)-Rajasthan/Gujarat Border (Phase-I) Corporation Ltd.-MKC Infrastructure Limited
(AJ/DRGB-Package-8) 754K 27.1 EPC 6L 18/10/2021 (JV)
Construction of VUP at Km 69.90 for Sojat Town near Ganga
606 Rajasthan
Petrol Pump and Flyover at Km 112.736 on NH-62 62 1.812 EPC 4L 06/07/2020 Ramesh Kumar Bansal
6L access controlled Highway from Km 40+080 to Km 86+513 Joint Stock Company Industrial Association
607 Rajasthan
(Mator to Barodameo Section) 148B 46.433 EPC 6L 15/03/2024 Vozrozhdenie
Rectification of 01 No Black Spot Identified by MoRTH at Km.
608 Rajasthan
5+900 (JK Circle) 758 1.46 BOT Toll 4L 27/04/2022 K K Gupta Construction Pvt.
Tanot -Ramgarh-Bhadasar-Jaisalmer (NH-68 )and
609 Rajasthan Bhadasar(Mokal)-Sarkaritala up to Pakisthan Border (NH-968) Brij Gopal Construction Co. Pvt. Ltd. -
(Pkg-BM/5) 68 193.52 EPC 2L PS 23/04/2019 Ramkey Infrastructure Ltd.(JV)

610 Rajasthan 4L of Rajasthan Border (Km. 0.000) to Salasar (Km. 154.141) of NH- NH-65(New
52 and NH-58 in Rajasthan NH-52&58) 154.141 BOT Toll 4L/2L PS 06/02/2014 SALASAR HIGHWAYS PRIVATE LIMITED

Construction of Service Road. RCC drain. PGR at various location &


611 Rajasthan
Development of existing alignment of Bhavi village Bar-Bilara- Item
Jodhpur section of NH.25 (Old NH-112) in the State of Rajasthan. NH-25 7.483 Rate Others 11/03/2024 Murari Lal Agrawal
4L of Karwar (Km. 281.980 of NH-62 Nagaur road) to Dangiyavas Spetsdorstroy LLC - OSS Construction
612 Rajasthan
of Jodhpur Ring Road (Pkg-II) 125A 30.093 EPC 4L 29/08/2022 Private Limited (JV)
Construction of Four lane Elevated Structure at Raniwada Circle in
613 Rajasthan
Sanchore City on NH-68 68 6.2 EPC 4L 12/07/2024 Vidya InfraBuilt Pvt. Ltd.
Reconstruction & Rehabilitation Bituminous Pavement Works and
Incidental Works of Deoli-Kota Section of NH- 12 (New NH- 52)
614 Rajasthan
from Km. 165.00 to Talabgaon Junction (Design Km.167.624 to Item Murari Lal Agarwal - Bharat Spun Pipes and
Km. 205.724) (Package-1) 52 38.1 Rate 4L 16/03/2021 Construction Company (JV)

Reconstruction & Rehabilitation with CC Pavement and Incidental


615 Rajasthan Works of Deoli-Kota Section of NH-12 (New NH- 52) from
Talabgaon to Junction of NH- 76 (New NH- 27) on Kota Bypass Item Ramesh Kumar Bansal - Rajendra Singh
(Design Km.205.724 to Km. 250.144) (Package-2) 52 44.42 Rate 4L 16/03/2021 Bhamboo Infra Pvt. Ltd. (JV)

Page 39 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Rectificationof Accident Black spots at Km 190.724 (Hindoli)
Junction with NH-148D and Km200.890 (Sathur) Junction with NH-
616 Rajasthan 148D on Deoli-Kota section (Design km 167+624to km 250+144)
section of NH-12 (New NH-52) in the state of Rajasthan on
EPCmode 52 2.92 EPC 3L 28/08/2024 PRL Projects and Infrastructure Limited

617 Rajasthan 2L PS Sriganganagar to Raisinghnagar (Design Chainage -0.500 km


to Design Chainage 101.000 km) (Package-1) on NH-911 911 102 HAM 2L PS 10/06/2022 VRC Constructions (India) Pvt. Ltd.
NH-11B
618 Rajasthan Strengthening and major maintenance work from Km 83.960 to (New NH-
Km 184.860 of NH-11B of Karauli Dholpur Section 23) 100.9 EPC 2L PS 30/10/2023 SRSC INFRA PRIVATE LIMITED
Rajasthan,Harya Strengthening/Overlaying on 6L Gurgaon–Kotputli–Jaipur section Item
619 48 64.4 6L 17/10/2022 Winner Construction Private Limited
na from Km 42.700 to Km 107.100 of NH-48 (Old NH-8) Rate
Bangalore Chennai Expressway Phase-III – Package I (Gudipala to Montecarlo Bangalore Chennai expressway
620 Tamil Nadu TBD 24 HAM 4L/6L 30/05/2022
Walajajhpet) from Km 156.000 to Km 180.000 P2P1 Private Limited.
Bangalore Chennai Expressway Phase-III – Package II (Walajahpet
621 Tamil Nadu TBD 24.5 HAM 4L/6L 16/07/2022 KCC Buildcon Pvt. Ltd.
to Arakkonam) from Km 180.000 to Km 204.500

Bangalore Chennai Expressway Phase-III – Package III (Arakkonam


622 Tamil Nadu TBD 25.5 HAM 4L/6L 08/08/2022 D P Jain and Company
to Kancheepuram) from Km 204.500 to Km 230.000

6L of Maduravoyal to Sriperumbudur Section from Km. 13.800 to Item


623 Tamil Nadu 48 23.2 6L 21/01/2022 State PWD
Km. 37.000 of NH-4 through State Highways Department Rate
Construction of Trumpet Interchange Connecting Bangalore –
Chennai Expressway (km.261+705 to km. 262+800) with NE-7 & NH-
624 Tamil Nadu 1.1 EPC 4L 26/02/2024 Ramalingam Construction Company Pvt. Ltd
Maduravoyal to Walajapet Section of NH 48 near Sriperumbudur 48
Toll Plaza at km. 35+700
4L Bangalore-Chennai Expressway from Km. 230.000 to Km.
625 Tamil Nadu 261.705 of Kanchepuram to Sriperumbudur Section (Phase- TBD 31.705 HAM 4L 11/07/2022 Ramalingam Construction Company Pvt. Ltd
III/Package-IV)
Construction of Light Vehicular Underpass (LVUP) (12m X 4m) at
Km.72+060 at Samalpallam Junction in the Project of Hosur to Sri Ranganathar Constructions Private
626 Tamil Nadu 44 0.6 EPC 4L/6L 26/06/2023
Krishnagiri section of NH-44 in the State of Tamil Nadu on EPC Limited.
mode
Permanent Rectification of Blackspot TN-(02)-018 by Construction
of Vehicular Underpass of VUP (20m x 5.5m) at Km.61+270
627 Tamil Nadu (Minnur Jn.) with Service Road (on BHS) from Km.60+900 to 48 0.6 EPC 4L/6L 27/04/2024 Sri Yogalakshmi Bluemetals Industries.
61+620 on Krishnagiri to Walajahpet section of NH-48 in the State
of Tamil Nadu on EPC mode
Permanent Rectification of Black Spot TN-(02)-255 by
Constructing a Vehicular Underpass of VUP (20m x 5.5m) at Km.
628 Tamil Nadu 134/328 (Then Nanthiyalam Junction) in the project of Krishnagiri 48 0.6 EPC 4L/6L 27/04/2024 Vidya InfraBuilt Pvt. Ltd.
to Walajahpet section of NH-48 in the state of Tamil Naduon EPC
mode

Page 40 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

Permanent Rectification of Black Spot TN-02-039 by Construction


of LVUP (12m X 4m) at km. 130+200 (Poottuthakku Junction) in
629 Tamil Nadu 48 0.6 EPC 4L/6L 12/09/2023 KGK Engineers Pvt Ltd.
the project of Krishnagiri-Walajahpet section of NH-48 (New No.
NH-46) in the State of Tamil Nadu on EPC mode
Permanent Rectification of Black Spot TN-(02)-024 by
Construction of Light Vehicular Underpass (LVUP) (12m X 4m) at
630 Tamil Nadu Km.80+525 at Venkili in the Project of Krishnagiri to Walajahpet 48 0.6 EPC 4L/6L 21/10/2023 KRMS Constructions.
section of NH-48 from Km.0+000 to Km.148+300 in the State of
Tamil Nadu on EPC mode
Permanent Rectification of Black Spot TN-(02)-189, TN-(02)-406
and TN-(02)-079 by Constructing a Vehicular Underpass (VUP) at
Orrappam Junction Km.8+617 with Service Road extended upto
631 Tamil Nadu 48 1.8 EPC 4L/6L 07/05/2024 P. Paramasivam
Chettipalli Junction at Km. 9+850 & LVUP at Kandhikuppam
Junction Km.11+720 on Krishnagiri – Walajahpet section of NH-48
(Old No. NH-46) in the State of Tamil Nadu on EPC mode

