Masjid e Yousuf Foundation
Masjid e Yousuf Foundation
NOTE: ALL OUTER WALLS 9" THICK AS SHOWN IN ARCH. PLAN, SHOULD BE IN NOTE: ALL COLUMNS UP TO PLINTH BEAM WILL BE 12" or 15" 1. GRADE OF CONCRETE MIX SHALL BE AS FOLLOWS:
LIGHT WT. KILN DRY RED CLAY BRICKS. THERE ARE NO PARTITION WALLS WIDE EXCEPT LIFT COLUMNS AS SHOWN IN SECTIONAL DET.
No top mesh
42
1"
6. REINFORCEMENT SHALL BE HIGH STRENGTH.
42
F2 4'-6"X4'-6"X4" 4'-0"X4'-0"X12"X18" 12 tor @ 6"C/C 12 tor @ 6"C/C AS PER PLAN CONFIRMING TO IS : 1786 - 1985.
1"
F4 5'-6"X5'-6"X4" 5'-0"X5'-0"X12"X18" REGULAR FOOTING COLUMNS : 40mm
72
BEAMS : 25mm
B PLOT
1"
1'-12
C4
1"
42 F5 6'-6"X6'-6"X4" 6'-0"X6'-0"X12"X18" 12 tor @ 5"C/C 12 tor @ 5"C/C REGULAR FOOTING Pedestal 15"x24"
8.
SLAB : 15/20mm
LAP LENGTH OF BARS FOR TENSION &
BOUNDARY F1 C2/F2 F6 4'-9"X4'-9"X4" 4'-6"X4'-6"X12"X18" 12 tor @ 6"C/C 12 tor @ 6"C/C REGULAR FOOTING
COMPRESSION AS FOLLOWS :
C4/F6
F7 4'-9"X7'-9"X4" 4'-6"X7'-3"XFLAT 12 tor @ 6"C/C 12 tor @ 6"C/C COMBINE FOOTING No top mesh DEVELOPMENT LENGTH OF BARS FOR Fe-415 GRADE
10'-9"
IN TENSION IN COMPRESSION
DIA M-20 M-25 M-30 M-35 DIA M-20 M-25 M-30 M-35
1"
10 mm 550 475 435 385 10 mm 450 375 350 310
42
42
1"
1" 101" 1" 41"
42
42 2 102 2
12 mm 650 575 520 460 12 mm 525 450 415 370
C
16 mm 875 750 695 615 16 mm 700 600 555 490
1"
1"
1"
25 mm 1375 1175 1080 955 25 mm 1100 950 865 765
102
72
72
32 mm 1730 1485 1385 1220 32 mm 1385 1190 1110 980
9"
8 tor @ 6"C/C 10. LAPPING AT COLUMN BEAM JUNCTIONS SHALL
12"
8 tor @ 6"C/C BE AVOIDED
RING SIZE 7"X7"
39'-0"
1"
6 nos 12 TOR
72
1"
42 1"
1'-12 14. CONCRETE SHALL BE MACHINE MIXED AND VIBRATED
COLUMN
D C2/F2
4 nos 12 TOR
AS PER SECTION DETAIL 15. MAX. WATER CEMENT RATIO USED SHALL BE LIMITED
TO 0.50 FOR SLAB, BEAMS, COLUMNS.
2'-9"
1"
E C2 1"
72 1"
42 15"
8 tor @ 6"C/C
RING SIZE 7"X12"
WITH THE SPECIAL PERMISSION OF CONSULTANTS
17. ALL COVER SHALL BE ENSURED BY PRECAST
18"
D.tprd
20. STRICTLY FOLLOW THE STRUCTUAL DRAWINGS
PLOT BOUNDARY C3 REINFORCEMENT AS PER SCHEDULE OTHER WISE WE WILL NOT RESPONSIBLE FOR ANY
ANY KIND OF DAMMAGE TO THE BUILDING
9" M-20
D.st
REINFORCEMENT AS PER SCHEDULE
SPECIFIC NOTES
M-20 C.C.BED. 1 : 4 : 8. 1 FOUNDATION IS DESIGNED FOR G+1 FLOORS ONLY
6"
F 1" 1" 1" 1"
(1: 1½ :3)
C4 8 tor @ 6"C/C
RCC
2
3
S.B.C IS ASSUMED AS 200KN/SQM(subjected to change as per site condition)
DEPTH OF EXCAVATION SHOULD BE 5'-0" FROM LOWEST
1"
REV DATE: R2 - R3 -
RING SIZE 10"X12"
DRAWN: CHECKED: DEALTH: APP. :
RCC
(1: 1½ :3)