0% found this document useful (0 votes)
88 views1 page

Product Capacity Verification

Uploaded by

rakeshparia24
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views1 page

Product Capacity Verification

Uploaded by

rakeshparia24
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

CAPACITY VERIFICATION

9195 158 Run@Rate


Part Number 17636/19515817668 Date 14.11.2024
SM780X US LED29S 857
PSU W5L120 OD WH/
SP780X U LED26S 857
PSU W5L120 OD WH
Supplier
Part Description Name Janaki Engering & Trd.Co.
Supplier
15,000
Philips Annual Capacity Planning Volume pcs/year Location Howrah (W.B)

Process Step STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6


Process Description
Units
Working hours/shift hours 10.0 10.0 10.0
Working Standards

Shifts/ day shifts 1 1 1


I - Supplier

Days/ week days 6 6 6


Weeks/ year weeks 50 50 50
Total hours/year hours 3000 3000 3000

% of line for XXX parts (Allocation %) % 85% 89% 88%


II - Supplier Capacity Data

Quoted Production Rate (part # item 1) pcs/hour 35.0 35.0 35.0


Quoted % scrap % 0.5% 0.5% 1%
Quoted % line efficiency % 79% 80% 85%
Adjusted production rate pcs/hour 28 28 29
Available capacity pcs/year 70,155 74,386 77,755
Utilization % % 21% 20% 19%
Bottleneck operation X X

Trial run duration hour 12.00 12.00 12.00


Total parts produced pcs 100 100 100
Number of bad parts pcs 0 2 3
III - RUN@RATE Results

First time capability % % 100.00% 98.00% 97.00%


Number of good parts pcs 100 98 97
Net output pcs/ hour 8 8 8
Takt Time Rate (Target) pcs/ hour 6 6 6
Downtime hour
Reason text
Run-Off utilization % % 70.6% 68.8% 70.3%
Bottleneck operation X X
The RUN@RATE results are acceptable and meet Philips capacity Overall
planning volume requirements: Overall Process Status Auditor Information
The attached capability study results meet XXX requirements: Utilization % Name: R.Paria

Janaki Engering
Corrective actions are required: Date: 70.59% Acceptable Company: & Trd.Co.
New production readiness trial run is
required: Date: Location: Howrah (W.B)