Permanent Rectification of Black Spot TN-(02)-040 and TN-(02)-


034 by Constructing a (VUP) (1 x 12m x 5.5m) at Km 95/190
632 Tamil Nadu (Vettuvanam Junction) and (VUP) (1 x 20m x 5.5M) at Km 100/893 48 1.2 EPC 4L/6L 06/05/2024 KRMS Constructions.
(Kandhaneri) in the project of Krishnagiri to Walajahpet section in
the state of Tamil Nadu on EPC mode
Permanent Rectification of Black Spot TN-(02)-089, by
Constructing a Light Vehicular Underpass (LVUP) (1x12mx4m) at
633 Tamil Nadu Km.55+815 Girisamuthiram in the project of Krishnagiri – 48 0.6 EPC 4L/6L 12/09/2023 Nagarajan Construction Company Pvt Ltd.
Walajahpet section of NH-48 (Old No.NH-46) in the State of Tamil
Nadu on EPC mode
6L of Sriperumbudur to Karaipettai from Km 37.000 to Km 71.015 KMC Constructions Ltd. - JSR Infra
634 Tamil Nadu 48 34.02 EPC 6L 24/05/2019
of NH 48 Developers Pvt.
635 Tamil Nadu Karaipettai to Walajapet from Km 71.015 to 107.091 48 36.08 EPC 6L 11/02/2019 SPK & CO.
Permanent Rectification of Black SpotTN-(02)-468 & TN-(02)-
216by Construction of Vehicular Underpass (VUP) (1 x 12m x
5.5m) at Km.177/880 (Pannapatty Junction) along with Service
Road in the Project of Krishnagiri – Thumbipadi section of NH-44
636 Tamil Nadu (Old No.NH-07) in the State of Tamil Nadu and Permanent NH-44 3 EPC 4L 30/06/2023 P. Paramasivam
Rectification of Black Spot TN-(02)-183 & TN-(02)-215 by
Construction of Service Road from Km 175/080 to Km 176/600 on
BHS (Dasasamuthiram & Poosaripatty Junction) in the project of
Krishnagiri - Thumbipadi section of NH-44 (Old No.NH-7)

Page 41 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

Permanent Rectification of Black Spots TN-(02)-244 & TN-(02)-


433, TN-(02)-180, TN-(02)-043 and TN-(02)-154 by a Vehicular
Underpass (VUP) (12mx5.5m) at Km 197.580 (Mamangam Police
Signal), Pedestrian Underpass (PUP) (7mx3m) at Km 197.840, a
637 Tamil Nadu Vehicular Underpass (VUP) (12m x5.5m) at Km 214.095 (Santhiyur 44 6 EPC 4L/6L 28/12/2023 TPC Infra and Green Energies
Pirivu), a Vehicular Underpass (VUP) (20m x5.5m) at Km 216.130
(Mallur Pirivu) and service road improvement at Km 234.750
(Puduchatram) in the project of Salem - Namakkal section of NH-
44

Construction of Vehicular Underpass (VUP) at Km.288+450


638 Tamil Nadu (Manmangalam Village) in the project of Namakkal – Karur 44 0.645 EPC 4L/6L 19/02/2024 V. Rasappan & Co.
section of NH-44 in the State of Tamil Nadu on EPC mode.

Short Term measures for rectification of Accident Spots in Karur-


Dindigul section at Km 298+700 (Karuppampalayam pirivu old Item
639 Tamil Nadu NH-44 1 4L PS 19/03/2024 S. Kannan
sukkaliyur check post NH-44) & Km 345+500 (Viruthalaipatty Rate
Bridge) of NH-7 in the State of Tamil Nadu on Item Rate Basis
4L of Madurai Ring Road (Phase 1) [Vadipatti-Thamrapatti] from
640 Tamil Nadu 744A 29.96 EPC 4L 16/03/2020 NCC Limited
km 0.00 - km 29.960
Rectification of Blackspot TN-(03)-303 by Construction of 6Lane
VUP of size 12x5.5m at Km 203.995 on Madural Kanniyakumari
641 Tamil Nadu Section of NH44 (Old NH7) RE Wall approaches 2Lane Service 44 0.838 EPC 6L 19/08/2024 Sindhu Muruga Construction Pvt. Ltd.
Road Reconstruction of 2 Nos of Minor Bridges etc. In the State of
Tamil Nadu on EPC Mode.

Permanent Rectification of Black Spot TN-(02)-297, TN-(02)-388,


TN-(02)-688 and TN-(02)-324 By constructing a 3 Lane Additional
flyover on RHS (1x 25+1x40+1x25m) at Km 4+886
(Uthamasolapuram), a Vehicular Underpass (VUP) (20m x5.5m) at
642 Tamil Nadu Km 26+160 (Vaigundam near Saravana Bhavan), a Vehicular NH-544 5 EPC 6L 06/09/2023 RPP Infra Projects Ltd
Underpass (VUP) (20m x5.5m) at Km 51+000 (Vallaiyakaranur Bus
stop opposite to SSM College) and a Vehicular Underpass (VUP)
(30m x5.5m) at Km 53+390 (Katheri Pirivu) in the project of Salem
- Kumarapalaym section of NH-544

Page 42 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

Permanent Rectification of Black Spot TN-(02)-384, TN-(03)253 &


TN-(03)-254 by Constructing a Vehicular Underpasses 1 No. of size
(1 x 30m x 5.5m) at Km.64+920 – SS Punjabi junction with service
road from Km.64+050 to Km.65+550 on both sides and 2 Nos. of
VUP of size (1 x 12m x 5.5m) one at Km.78+379 (Kanchikovil) & Sri Ranganathar Constructions Private
643 Tamil Nadu 544 2.014 EPC 4L/6L 18/06/2024
another at Km.80+684 (Thudupathi) with service roads on both Limited.
sides from Km.77+010 to Km.81+940 B/S and service road from
Km.88+750 to Km.89+980 B/S & Km.90+530 to Km.91+180 B/S in
the Project of Kumarapalayam - Chengapalli Section of NH- 544
(Old NH-47) in the State of Tamil Nadu on EPC mode

644 Tamil Nadu


Hosur to Dhamrapuri (Pkg-1) [Neraluru - Thorapalli Agraharam] 844 23.35 HAM 4L 26/10/2022 SCC Infrastructure Private Limited
Thorapalli - Agraharam - Jittandahalli Section from km 23.350 to Sunway Construction Sdn Bhd - RNS
645 Tamil Nadu
km 60.100 [Hosur to Dhamrapuri Pkg-2] 844 36.75 HAM 4L 07/12/2021 Infrastructure Ltd. (Consortium)
Item
646 Tamil Nadu
Thoppur - Mettur - Bhavani - Erode from km. 0.00 to km. 85.00 544H 85 Rate 2L PS 04/08/2022 Thiru. TamilRajan
4L of left-over works including additional structures from
647 Tamil Nadu Kerala/Tamil Nadu border to Kanyakumari Section from Km 43.0 Ekk Infrastructure Limited - TTk
to Km 96.174 of NH66 66 23.67 EPC 4L PS 03/08/2023 Construction (JV)

648 Tamil Nadu Strengthening and Major Maintenance of Chennai Bypass ( NH- Item
32) from Km 0.000 to Km 32.600 in the state of Tamil Nadu. N H-32 32 Rate 6L 03/05/2024 Babuji Civil Construction
Blackspot rectification of MoRTH 2015-18- BS ID No – TN-02-38 –
Construction of Service Road from Km 82/330 to Km 83/040
649 Tamil Nadu including construction of Box Culvert, Minor Bridge, road
furniture, lightings etc along Tambaram to Tindivanam section of Item
NH-45 NH-32 0.71 Rate 4L 27/12/2021 APU Construction

Construction of approaches to ROB at Km.51/700 (159-A & B @


650 Tamil Nadu
Km.55/6-10 between (Singaperumal koil, Paranur Stations) in the
Tambaram – Tindivanam section of NH-32 (Old NH 45) NH-32 0.96 EPC 8L 25/06/2023 SREE Infratech
Construction of approaches to ROB at Km.27.800 (Tambaram and
651 Tamil Nadu Perungalathur Railway Stations) in the Tambaram – Tindivanam
section of NH-32 NH-32 0.9 EPC 8L 14/12/2023 SREE Infratech
Construction of Foot Over Bridges with Lift facility at 07 Nos of
locations between Km 30+100 to Km 47+840 on Tambaram to
652 Tamil Nadu
Chengalpattu section of NH-32 (Old No. NH45) in state of Tamil
Nadu on EPC Mode. NH-32 0.001 EPC 4L 26/08/2024 EKK Infrastructure Limited
Permanent Rectification of Black Spot TN- 02-372 by constructing
653 Tamil Nadu VUP on RHS at Km.151.140 near Kumbakonam Jn in Tindivanam -
Ulundurpet section of NH-132 45 1.9 EPC 4L/6L 07/12/2023 V Meenal and Co

Permanent Rectification of Black Spots - TN-02-109 (Tindivanam


654 Tamil Nadu Combined Court), TN-02-074, TN-092-01 (Mundiyampakkam Bus
Stop - Orathur Jn.), TN-02-031 (Vikravandi Jn.) in Tindivanam -
Ulundurpet Section of NH-132 45 5.275 EPC 4L/6L 29/08/2023 P.S.T Engineering Construction

Page 43 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Permanent Rectification of Black Spot - TN-02-521 (VUP at Km.
655 Tamil Nadu 158.740, SVUP at Km. 158.930, SVUP at Km. 157.960) in
Tindivanam - Ulundurpet Section of NH-132 45 3.47 EPC 4L/6L 29/08/2023 Tharun Construction & Co
Permanent Rectification of Black Spot - TN - 095 (VUP at Arasur
656 Tamil Nadu Jn. Km.176.320 & SVUP at Km. 176.850) in Tindivanam -
Ulundurpet section of NH-38 45 1.405 EPC 4L/6L 01/09/2023 CSK Developers

Permanent Rectification of Black Spot TN- 02-110 by constructing


657 Tamil Nadu a Light Vehicular Underpass (LVUP) (1x7x4.5m) at Km.174+550
(Iruvalpattu Jn.) in the project of Tindivanam - Ulundurpet section
of NH-45 (New No NH-38) 45 0.9 EPC 4L/6L 07/03/2024 Notch India Projects

658 Tamil Nadu Rectification of Blackspots TN-02-116 &160 by Construction of 6


Lane VUP at Km 281+900 on NH 38, Irur Junction 38 0.9 EPC 4L 25/01/2023 Bharat Engineering company (P) Ltd.

