0% found this document useful (0 votes)
64 views1 page

Masjid e Yousuf Foundation

Uploaded by

Syed Khadar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views1 page

Masjid e Yousuf Foundation

Uploaded by

Syed Khadar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTES :-

NOTE: ALL OUTER WALLS 9" THICK AS SHOWN IN ARCH. PLAN, SHOULD BE IN NOTE: ALL COLUMNS UP TO PLINTH BEAM WILL BE 12" or 15" 1. GRADE OF CONCRETE MIX SHALL BE AS FOLLOWS:
LIGHT WT. KILN DRY RED CLAY BRICKS. THERE ARE NO PARTITION WALLS WIDE EXCEPT LIFT COLUMNS AS SHOWN IN SECTIONAL DET.

1 2 3 4 * FOOTINGS M20 with minimum cement content of 320Kg/Cum


* COLUMNS M20 with minimum cement content of 320 Kg/Cum
2. GRADE OF CEMENT
JAYPEE / ULTRA TECH /AMBUJA / BIRLA /CORMANDAL
33'-6" SCHEDULEOF FOOTINGS 3. PEDESTAL HEIGHT MINIMUM 300mm &
SIZE IN MM MAXIMUM 3 TIMES LEAST LATERAL DIMENSION.
1'-6" 32'-0" STEEL IN STEEL IN
MARK PIT SIZE/PCC FOOTING SIZE REMARKS 4. BARS DIAMETER 16mm & ABOVE SHOULD BE Fe 500
1"
42 15'-0" 9'-6" 6'-9" 1"
42 LXWXD L X W X Dst X Dtprd SHORT SPAN LONG SPAN
5. ALL BARS OF DIAMETER BELOW 16 mm SHOULD BE
F1 5'-0"X6'-3"X4" 4'-6"X6'-0"X24" FLAT 12 tor @ 6"C/C 12 tor @ 6"C/C COMBINE FOOTING DEFORMED BARS OF GRADE Fe 415
1"

No top mesh
42

1"
6. REINFORCEMENT SHALL BE HIGH STRENGTH.

42
F2 4'-6"X4'-6"X4" 4'-0"X4'-0"X12"X18" 12 tor @ 6"C/C 12 tor @ 6"C/C AS PER PLAN CONFIRMING TO IS : 1786 - 1985.

A 12 tor @ 6"C/C 12 tor @ 6"C/C 7. CLEAR COVER TO REINFORCEMENT AS FOLLOWS :


2'-0"

1" 1" C1 F3 3'-9"X5'-6"X4" 3'-6"X5'-0"X12"x18" SHOE FOOTING


42 1'-12 FOOTINGS : 50mm
12 tor @ 6"C/C 12 tor @ 6"C/C

1"
F4 5'-6"X5'-6"X4" 5'-0"X5'-0"X12"X18" REGULAR FOOTING COLUMNS : 40mm

72
BEAMS : 25mm
B PLOT
1"
1'-12
C4
1"
42 F5 6'-6"X6'-6"X4" 6'-0"X6'-0"X12"X18" 12 tor @ 5"C/C 12 tor @ 5"C/C REGULAR FOOTING Pedestal 15"x24"
8.
SLAB : 15/20mm
LAP LENGTH OF BARS FOR TENSION &
BOUNDARY F1 C2/F2 F6 4'-9"X4'-9"X4" 4'-6"X4'-6"X12"X18" 12 tor @ 6"C/C 12 tor @ 6"C/C REGULAR FOOTING
COMPRESSION AS FOLLOWS :
C4/F6
F7 4'-9"X7'-9"X4" 4'-6"X7'-3"XFLAT 12 tor @ 6"C/C 12 tor @ 6"C/C COMBINE FOOTING No top mesh DEVELOPMENT LENGTH OF BARS FOR Fe-415 GRADE
10'-9"

IN TENSION IN COMPRESSION

GRADE OF CONCRETE GRADE OF CONCRETE

DIA M-20 M-25 M-30 M-35 DIA M-20 M-25 M-30 M-35

8 mm 450 375 350 305 8 mm 350 300 280 245


1"

1"
10 mm 550 475 435 385 10 mm 450 375 350 310
42

42

1"
1" 101" 1" 41"

42
42 2 102 2
12 mm 650 575 520 460 12 mm 525 450 415 370

C
16 mm 875 750 695 615 16 mm 700 600 555 490

20 mm 1100 950 865 765 20 mm 875 750 695 610


4 nos 12 TOR 6 nos 12 TOR

1"
1"

