Earned Value

Msp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

Earned Value

Msp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

EAC ACWP BCWP

EARNED VALUE $223,000.0 $62,800.00 $62,800


Earned value management helps you quantify the performance of a
project. It compares costs and schedules to a baseline to determine if
the project is on track.

If the charts don't look right, make sure you have set a baseline,
0 EARNED VALUE OVER TIME
assigned costs to tasks or resources, and entered progress. $80,000.00
The project’s earned value based o
$70,000.00 actual cost (ACWP) is higher than e
then the project is over budget. If
$60,000.00 is higher than earned value, then th
schedule.
$50,000.00

$40,000.00
Learn more about earned value
$30,000.00

$20,000.00

$10,000.00

$0.00
'24 '24 '24 '24 '24 '24 '24 '24 '24 '24 '24

ACWP BCWP BCWS

VARIANCE OVER TIME


$5,000.00 Cost and schedule variances for the
$4,000.00 status date. If CV is negative then,
budget. If SV is positive then the p
$3,000.00 schedule in cost terms.
$2,000.00
$1,000.00
$0.00
'24 '24 '24 '24 '24 '24 '24 '24 '24 '24 '24
-$1,000.00
-$2,000.00
-$3,000.00
-$4,000.00
-$5,000.00

CV SV

INDICES OVER TIME


1.2 Cost and schedule performance ind
date. The greater the performance
1 saving the project.

0.8

0.6

0.4

0.2

0
'24 '24 '24 '24 '24 '24 '24 '24 '24 '24 '24

SPI CPI
0.00
on the status date. If
earned value (BCWP),
planned value (BCWS)
he project is behind

e project based on
, the project is over
project is ahead of

dices for the project based on status


e index, the more on schedule and cost