Construction of VUP at Km 286/736 (Ottathur Junction) and


reconstruction of minor Bridge at Km 287/266 (Kondakaran Bridg)
659 Tamil Nadu
towards elimination of Blackspot location for the MoRTH
identified Blackspot ID: TN(02)-138 & TN(02)-099 in Ulundurpet -
Padalur section of NH- 45 in the State of Tamil Nadu 38 0.84 EPC 6L 28/07/2022 APU Construction
Rectification of Blackspot in Padalur–Trichy Section from Km Item
660 Tamil Nadu
285.000 to Km 325.000 of NH-45 38 1 Rate 4L 18/04/2022 SD Infra Contractor

661 Tamil Nadu Elimination of Blackspot TN-(02)-080 by Construction of 6 Lane


VUP at Km. 296.771 on Padalur - Trichy section of NH-45 38 0.7 EPC 4L 18/04/2022 SD Infra
Elimination of Black Spot ID No.TN-02-546 Melur Junction at Km
662 Tamil Nadu 97.280 to Km 97.953 for the year 2015-18 on Trichy - Madurai Item
section of NH-45B 38 0.673 Rate 4L 13/05/2022 Sri S. Subbaiah & Co.
Elimination of 1 No. of Blackspot ID No. TN-02-62 at Km. 43.250
663 Tamil Nadu to Km. 43.750 for the year of 2015-18 on Trichy - Madurai section Item
of NH-38 38 0.5 Rate 4L 10/12/2021 KMC Associates
Elimination of 1 No of Blackspot ID No. TN-02-413 at Km. 80.846
664 Tamil Nadu to Km. 81.333 for the year of 2015-18 on Trichy - Madurai section Item
of NH-38 38 0.487 Rate 4L 10/12/2021 KMC Associates
Construction of 4L VUP at Km. 34.590 on Trichy - Madurai section
665 Tamil Nadu of NH-38 (Kodumbalur Junction, RE Wall & Retaining Wall
approaches, 2 Lane Service Road (B/s) etc.) 38 0.62 EPC 4L 13/06/2022 KRS Constructions
Rectification of Blackspots TN-02-191 & 408 by 4L LVUP at Km.
666 Tamil Nadu 18.647 on Trichy - Madurai section of NH-38 (Melapatchakudi &
Kelapachakudi Junction) 38 0.44 EPC 4L 13/06/2022 KRS Constructions
Elimination of Black Spot TN -41 (02) by construction of 4L VUP
667 Tamil Nadu with 2L Service Road on both sides & junction improvement at Km
105.000 on NH-38 38 0.609 EPC 4L 31/12/2020 Notch India Projects
Elimination of Black Spot TN -02 (44) through construction of 4L
668 Tamil Nadu VUP with 2L Service Road on both side & Junction improvement at
Km 84.650 on NH-38 38 0.698 EPC 4L 09/02/2021 M. Sindhu
Rectification of Blackspot TN(02)-137 by construction of 6 lane
669 Tamil Nadu
LVUP at km.52+027 on NH 38. 38 0.9 EPC 4L 25/01/2023 KMC Associates

Page 44 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Strengthening (DBM+BC) & Periodic Overlay of Trichy Bypass
670 Tamil Nadu Tovarankurichi Madurai section of length 11.6km in the state of Item
Tamil Nadu. 38 11.6 Rate 4L 02/09/2023 EKK Infrastructure Limited
Rectification of Blackspots TN-02-545 by widening of Main
carriageway from Km 187+525 to Km 188+625, widening of
671 Tamil Nadu
culverts, Drain, Bus Bay, Junction Improvement on Trichy - Karur
section of NH 81. 81 1.1 EPC 2L/4L 04/07/2023 SKP Constructions
Rectification of Blackspots TN-02-333 (KR Puram Kallukadai) by
672 Tamil Nadu Construction of Service Road from Km 191+045 to Km 192+125 in
NH 81 81 1.08 EPC 2L/4L 04/07/2023 SKP Constructions
4L of Thirumangalam to Vadugapatti section from km 0.000 to km
673 Tamil Nadu
36.000 of NH-744 744 36 EPC 4L 23/02/2023 S&P Infrastructure Developers(P) Ltd
4L of Vadugapatti to Therkuvenganallur (Rajapalyam) section
674 Tamil Nadu
from km 36.000 to km 71.600 of NH-744 744 35.6 EPC 4L 12/04/2023 KMC Construction Ltd.

One Time Improvement(DBM+BC) of abandoned NH/Bypass


675 Tamil Nadu
stretch of Existing road 2-Lane "Thirumangalam to Rajapalayam" Item
Section of NH208(Old) NH744(New) in the State of Tamilnadu. 744 38.625 Rate 2L 22/07/2024 M/s Vignessh and Co
Melur - Pilayarpatti - Karaikudi from km 99.920 of NH 38 to km KMC Constructions Ltd. - JSR Infra
676 Tamil Nadu
12.9 of NH 383 Ext. 38, 383 45.86 EPC 4L 16/03/2020 Developers Pvt.
Elimination of Black Spot TN- 64- 02 through Construction of 6
677 Tamil Nadu Lane Vehicular Underpass with 2 Lane Service Road on Both Sides Item
at Km 14.150 138 0.723 Rate 4L 30/05/2019 M. Sindhu
Elimination of Black Spot TN- 062 through Construction of Multi-
678 Tamil Nadu span Flyover at Km 2+200 on Tuticorin – Tirunelveli section of NH- Item
138 138 1 Rate 4L 25/07/2019 P.K. Mookanambalam & CO
Mahabalipuram - Pondicherry (Pkg-I) [Mamallapuram to
679 Tamil Nadu
Mugaiyur] 332A 31 HAM 4L 12/05/2022 JSR ECR Road Project Private Ltd
680 Tamil Nadu
Mahabalipuram - Pondicherry (Pkg-II) [Mugaiyur to Marakkanam] 332A 31 HAM 4L 07/12/2023 SPL Infrastructure Pvt. Ltd
Ksheerabad Construction Pvt. Ltd. - I
681 Tamil Nadu
Four Laning of Chettikulam to Natham section of NH-785 785 29.39 EPC 4L 05/11/2018 Vetrivel - OM Sakthi Construction (JV)

Construction of New Double Tier 4L Elevated Corridor from


682 Tamil Nadu
Chennai Port to Maduravoyal in Chennai District from km -0.342 J. Kumar Infra Projects limited in JV with
to Km 20.593 and Package IV from (Km 14.185 to Km 20.593) NH-48 6.408 EPC 4L 23/11/2023 AzVirat Limited liability company

Construction of New Double Tier 4L Elevated Corridor from


683 Tamil Nadu
Chennai Port to Maduravoyal in Chennai District from km -0.342
to Km 20.593 and Package III from (Km 9.700 to Km 14.185) NH-48 4.485 EPC 4L 23/11/2023 J Kumar Infra Projects Ltd.

Construction of New Double Tier 4L Elevated Corridor from


684 Tamil Nadu
Chennai Port to Maduravoyal in Chennai District from km -0.342
to Km 20.593 and Package II from (Km 4.604 to Km 9.700) NH-48 5.096 EPC 4L 23/11/2023 J Kumar Infra Projects Ltd.

Construction of New Double Tier 4-lane Elevated Corridor from


685 Tamil Nadu
Chennai Port to Maduravoyal in Chennai District from Km -0+342 J. Kumar Infra Projects limited in JV with
to Km 20+223 Package 1 from (Km -0+342 to Km 4+604) NH-48 4.946 EPC 4L 23/11/2023 AzVirat Limited liability company

Page 45 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
6L of Tuticorin Port Road section of NH-7A (New NH-138) from
686 Tamil Nadu
Km 0.000 to Km 6.140 138 6 EPC 6L 05/07/2023 P.S.T Engineering Construction
687 Tamil Nadu
Poondiyankuppam (Km.67.000) to Sattanathapuram (Km.123.800) 32 56.8 HAM 4L 20/01/2022 Oriental Structural Engineers Pvt. Ltd.
Elimination of Blackspot at Trichy - Dindigul from 333.000 Km to Item
688 Tamil Nadu
421.273 Km section of NH-45 83 1.8 Rate 4L 26/11/2021 Suganya Constructions
Elimination of 1 No. of Blackspot ID No TN-02-081 for the year of Item
689 Tamil Nadu
2015-18 on Trichy - Dindigul section of NH-83 83 0.499 Rate 4L 30/05/2022 Suganya Constructions
Not
690 Tamil Nadu Raising of Avenue plantation in Theni - kumili Section of NH -183 Applicabl
(from Km 82+410 to Km 136+543) 183 54.133 e Others 07/11/2023 North East Organised floritech
Not
691 Tamil Nadu Raising of Avenue plantation in Dindigul-Theni Section of NH -183 Applicabl
(from Km 2+750 to Km 82+410) 183 79.66 e Others 03/10/2023 North East Organised floritech

Construction of Service road on both side of ROB approach near


Boothipuram (from Km 74+400 to Km 75+118 on Dindigul side
692 Tamil Nadu and from Km 75+450 to Km 75+900 on Theni side), Construction
of RCC lined drain on BHS of Boothipuram cross road,
Construction of RCC Retaining wall/toe wall, Widening of Culvert Item
etc in Dindigul to Theni section of NH-183 183 1.5 Rate 2L 15/11/2023 V. Rasappan & Co.
693 Tamil Nadu
Kamalapuram to Oddanchatram from km. 0.00 to km. 35.822 83 36.505 HAM 4L 21/01/2021 DRN Infrastructure Private Limited
Short Term Rectification Measures of Blackspot ID:
694 Tamil Nadu Ganpathipalyam Pirivu (TN – (03)-247) & Blackspot ID: Mywadi to Item
KTL (TN – (03)-248) 209 0.23 Rate 4L 19/03/2024 S. Kannan