1"
25 mm 1375 1175 1080 955 25 mm 1100 950 865 765

102
72

72
32 mm 1730 1485 1385 1220 32 mm 1385 1190 1110 980

9. LAPS SHALL BE STAGGERED


C5/F5 C5/F5 C3/F3

9"
8 tor @ 6"C/C 10. LAPPING AT COLUMN BEAM JUNCTIONS SHALL

12"
8 tor @ 6"C/C BE AVOIDED
RING SIZE 7"X7"
39'-0"

AS PER SECTION DETAIL 11. WORK SHALL BE IN ACCORDANCE WITH


RING SIZE 7"X12"
14'-6"

IS : 456 LATEST PRINT


C1 AS PER SECTION DETAIL
12. WHERE CEMENT CONSUMPTION IS GREATER THAN
100 BAGS CUBES TEST ARE TO BE DONE, THERE
9" C2 SHALL BE ONE SET OF 3 CUBES /EVERY 20 Cu. M.
OF CONCRETE OR PART OF THERE OF USED AT
M-20 9" SITE AND SHALL BE TESTED ON 7th. / 28th. DAY
C4/F4 C2/F2 (1: 1½ :3) M-20 13. AT JUNCTION OF TWO ELEMENTS OF DIFFERENT
CONCRETE MIXES THE COMMON CONCRETE
C4
(1: 1½ :3) SHALL BE DONE WITH RICHER MIX

1"
6 nos 12 TOR
72
1"
42 1"
1'-12 14. CONCRETE SHALL BE MACHINE MIXED AND VIBRATED
COLUMN
D C2/F2
4 nos 12 TOR
AS PER SECTION DETAIL 15. MAX. WATER CEMENT RATIO USED SHALL BE LIMITED
TO 0.50 FOR SLAB, BEAMS, COLUMNS.
2'-9"

1"

1" 1" 16. CHIPPING OF ANY STRUCTURAL CONCRETE ELEMENTS


42

F7 1'-12 42 4 nos 16 TOR SHALL NOT BE DONE ANY CIRCUMSTANCES UNLESS

E C2 1"
72 1"
42 15"
8 tor @ 6"C/C
RING SIZE 7"X12"
WITH THE SPECIAL PERMISSION OF CONSULTANTS
17. ALL COVER SHALL BE ENSURED BY PRECAST

12" Min. 3"


COVER BLOCKS MADE UP C.M. 1 : 1
PEDESTAL
AS SHOWN IN FOOTING LAYOUT 18. DO NOT SCALE THE DWG. FOLLOW WRITTEN DIMNSIONS ONLY

Depth up to hard soil.


19. ANY DISCRIPANCY SHALL BE BROUGHT TO THE
8'-3"

C2/F2 C2/F2 NOTICE OF THE CONSULTANTS

18"

D.tprd
20. STRICTLY FOLLOW THE STRUCTUAL DRAWINGS
PLOT BOUNDARY C3 REINFORCEMENT AS PER SCHEDULE OTHER WISE WE WILL NOT RESPONSIBLE FOR ANY
ANY KIND OF DAMMAGE TO THE BUILDING
9" M-20

D.st
REINFORCEMENT AS PER SCHEDULE
SPECIFIC NOTES
M-20 C.C.BED. 1 : 4 : 8. 1 FOUNDATION IS DESIGNED FOR G+1 FLOORS ONLY

6"
F 1" 1" 1" 1"
(1: 1½ :3)
C4 8 tor @ 6"C/C
RCC
2
3
S.B.C IS ASSUMED AS 200KN/SQM(subjected to change as per site condition)
DEPTH OF EXCAVATION SHOULD BE 5'-0" FROM LOWEST
1"

42 72 72 42 RING SIZE 7"X15" 3" 3" NATURAL GROUND LEVEL


8 nos 16 TOR
42

9" 3" 4 CURING SHALL BE DONE FOR 21 DAYS.

M-20 TITLE: PROPOSED MASJID


REINFORCEMENT AS PER SCHEDULE
(1: 1½ :3) CLIENT/OWNER: _____________________________________
MASJID- E- YOUSUF

8 tor @ 6"C/C START DATE: 01-12-2023 DWG. NO:


15"

REV DATE: R2 - R3 -
RING SIZE 10"X12"
DRAWN: CHECKED: DEALTH: APP. :
RCC

FOUNDATION AND EXCAVATION LAYOUT CLASSIC


CONSULTING
C5 CLASSIC CONSULTING ASSOCIATES ASSOCIATES
ARCHITECTURAL AND STRUCTURAL CONSULTANTS
e mail: classic consulting [email protected]
12" 3" MD.MAJID HUSSAIN
M-20 ASSOCIATE ENGINEER
Cell: +91 9966929603

(1: 1½ :3)