Short Term measures for rectification of Accident Spots locations


in Oddanchatram-Madathukulam existing section from Km
71+600 to Km71+700 (Madathukulam Ananth weigh bridge), Km
695 Tamil Nadu
72+250 to Km 72+350 (Sarkar kannadiputhur pirivu komaralingam
road), Km 72+550 to Km 72+700 (Madathukulam Bustop), & Km NH-209
72+950 to Km 73+100 (Amaravathi River bridge near) at NH-209 (New NH- Item
(New NH-83) in the State of Tamil Nadu on Item Rate Basis. 83) 2 Rate 2L PS 19/03/2024 S. Kannan

Short Term measures for rectification of Accident Spots locations


in Madathukulam – Pollachi existing section from Km 68+050 to
Km 68+150 (Chettiyar Mill Medu), Km 68+450 to Km 68+550,
696 Tamil Nadu
Narasingapuram, Km 69+050 to Km 69+150 (Narasingapuram
Sugar Mill Junction), and Km 70+700 to Km 70+850, KTL, near
Thungavi Road Junction at NH-209 (New NH-83) in the State of 209 (New Item
Tamil Nadu on Item Rate Basis NH-83) 2.7 Rate 2L PS 08/04/2024 Muthuram Enterprises
4L of Cholapuram - Thanjavur section from km 116.4 to km
697 Tamil Nadu
164.275 of Old NH-45C 36 47.84 HAM 4L PS 06/09/2018 Patel Infrastructure Limited
4L of Sethiyathope -Cholapuram section from Km. 65.960 to Km.
698 Tamil Nadu
116.440 section of NH–45 C (Pkg-II) 36 50.48 HAM 4L PS 16/08/2018 Patel Infrastructure Limited

Page 46 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Strengthening under One time Improvement of the stretches of
699 Tamil Nadu Vikravandi - Kumbakonam- Thanjavur section Of NH45C from Km Item
0.000 to Km 165.00 45C 68.28 Rate 4L 04/11/2022 Om Sakthi Constructions

700 Tamil Nadu Remaining works of Trichy - Karaikudi from Km. 10.00 to Km. 83, 336, 36, Item
94.00 including Trichy Bypass (Km. 110.016 to Km. 135.93) 536 12.77 Rate 2L PS 12/09/2019 SD Infra Contractor
Strengthening under One time improvement (DBM +BC) of
701 Tamil Nadu Bypassed stretches of Tindivanam (Km. 37.600) - Krishnagiri (Km. Item
219.782) section of NH-66 66 26.735 Rate 2L PS 20/06/2022 Thiru. M. Vediappan
Strengthening under One Time Improvement (DBM +BC) of
702 Tamil Nadu Bypassed stretches of Trichy (Km. 0.000) - Kallagam (Km. 38.700) Item
section of NH-227 227 23.9 Rate 2L 10/04/2023 TMA Infrastructure Pvt Ltd
Strengthening under One time improvement (DBM +BC) of
703 Tamil Nadu Bypassed stretches of Kallagam (Km. 38.700) - Meensurutti (Km. Item
98.433) section of NH-227 227 12.63 Rate 2L 10/04/2023 TMA Infrastructure Pvt Ltd
Strengthening under One time improvement (DBM +BC) of
704 Tamil Nadu Bypassed stretches of Meensurutti (Km. 98.433) - Chidambaram Item
(Km. 129.965) section of NH-227 227 29.2 Rate 2L 09/01/2023 S. Sabanayagam & Co.

Balance works of four lane from km 43.950 (Thiruvallur Bypass) to


705 Tamil Nadu km 61.470 (Veppampattu Bypass) passing through Thannerkulam,
Thozur and Sevapet Bypass (17.520 kms) of Tirupathi- Tiruttani-
Chennai section of NH 205 205 17.52 EPC 4L/2L PS 21/09/2022 EKK Infrastructure Limited
Balance works in AP Portion and punch list items in TN & AP Item
706 Tamil Nadu
portion of NH-205 205 7.35 Rate 4L/2L PS 06/07/2023 Lekcon Infrastructure Pvt. Ltd.
Permanent Rectification of Black Spot TN (02)-640 by
Constructing a Vehicular Underpass (VUP) (12m x 5.5m) at Km.
27+450 (Muthampatti), Black Spot TN-(02)-211 by constructing a
Vehicular Underpass (VUP) (12m x 5.5m) at Km. 110+000
707 Tamil Nadu
(Prithvimangalam), Balck spor TN -(02)-128 y Constructing a
Vehicular Underpass (VUP) (12m x 5.5m) at Km.126+700
(Elavansurkottai) in the Project of Salem to Ulundurpet section of
NH-79 (Old no. NH-68) 79 2.56 EPC 4L PS 28/08/2023 Mr. P Sivaperumal
Permanent Rectification of Black Spot TN-(02)-267 & TN-(02)-689
by Constructing a Vehicular Underpass (VUP) (1x20x5.5m) at Km.
708 Tamil Nadu
48+640 (Selliyampalayam) in the project of Salem Ulundurpet
Section of NH-79 (Old NH-68) 79 1.28 EPC 4L PS 28/08/2023 VALAR & CO
Permanent Rectification of Black Spot TN-(02)-538 by
Constructing a Vehicular Underpass (VUP) (1x12x5.5m) at Km.
709 Tamil Nadu
32+450 (Mathur Junction) in the project of Salem Ulundurpet
Section of NH-79 (Old NH-68) 79 0.99 EPC 4L PS 28/08/2023 VALAR & CO
Permanent Rectification of Black Spot TN-(02)-535 & TN-(02)-132
by Constructing a Vehicular Underpass (VUP) (1x12x5.5m) at Km.
66+165 (Sarvoy Junction) and Constructing a Light Vehicular
710 Tamil Nadu
Underpass (LVUP) (1x12m x 4m) at Km.67+070 (In-front of Tagore
School) in the project of Salem Ulundurpet Section of NH-79 (Old
NH-68) 79 1.93 EPC 4L PS 07/06/2023 Mr. P Sivaperumal

Page 47 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Permanent Rectification of Black Spot TN-(02)-182 by
Constructing a Vehicular Underpass (VUP) (1x12x5.5m) at Km.
711 Tamil Nadu
64+750 (Samiyarkinaru) in the project of Salem Ulundurpet
Section of NH-79 (Old NH-68) 79 0.86 EPC 4L PS 07/06/2023 Mr. P Sivaperumal
Permanent Rectification of Black Spot TN-(02)-377 by
Constructing a Vehicular Underpass (VUP) (1x12x5.5m) at Km.
712 Tamil Nadu
120+500 (Sembimadevi) in the project of Salem Ulundurpet
Section of NH-79 (Old NH-68) 79 0.92 EPC 4L PS 28/08/2023 Mr. P Sivaperumal

Permanent Rectification of BKS TN-02-574 By Constructing VUP at


Km.7.200 (Udayapatti) with Service road on BS, BKS TN-02-395 By
VUP at Km 13.320 (Ramalingapuram) with Service road on BS, BKS
TN-02-268 by Service road and FOB at Km 39.300
(Puthiragoundanpalayam), BKS TN-02-092 By Closing of median
713 Tamil Nadu
openings at Km. 40.760 & Km. 42.420 (Pethanaickenpalayam) and
providing pedestrian guard rail on BS, BKS TN-02-464
(Thalavaipatti Jn.) by Service road on BS, BKS TN-02-153
(Ottamparai Junction) by Service road on BS and BKS TN-02-320
(Ammampalayam) by Service road on BS in Salem - Ulundurpet
Section of NH-79 79 8.37 EPC 4L PS 16/01/2024 TPC Infra and Green Energies

714 Tamil Nadu 2L PS of Nagapattinam - Thanjavur from Km 1.600 to Km 16.690 &


Km. 29.850 to Km. 80.133 of Old NH-67 (New NH-83) 83 65.373 EPC 2L PS 05/05/2021 Om Sakthi Constructions - I.Vetrivel (JV)

Strengthening under One time Improvement of the stretches of


715 Tamil Nadu
Nagapattinam-Thanjavur Section from Km from km.1.600 to Item
Km.16.690 & Km.29.850 to Km.80.133 of old NH-67 (New NH-83) 83 54.875 Rate 2L 04/11/2022 Notch India Projects
Strengthening / Overlay of Thirumayam - Manamadurai section of Item
716 Tamil Nadu
NH-226 (New NH-36) 36 77.729 Rate 2L PS 04/06/2024 AVP Infracon Limited
Permanent Rectification of Black Spot TN-(02)-208 by VUP at Km.
717 Tamil Nadu 21.535 (Keezhkoothapakkam X Road) in Pondicherry –
Tindivanam section of NH-32 32 0.88 EPC 4L/6L 19/01/2023 VALAR & CO
Tamil
718 Nadu,Puducherr
y Viluppuram (Km.0.000) to Puducherry (Km.29.000) 332 29 HAM 4L 25/11/2021 Dilip Buildcon Ltd.
Tamil
719 Nadu,Puducherr
y Puducherry (Km.29.000) to Poondiyankuppam (Km.67.000) 32 38 HAM 4L 15/11/2021 Dilip Buildcon Ltd.
Tamil
720 Nadu,Puducherr Sattanathapuram to Nagapattinam from Km 123.800 to Km
y 179.555 32 55.755 HAM 4L 05/10/2020 Welspun Enterprises Ltd.
Construction of 6L VUP at Km. 213.350 at Gudihatnoor Village and
721 Telangana Minor Bridge at Km.194.480 on Nagpur – Hyderabad section of 44 1.02 EPC 6L 20/05/2023 Shivam Infra Tech Pvt. Ltd.
NH-44

Page 48 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Construction of 6-lane Vehicular Underpass (VUP) (1x30x5.5m) @
km. 282+600 (i.e., Kadthal Bypass) along with Service Roads under
722 Telangana MoRTH Identified Black Spot ID: TG-(02)-168 for the year 2015-18 NH-44 1 EPC 6L 15/10/2022 SVS Mookambika Constructions Pvt. Ltd
on Nagpur – Hyderabad section of NH-44 in the state of
Telangana on EPC mode
Improvement of Geometrics of Kalkallu to Gundla Pochanpalli
723 Telangana 44 17 EPC 4L/6L 24/01/2023 Lakshmi Infrastructure & Developers Pvt Ltd
from Km 454.00 to Km 471.00 of NH-44
MoRTH Identified Black Spot: TG-(02)-228 for the year 2015-18 on
724 Telangana Nagpur- Hyderabad Section of NH-44 in the state of Telangana on NH-44 1 EPC 6L 31/03/2022 Sri Balaji Constructions
EPC mode.
Construction of 6-lane Light Vehicular Underpass (LVUP) @ km.
410+325 (i.e., Japthishivnoor Village) along with Slip/ Service
725 Telangana Roads under MoRTH Identified Black Spot ID: TG-(02)-348 for the NH-44 1 EPC 6L 11/07/2022 R.K.Chavan Infrastructure Pvt. Ltd.
year 2015-18 on Nagpur – Hyderabad section of NH-44 in the
state of Telangana on EPC mode
6-lane Light Vehicular Underpass (LVUP) @ km.447+890 (i.e.,
Golden Dabha Y Junction) along with Slip/ Service Roads under
726 Telangana MoRTH Identified Black Spot ID: TG-(02)-229 for the year 2015-18 NH-44 1.05 EPC 6L 18/07/2022 RP Projects Pvt Ltd
on Nagpur – Hyderabad section of NH-44 in the state of
Telangana on EPC mode
6L VUP (1X20X5.5) at km.376.400 near Tekriyal and km.388.500
near Pondurthy X Roads under MoRTH Identified Black Spots ID:
727 Telangana 44 3.55 EPC 6L 01/11/2022 Srinivasa Laxmi Construction Co.
TG-(02)-010 and TG-(02)-094 on Nagpur – Hyderabad section of
NH-44
6L VUP (1x20x5.5m) @ km.364+020 at Padmajiwada Junction
728 Telangana along with Slip Roads under MoRTH Identified Black Spot ID: TG- 44 1.165 EPC 6L 01/11/2022 Srinivasa Laxmi Construction Co.
(02)-346 on Nagpur –Hyderabad section of NH-44
Implementation of Road Safety Measures on Nagpur – Hyderabad
Item
729 Telangana section from km.325+000 to km.450+000 (Length 125.000 km) of 44 125 4L PS 20/02/2024 S B Deshmukh
Rate
NH-44
6L of existing 4L from Gundlapochampally to Bowenpally from km
730 Telangana 44 10.031 EPC 6L 01/08/2022 Lakshmi Infrastructure & Developers Pvt Ltd
471.300 to km 481.331 of NH-44
Improvement of Geometrics of Thondupally to Kothur from Km Lakshmi Infrastructure & Developers India
731 Telangana 44 11.84 EPC 6L 18/03/2023
22.300 to Km 34.14 of NH-44 Pvt. Ltd.
Construction of 6-lane Underpasses (4 No’s) and Allied works on
Existing 4 Lane Hyderabad-Bangalore Section of NH-44 from Km
732 Telangana 89+000 to Km 124+000 in the State of Telangana on EPC Mode, as 44 6.21 EPC 6L 14/06/2024 MSR Constructions
part of Long-term Rectification of MoRTH Identified Black Spots
(TG-02-75, TG-02-97, TG-02-174 & TG-02-59).
Strengthening of existing stretch from Km 93/740 to 96/480
(Pitlam Bypass), Km 104/435 to 106/435 (PeddaKodapgal
733 Telangana KBypass), Km 131/0220 to 132/220 (Mainur KBypass) & Km
134/500 to 138/500 (Madnoor KBypass) on Sangareddy-Nanded- Item
Akola road of NH-161 161 9.94 Rate 2L 20/06/2023 K Yellaiah & Sons

Page 49 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

Strengthening of existing road from Km 66/785 to 68/370


734 Telangana
(Shankarampet Bypass) and Km 71/215 to 75/210 (Nizampet Item
Bypass) on Sangareddy-Nanded-Akola road of NH-161 161 4.82 Rate 2L 19/05/2023 Viajayasai Engineers and Developers Pvt Ltd.
Strengthening under one time improvement from Km 0/0 to
735 Telangana 10/975 (Sangareddy Bypass) on Sangareddy - Nanded - Akola road
of NH 161 in the state of Telangana 161 4.4 EPC 2L/4L 03/10/2023 UBS Infras Projects Pvt Ltd

736 Telangana 6L Access Controlled Greenfield Highway of Nandinne village to


Julekal village from Km 202.900 to Km 242.200 (Pkg-1) TBD 39.3 HAM 6L 04/01/2023 Megha Engineering and Infrastructure Ltd.

737 Telangana 6L Access Controlled Greenfield Highway of Julekal village to


Dinnedevarapadu village from Km 242.200 to Km 280.400 (Pkg-2) TBD 38.2 HAM 6L 04/01/2023 Megha Engineering and Infrastructure Ltd.
Strengthening under one time improvement existing road from Item
738 Telangana
Km.0.0 to 50.4 of NH-365BB 365BB 9.2 Rate 2L 21/08/2023 Kisan Projects Pvt. Ltd.
Khammam-Devarapalle Pkg I [4L Access Controlled (Greenfield)
739 Telangana from Thallampadu village to Somavaram village (Design Chainage
0+000 to 33+604)] 365BG 33.604 HAM 4L 31/10/2022 H.G. Infra Engineering Limited
Khammam-Devarapalle Pkg II [4L Access Controlled (Greenfield)
740 Telangana from Somavaram village to Chintagudem village (Design Chainage
33+604 to 63+117)] 365BG 29.513 HAM 4L 13/09/2022 H.G. Infra Engineering Limited
Khammam-Devarapalle Pkg III [4L Access Controlled (Greenfield)
741 Telangana from Chintagudem village to Recherla village (Design Chainage KMVPL Khammam Devarapalle Highway
63+117 to 105+236)] 365BG 42.119 HAM 4L 27/09/2022 Private Limited
Rectification of Blackspots of T Junction at Black Spot location TG-
02-365 KM 167.200 - 4 (Municipal Madarywada Junction) from
742 Telangana
(KM. 166.670 to KM. 168.325) on Armoor-Mancherial Section of
NH 63 63 1.655 EPC 2L/4L PS 19/05/2023 Srinivasa Laxmi Construction Co.

743 Telangana Rectification of Black Spots ID TG(02)-464, 356,135, 283 from Km.
93.000 to Km. 96.037 of NH 63 Nizamabad to Jagdalpur section 63 3.037 EPC 2L/4L PS 21/03/2023 Sree Sai Ram Enterprises
4L of Karimnagar-Warangal section from km 49.500 to km
744 Telangana
117.820 of NH-563 563 68.015 HAM 4L 18/07/2023 Dilip Buildcon Ltd.
Construction of 6L LVUP at Km. 59.825 (Wangapally-Motakonduru
745 Telangana Cross Road) along with Approaches & Service Roads on Yadgiri-
Warangal section of NH-163 163 0.7 EPC 6L 03/10/2023 Govin Buildtech Pvt. Ltd.

Four laning of NH-363 From Mancherial (Design Km. 0.00/ Existing


Km.251.900) To Repallewada (Design Km. 42.00/ Existing
746 Telangana
Km.288.510) DESIGN Length:42.00Km) In the State of Telangana
under NH(O) on Hybrid Annuity Mode-One Time Improvement Of
The Bypassed section of NH-363-2nd Call 363 7.289 EPC 2L/4L 11/12/2023 REAL Constructions.

4L Access Controlled Greenfield Highway section on NH-163G


747 Telangana (Warangal-Khammam) from Venkatpur village in Warangal District
at Design Ch. 150.240 Km to Thallasenkesa village in
Mahabubabed District at Design Ch. 189.650 km(Package-II) 163G 39.41 HAM 4L 19/04/2024 G R Infraprojects Limited

Page 50 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

748 Telangana 4L of Kodad (Design Km 0.00/Existing Km 185.00 of NH-65) to


Khammam (Design Km 31.800/Existing Km 29.400) of NH-365A 365A 31.8 HAM 4L 15/01/2022 Adani Road Transport Ltd.

Removal of At-Grade Junction and Construction of passenger


cross movement facility at 53+500 (Choutuppal Town) and at
Telangana,
749 128+460 (Tekumatla) and Long term Rectification of MoRT&H
Andhra Pradesh
Identified Black Spots (17 nos.) and allied works on existing
4-laning of Hyderabad-Vijayawada Section of NH-65 from Km
40.000 to Km 221.500 NH65 20 EPC 4L/6L 17/05/2024 Ram Kumar Contractor
Supervision of construction and Development works of Wayside Item
750 Uttar Pradesh NE-II 0.4 Others 10/06/2021 Reliance Infrastructure Ltd.
Amenities, at Km. 82.800 (LHS) & Km. 83.200 (RHS) NE2 Rate
6L Greenfield Kanpur - Lucknow (Expressway) Pkg II from km.
751 Uttar Pradesh NE-6 45.244 HAM 6L 10/11/2022 PNC Infratech Pvt. Ltd.
28.500 to km. 73.744
6L Elevated Kanpur - Lucknow (Exeressway) Pkg-1 from Km.
752 Uttar Pradesh NE-6 17.52 HAM 6L 01/02/2023 PNC Infratech Pvt. Ltd.
10+980 to Km. 28+500
Construction of 4L Connector from Delhi Meerut Expressway (Km APS Hydro Pvt. Ltd. - Mathiyan Construction
753 Uttar Pradesh 03 14.6 EPC 4L 30/03/2022
50.000 of Pkg IV) to Km 8.520 of NH-235 (Pkg-5) Pvt. Ltd. (JV)
Construction of LVUP on Six Laning of Agra-Etawah Bypass Section
754 Uttar Pradesh of Nh-2 from Km. 270.270 to Km. 270.830 and Construction of 19 0.56 EPC 6L 21/03/2023 Preeti Buildcon Pvt. Ltd.
Foot Over Bridge at Km. 274.055
Implementation of Road Safety Work on 6 Lane Agra - Etawah
Bypass section of NH-2 from Km. 215.000 to Km. 230.000 and Km.
755 Uttar Pradesh 1,919 30 EPC 6L 26/02/2024 The Shivam Enterprises
280+000 to 295+000 as per Crash Vulnerability Audit Report on
EPC Mode
Construction of Six Lane VUP (Single Box 12X5.5m with approach)
756 Uttar Pradesh 19 0.8 EPC 6L 19/01/2024 Vishesh Infrastructure Pvt. Ltd.
at Sachendi (Ch. 454.460)
Varanasi Ring Road (Pkg-II) connecting Sandaha Village (km 11.70
757 Uttar Pradesh 31 27.27 EPC 4L 15/02/2019 Gammon Engineers & Contractors Pvt. Ltd.
/ NH-29) with Revasa Village (km 818.80 / NH-2)
Construction of Ring Road around Kanpur from Km.000 to Km.
758 Uttar Pradesh TBD 23.325 EPC 6L 14/12/2023 RCL - PPIL JV
23.325 (Chachendi Sachendi I to Maharajpur) (Package-I)
HILLWAYS CONSTRUCTION COMPANY PVT.
6L of Agra Bypass (Northern) connecting Km. 174.500 of NH-2
759 Uttar Pradesh TBD 12.674 EPC 6L 25/02/2023 LTD. - VELJI RATNA SORATHIA INFRA PVT.
(new NH-19) to Km. 141.000 of Yamuna Expressways
LTD. (JV)
Implementation works of Agra Bypass from Km. 0.000 to Km.
760 Uttar Pradesh AB 32.8 TOT 4L 12/10/2023 SKS Infra Projects Pvt. Ltd.
32.800 connecting Km 176.8 of NH-2 to Km 13.03 of NH-3
Construction of left out portion of Agra Inner Ring Road
Baba Construction Private Limited in JV with
761 Uttar Pradesh connecting village Deori to NH-44 village Bad from Km. 0.000 to TBD 7.772 EPC 6L 20/03/2023
Shree Girrajjee Infra Heights Private Limited
Km. 7.772
Hardik Construction Company in JV with
Strengthening of existing 4L Ayodhya Bypass Section from design
762 Uttar Pradesh 27 22.42 EPC 4L 08/09/2023 New India Contractors And Developers
Km. 121+ 600 to Km. 144+020 of NH 28 (New NH 27)(Pkg-3)
Private Limited

Page 51 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
4L Green Field Northern – East side Gorakhpur Bypass (26.616
763 Uttar Pradesh Kms) starting from NH-29E (Chainage 83.308) and end at NH-28 NH-29E 26.616 EPC 4L 03/01/2024 Vijai Construction (India) Pvt. Ltd.
(Chainage 285.100)
2L flyovers at the junction of NH-28 and NH-28B at Kushinagar
J.K.Engicon Pvt. Ltd. Hathua Chhawani,
(Ch. 322.200) and at the junction of NH-28 and state MDR at
764 Uttar Pradesh 27 2.488 EPC 2L 02/08/2022 Chatardhari Bazar , Post Office-Bhagwan
Gopalgarh Tiraha (Ch. 325.750) on Gorakhpur-Kasya Section of
Bazar Chhapra, Bihar-841301
NH-28
Hapur Bypass -Moradabad including Hapur Bypass (km 50.00 - km
765 Uttar Pradesh
148.277) 9 99.86 BOT Toll 6L 28/05/2019 IRB Infrastructure Developers Ltd.
OSS Construction Pvt. Ltd. In JV WITH
766 Uttar Pradesh
4L Rampur Bypass from Km. 181.000 to Km. 189.500 9 10.19 EPC 4L 14/10/2022 SPETSDORSTORY LLC
Balance Work of Bareilly - Sitapur Section from km. 262.00 to km. Item Raj Corporation Ltd Siddharth Construction
767 Uttar Pradesh
419.590 30 58.75 Rate 4L 17/12/2019 & Jagdish Saran
Construction of balance 03 nos.Major/Minor Bridges at
Km.327.545, Km.411.105 & Km.415.865, 01no. of VUP at
768 Uttar Pradesh
Km.416.685 and 2-lane Cross-flyover at Km. 413.830 on existing
4L of Bareilly-Sitapur of NH-24 24 2.49 EPC 4L 23/02/2024 Jagdish Saran
Strengthening & overlay on intermittent locations of Old NH-
769 Uttar Pradesh Bareilly-Sitapur balance works section from Km. 262.000 to Km. 24(New NH- Item
419.590 of NH-30 30) 98.8 Rate 4L 12/02/2024 ATCON India Limited
Vehicular Underpass for rectification of Black Spot at Biswan-
770 Uttar Pradesh Sadan Tiraha on Lucknow-Sitapur Section (Km. 488.270 to Km.
413.200) of NH-24 24 0.87 EPC 4L 15/03/2024 Preeti Buildcon Pvt. Ltd.
Strengthening work of 4-lane stretch of Aligarh-Tappal-Palwal
771 Uttar Pradesh Section of NH- 334D from Km. 15.600 to Km. 75.492 in District – Item
Aligarh in the State of Uttar Pradesh 334 D 7.2 Rate 2L/4L 24/02/2023 G.R Engineers & Contractors
772 Uttar Pradesh DL/UP Border - EPE Crossing (Pkg-02) 709B 16.45 EPC 6L 11/05/2021 Gayatri Projects Limited
773 Uttar Pradesh Shamli Byapss- Saharanpur from km 92.2 to km 155.025 709B 62.77 EPC 4L 30/09/2019 Gawar Construction Ltd

774 Uttar Pradesh 6L full access control provisions in stretches from Saharanpur
bypass to Ganeshpur section of NH-344 (package-1) 344 13.89 EPC 4L/6L 03/07/2023 SHRI KRISHNA AND COMPANY

6L access Controlled Greenfield Highway from Gogwan Jalalpur


775 Uttar Pradesh
(Shamli) to Ranipur Barsi (Saharanpur) of Shamli -Ambala section
(Package-I) (Design Ch. Form km 00.600 to km 45.500) 344GM 44.9 EPC 6L 17/05/2023 Raj Shyama Constructions Pvt. Ltd.

776 Uttar Pradesh 4L Bypasses for Jagatpur, Babuganj, Unchahar, Alapur Bypass, and
Sai river bridge of Raebareli- Prayagraj section of NH-30 24B 24.185 EPC 4L 01/12/2022 R&C Infra - JPS (JV)

777 Uttar Pradesh Construction & upgradation of carriageway km 180.200 to


188.700 of Raebareli - Prayagraj section of NH-30 (Old NH-24B) 30 8.5 EPC 4L 08/05/2023 P. P Pandey Infrastructure Pvt. Ltd.
Widening of Raebareli to Prayagraj Section from Km. 82.650 to
778 Uttar Pradesh Km. 161.450 of NH-30 and Link road from Km. 161.450 to Km. Kaluwala Construction Private Limited -
641.350 (NH-2) 30 63.171 EPC 4L 22/12/2023 Nirmal Buildinfra Private Limited (JV)
Garhmukteshwar (km. 83.200 of NH-24) to Meerut (km. 9.860 of
779 Uttar Pradesh
NH-235) including connector to NH-119 709A 50.254 EPC 4L 10/10/2021 TATA Projects Ltd.

Page 52 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

780 Uttar Pradesh 4L Spur of Meerut-Garh-Mukteshwar section connecting NH-119 Dev Yash Projects & infrastructure Pvt Ltd-
and NH-58 bypassing Meerut Town of NH 709 A 709 A 13.4 EPC 4L 17/02/2023 Raj Shyama Constructions Pvt.Ltd(JV)
4L Spur of Panipat - Shamli connecting NH-709AD (Panipat –
781 Uttar Pradesh Shamli – Muzaffarnagar) and NH-709A (Karnal – Meerut) Brij Gopal Construction Co. Pvt. Ltd. -
bypassing Shamli district (UP) 709AD 8 EPC 4L 14/10/2022 Ramkey Infrastructure Ltd.(JV)
4L Spur of Shamli-MuzzafarNagar connecting NH-709AD (Panipat-
782 Uttar Pradesh Shamli-Muzaffarnagar) and NH-58 (Meerut - Roorkee) bypassing
Muffarnagar Town 709AD 10.5 EPC 4L 10/02/2023 Kaluwala Construction Private Limited
4L of Bareilly-Pilibhit-Sitarganj from Km. 0.000 to Km. 32.500 of
783 Uttar Pradesh
NH-30 (Pkg-1) 30 32.5 HAM 4L 14/03/2024 Raj Corporation Ltd.
784 Uttar Pradesh 4L of Sonauli - Gorakhpur 29 80 HAM 4L 06/03/2023 PNC Infratech Pvt. Ltd.

Construction of 211.880 m Major Bridge on well foundation over


785 Uttar Pradesh River Gomti on NH-128A (Parallel to Shastri Bridge) in Jaunpur city
on Engineering, Procurement & Construction (EPC) Mode in the
State of Uttar Pradesh. NH-128A 0.22 EPC 2L 07/09/2022 Brahma Construction
786 Uttar Pradesh
2L PS of Raebareli - Jagdishpur with 4L Jagdishpur Bypass Spur 330A 46.02 EPC 4L/2L PS 07/01/2022 SKS Infra Projects Pvt. Ltd.
Improvement and Up-Gradation of Existing Road to 2/4L PS from
787 Uttar Pradesh Km 40.000 to 88.750, start of Khutar bypass to start of SRSC Infra (P) Ltd.- Rajinder Infrastructure
Shahjahanpur bypass of NH 731(Pkg-I) 731 48.75 EPC 2L PS 03/02/2023 (P) Ltd. (JV)
Strengthening and improvement works of 2L Palia-Khutar Section
788 Uttar Pradesh of NH-731(Package-1A) from Km 0.00 to Km 40.00 in the State of Item Kaiser Constructions Engineers &
Uttar Pradesh 731 40 Rate 2L 04/03/2024 Contractors
Improvement and Up-Gradation of Existing Road to 4L PS from Km
789 Uttar Pradesh 123.650 to 175.080, from Start of Shahabad Bypass to End of
Hardoi bypass of NH 731 (Pkg-2B) 731 51.43 HAM 4L 20/11/2023 Raj Corporation Ltd.
Improvement and Up-Gradation of Existing Road to 4L PS from Km
790 Uttar Pradesh 175.080 to 229.070, from End of Hardoi Bypass to End of Hardoi
District of NH 731 (Pkg-3) 731 53.99 HAM 4L 07/01/2023 PNC Infratech Pvt. Ltd.
Improvement and Up-Gradation of Existing Road to 4L PS from Km
791 Uttar Pradesh 88.750 to 123.650, from Start of Shahjahanpur Bypass to start of
Shahabad bypass of NH 731(Pkg.-2A) 731 34.9 HAM 4L 19/01/2024 Raj Corporation Ltd.
Improvement and Up-Gradation of Existing Road to 4L PS from Km
792 Uttar Pradesh 229.070 to 260.800, End of Hardoi District to Lucknow Ring road R.P. INFRAVENTURE PVT. LTD. - SOBTI
of NH 731 (Pkg-4) 731 31.73 EPC 4L 24/10/2022 INFRATECH LTD. (JV)
4L from Mathura Bypass (Start) at Existing Km. 154.20 of NH-44 to
793 Uttar Pradesh
Gaju Village at Km 32.982 of NH-530B (Pkg-IB) 530B 32.982 HAM 4L 20/03/2023 PNC Infratech Pvt. Ltd.
6L Flyover with slip road along NH-44 at junction of NH 530B at
794 Uttar Pradesh start point - Km. 0.000 of Mathura Bypass at existing Km. 154.200
of NH-44 (Pkg-1A) 530B 1.46 EPC 6L 15/02/2023 Gawar Construction Ltd
4L from Gaju Village at Km. 32.982 to Devinagar Bypass (End) at
795 Uttar Pradesh
Km. 208.000 of NH-530B (Pkg-1C). 530B 33.018 HAM 4L 02/01/2023 PNC Infratech Pvt. Ltd.
Strenghtneing of existing Mathura Bareilly section of NH 530B
796 Uttar Pradesh (part of Package 1B) under jurisdiction of Mathura Vrinndavan Item
Development Authority 530B 8.55 Rate 4L 07/02/2024 Mathura Vrindavan Development Authority

Page 53 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor

4L from Devinagar Bypass (End) (Existing Km. 208.000 of NH


797 Uttar Pradesh
530B/Design Km. 66.000) to Kasganj Bypass (End) (Existing
Km.150.100 of NH 530B/ Design Km. 123.100) of NH 530B 530B 57.97 HAM 4L 06/06/2024 G R Infraprojects Limited
2L Major Bridge at Km. 412.130 & at Km. 533.00 of Ghazipur - Item
798 Uttar Pradesh
Balia - UP/Bihar section of Old NH-19 31 1.5 Rate 2L 11/03/2020 Mittal Brothers Engineers and Contractors
Special Repair and Maintenance of Chiraiya More (Barria) to
799 Uttar Pradesh Jayprabha Setu Section from Km 518.500 to Km 535.300 on NH- Item
31 (Pkg-3) 31 16.8 Rate 2L 03/02/2022 Jagdamba Enterprises
Construction of Four Lane Highway form Ghazipur- Ballia-
UP/Bihar State Border (Greenfield) section of NH-31: Package I
800 Uttar Pradesh
[from Hridaipur (km 0.000) to Shahapur (km 42.500)] on EPC
Mode in the state of Uttar Pradesh. NH-31 42.5 EPC 4L 03/07/2023 Ravi Infrabuild Projects Private Limited
Construction of Four Lane Highway from Ghazipur- Ballia-
UP/Bihar State Border (Greenfield) section of NH-31: Package II
801 Uttar Pradesh
[from Shahapur (km 42.500) to Pindari (km 78.150)] on EPC Mode
in the state of Uttar Pradesh. NH-31 35.65 EPC 4L 27/10/2023 Ravi Infrabuild Projects Private Limited
Construction of Four Lane Highway from Ghazipur- Ballia-
UP/Bihar State Border (Greenfield) section of NH-31: Package III
802 Uttar Pradesh
[from Pindari (km 78.150) to Rawalganj Bypass (Km 117.120)] on
EPC Mode in the state of Uttar Pradesh. NH-31 38.97 EPC 4L 29/08/2023 NKC Projects Private Limited
Construction of Four Lane Highway from Ghazipur- Ballia-
UP/Bihar State Border (Greenfield) section of NH-31: Package IV
803 Uttar Pradesh
[from Buxur Spur of length km 17.270 on EPC Mode in the state of
Uttar Pradesh. NH-31 17.27 EPC 4L 15/06/2023 BCPL-PRL (JV)
Construction of 30m Minor Bridge with Pile Foundation over
804 Uttar Pradesh Kathal Nallah at Km. 483.810 of NH-31 (Ghazipur-Ballia) in Ballia Item
City 31 0.03 Rate 2L 19/03/2024 J. K. Engicon Pvt.Ltd.
Repair and Maintenance of stretch from JN with NH-28 near
805 Uttar Pradesh Azamgarh and connecting Mau, Teekha and terminating Near Item
Phephna NH-128B 104.57 Rate 2L PS 26/02/2024 R R Infraa Construction
Varanasi Gorakhpur Section Packege IV from km. 149.540 to km.
806 Uttar Pradesh
215.160 (Mau-Gorakhpur) 24 65.62 EPC 4L 10/04/2017 Jaiprakesh Associates Ltd.
4L (Greenfield) Western Side spur of Rampur-Rudrapur Section
807 Uttar Pradesh from Km 0.000 to Km 13.700 connecting NH-24 to NH-87 Dev Yash Projects and Infrastructure Pvt.
bypassing rampur town - 13.7 EPC 4L 02/05/2023 Ltd. - Raj Shyama Constructions Pvt. Ltd. (JV)
Meerut - Najibabad from km. 39.24 to km. 86.59 of NH-119 (Pkg-
808 Uttar Pradesh
II) 119 39.56 HAM 4L 20/05/2024 Gawar Construction Ltd
809 Uttar Pradesh Muzzafarnagar - Miranpur 709AD 27.25 EPC 4L 04/04/2022 RCC Developers Ltd.
APS Hydro Pvt. Ltd. - Mathiyan Construction
810 Uttar Pradesh
Bijnor-Kotawali 709AD 21.68 EPC 2L PS 01/11/2021 Pvt. Ltd. (JV)
4L of Moradabad-Thakurdwara-Kashipur Section from Km. 0.000
811 Uttar Pradesh
to Km. 38.77 of NH-734 (Pkg-II) 734 38.77 EPC 4L 15/03/2024 Raj Corporation Ltd.

Improvement & Up-gradation of NH-734 Section of Moradabad-


812 Uttar Pradesh Thakurdwara –Kashipur including Moradabad & Kashipur Bypasse
Package-III : Kashipur Bypass (Length =14.490 Km.), Starts from Raj Corporation Ltd. & PRL Projects
Ch. 38+770 and ends at Ch. 53+260 (existing Ch. 05+560 734 14.49 EPC 4L 15/03/2024 Infrastructure Limited (JV)

Page 54 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
4L of Moradabad western side spur connecting NH-734 & NH-24
813 Uttar Pradesh
from Km. 0.000 to Km. 33.200 (Pkg-I) 734 33.724 EPC 4L/6L 19/09/2023 KCC Buildcon Pvt. Ltd.

4L Prayagraj Greenfield By-pass from design Km 50+860 (near Nibi


814 Uttar Pradesh
Kala Uperhar) to design Km 64+763 on NH-19 (near Khodaypur Joint Stock company Buer(JSC BUER) - oss
Kasgaon) including Interchange loop at NH-19 RING ROAD 14.98 EPC 4L PS 28/12/2023 Construction Private Ltd.(JV)
4 Lane Inner Ring Road around Allahabad City Pkg-2 (Prayagraj
815 Uttar Pradesh
Southern Bypass 43.200 - 50.860) RING ROAD 7.66 EPC 4L PS 19/12/2023 GPT Infra Projects Ltd.
6L access control Greenfield highway of Vill-Khyawari to Vill-
816 Uttar Pradesh Latifpur at Saharanpur Bypass from Km. 82.000 to Km. 119.790
(Pkg-4) TBD 37.79 EPC 4L 02/09/2022 Krishna Constructions.

817 Uttar Pradesh 6L access control Greenfield highway of Vill-Lohadda to Vill-


Karaunda Mahajan from Km. 27.000 to Km. 56.500 (Pkg-2) TBD 29.5 EPC 4L 02/09/2022 Krishna Constructions.

818 Uttar Pradesh 6L access control Greenfield highway of Vill-Karaunda Mahajan to Shiv Build India Pvt. Ltd. - Jandu
Vill-Khyawari from Km. 56.500 to Km. 82.000 (Pkg-3) TBD 25.5 EPC 4L 02/09/2022 Construction India Pvt. Ltd. (JV)

819 Uttar Pradesh 6L access controlled Greenfield highway of Junction of EPE (Vill.-
Mavikalan) to Vill.-Lohadda from Km. 0.000 to Km. 27.000 (Pkg-1) TBD 27 EPC 4L 02/09/2022 Raj Shyama Constructions Pvt. Ltd.
Uttar Pradesh, 4-laning of Pilibhit - Sitarganj from Km. 32.500 to Km. 70.800 (Pkg-
820
Uttarakhand 2) of NH-30 30 38.3 HAM 4L PS 14/03/2024 Raj Corporation Ltd.
6L access-controlled highway from (Ganeshpur) to(near Mohand)
821 Uttarakhand of Ganeshpur – Dehradun section from Km.0 to Km.8.3 of NH-
72A (Package-1) 72A 8.13 EPC 6L 07/10/2021 Vasishta Constructions Pvt. Ltd.
6L of access-controlled highway from Mohand to Daat kali Tunnel
822 Uttarakhand of Ganeshpur – Dehradun section from Km.8.30 to Km.16.380 of Ram Kumar Contractor - Bharat
NH-72A (Package-2) 72A 8.25 EPC 6L 07/10/2021 Construction India Pvt. Ltd. (JV)
6L access-controlled highway of Daat kali Tunnel - Dehradun of
823 Uttarakhand Ganeshpur – Dehradun section from km.16.380 to km.19.785 of
NH-72A (Package-3) 72A 3.405 EPC 6L 01/04/2022 KRC Infraprojects Pvt. Ltd.
6L with access control provision Saharanpur bypass to Ganeshpur
824 Uttarakhand section from 13.89 Km to 41.820 Km of Delhi- Dehradun OJSC Euro-Asian Construction Corporation
Economic Corridor (package-2) 3,44,307 27.93 EPC 4L/6L 04/11/2022 (Evrascon) JV with Pawan Kumar

Construction of 4-lane connectivity to Banbasa ICP at India Nepal


825 Uttarakhand border from NH-09 (old NH-125) (Sitarganj-Tanakpur) at Km 40.00
near Jagbuda bridge under Bharatmala Priyojana of NH-109D on
EPC mode in the State of Uttarakhand 109D 4.6 EPC 4L 03/03/2023 SHREE RIDDHI SIDDHI BUILDWELL LIMITED
4L of Haridwar-Nagina section from km. 0.00 to km. 71.614 of NH-
826 Uttarakhand
74 34 & 734 71.61 EPC 4L 24/01/2018 Corsan Corviam Construction SA
4L of Haridwar – Nagina section (Design Ch. LME from km 13.829
to km 17.110 & km 26.077 to km 27.508 and Design Ch. RME
827 Uttarakhand
from km 13.839 to km 17.120 & km 26.078 to km 27.509) of EUP
mitigation measures on NH74 734 4.7 EPC 4L 31/08/2022 Ashok kumar
One-Time Improvement and Maintenance of the existing NH Item
828 Uttarakhand
section 74 (Kashipur) bypassed by Kashipur Bypass 74 25.541 Rate 2L 23/06/2021 State PWD

Page 55 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
One-Time Improvement and Maintenance of the existing section Item
829 Uttarakhand
of NH 74 (Jaspur) bypassed by Jaspur Bypass 74 10.849 Rate 2L 23/06/2021 State PWD

830 Uttarakhand Upgradation and 4L of Haridwar Bypass from Km 0.000 (Km


188.100 of NH-58) to Km. 15.100 (Km 5.100 of NH 74) (PKg-1) TBD 15.1 HAM 4L 31/10/2022 IRCON International Limited

831 Uttarakhand One-Time Improvement and Maintenance of the existing section Item
of NH 58 (Roorkee city) bypassed by Roorkee Bypass (NH-58) 58 12.995 Rate 2L 24/12/2020 State PWD
832 Uttarakhand 2L PS of Khatima bypass from km 24+720 to km. 32+975 9 8.26 EPC 2L PS 21/07/2021 APS Infra
One Time Improvement and Maintenance of existing NH-73 Item
833 Uttarakhand
(Roorkee city) bypassed by Roorkee Bypass (NH-73) 73 6.6 Rate 2L 14/03/2022 State PWD

Balance works of 4-Lanning of Rampur-Kathgodam Section of NH-


834 Uttarakhand
87 (New NH No. 09) from Km. 0.000 (Km 190.000 of NH-24) to Km KCC Buildcon (P) Ltd.- HRY Kundu Buildtech
42.791 (design Chainage Km 43.446) (Package-I) 09 6.07 EPC 4L 17/02/2023 (P) Ltd. (JV)
Construction of Rudrapur Bypass Section from Km. 0.000 to
835 Uttarakhand
20.640 in the state of Uttar Pradesh & Uttarakhand TBD 20.64 HAM 4L 12/01/2024 Gawar Construction Ltd
HILLWAYS CONSTRUCTION COMPANY PVT.
836 Uttarakhand 4L of Najibabad Bypass from Km. 105.423 to Km. 118.373 LTD. - VELJI RATNA SORATHIA INFRA PVT.
(excluding 2.45 Km. of NH-74 Bypass) of NH-119 119 10.5 EPC 4L 20/12/2022 LTD. (JV)
2L PS of Najibabad Kotdwar section from 112.575 to Km. 138.635
837 Uttarakhand
of NH 119 119 15.56 EPC 2L PS 06/03/2024 AJAY PRAKASH ASSOCIATES
4L Poanta Saheb–Mednipur from Km. 435.65 to km. 458.65 of NH-
838 Uttarakhand
07(Pkg-1) 07 18.7 HAM 4L 01/05/2023 Ram Kumar Contractor
4L Medinipur to Ballupur from Km. 458.65 to Km. 487.65 of NH-
839 Uttarakhand
07(Pkg-2) 07 26.1 HAM 4L 18/02/2023 MKC Infrastructure Ltd.
4/6L of Spur to Haridwar (Greenfield) from Km. 0.000 to Km.
840 Uttarakhand
50.70 TBD 50.7 HAM 4L/6L 20/02/2023 Krishna Constellation Pvt. Ltd.
Construction of Pedestrian Underpass (PUP), Box Culvert (BC),
Minor Bridge (MNB) and other Road Works From Km. 34.510 to
841 West Bengal 16 0.59 EPC 4L 05/10/2021 K K Narsaria Construction
Km. 35.100 near Vellora Chawk on Balasore - Kharagpur Section
of NH-60(New NH-16)
842 West Bengal Barwa Adda (Km. 398.240) to Panagarh (Km. 521.120) 19 122.88 BOT Toll 6L 01/04/2014 IL&FS Transportation Networks Ltd.
843 West Bengal 6L of Palsit-Panagarh from Km. 521.120 to Km. 588.870 of NH-19 19 67.75 BOT Toll 6L 02/04/2022 Adani Road Transport Ltd.
844 West Bengal 6L of Palsit - Dankuni from Km 588.870 to Km 652.700 19 63.83 BOT Toll 6L 02/04/2022 IRB Infrastructure Developers Ltd.
Avenue and Median Plantation by Forest Dept. Govt. of WB along
845 West Bengal Dalkhola - Ghoskpukur (NH-31) and Salsalabari - AS/WB Border
(NH-31C) 31 and 31 C 125.87 EPC 4L
6L Elevated Kona Expressway from Km. 0.145 to Km. 7.337 of NH-
846 West Bengal
117 117 7.192 EPC 6L 06/06/2024 Rail Vikas Nigam Limited
Four Laning of Bal. Works of Barasat-Krishnagar from km. 48.553
847 West Bengal
to km. 115.272 12 66.72 EPC 4L 31/08/2020 KCC Buildcon Pvt. Ltd.
4 laning of Barasat - Barajaguli Section of NH-12 from Km. 31.000
848 West Bengal
to Km. 48.679 in the district of North 24 - Parganas 12 17.679 EPC 4L 12/08/2024 Mukherjee Associates Infra (P) Ltd.

Page 56 of 57
Total Appointed Date/Start
Sr. No. State Project Name NH(New) Mode Lanes Concessionaire
Length Date- Contractor
Development to 4-laning of the de-scoped stretches from Km
115.342 to Km 191.700 of NH-34 in Nadia District (3.962) &
849 West Bengal Murshidabad District (5.538) pertaining to Krishnagar to
Berhampore section of NH-34 (New NH-12) , in the state of West
Bengal under NH(O). 12 10.554 EPC 4L 16/07/2024 Mukherjee Associates Infra (P) Ltd.
Bridge over Ganga River at d/s of Farraka Barrage including
850 West Bengal
Approaches connecting Farakka-Raiganj 12 5.47 EPC 4L 20/12/2018 CQCE - RKEC (JV)
2L PS of JH / WB Border (km. 70.524) - Purulia (km.84.400) &
851 West Bengal Purulia (km. 94.30) - Chandil (Junction with NH-33) (km. 153.705)
of Old NH-32 18 73.28 EPC 4L/2L PS 12/12/2019 Dineshchandra R. Agrawal Infracon Pvt. Ltd.
4L of Purulia Bypass section from Km 84.030 to Km 94.345 of NH-
852 West Bengal
32 32 10.315 EPC 2L PS 05/02/2022 Varaha Infra Ltd.
Construction of Service Road on both sides of Belghoria
853 West Bengal Expressway (NH-2E) from Km. 0.000 to Km. 1.750, (b) Km, 2.835 Item
to Km. 2.900 and (C) Km. 4.250 to Km. 4.900 2-E 2.465 Rate 2L 07/11/2022 Vaisno Construction

Page 57 of 57