AESD
AESD
Instruction
Contents
Page 2 of 18
$42201170
Hangzhou
Funstar
1 General
1.1 Introduction
Page 3 of 18
$42201170
Hangzhou
Funstar
Table 1
Note: 2KVA means signal-phase output power 400VAC, From any two phase
among the L1S, L2S and L3S.
Other 3-phase 3*400VAC output power which provided from 3-phase
LV1, LV2 and LV3.
2 Principle
4V
C2D
DC0V
Figure 1
Please find the attached drawing of main circuit and control circuit in
the Appendix 1 and Appendix 2.
Page 4 of 18
$42201170
Hangzhou
Funstar
Figure 2
Running indicator
Figure 3
Page 5 of 18
$42201170
Hangzhou
Funstar
In the following figure, the left part of the figure is the battery box, the right
part of the figure is the AESD. The appearance figure as the Figure 4 ,Figure
45shows:
Figure 4 Figure 5
Note: There is some information on the nameplate such as: trade mark,
name, type, voltage, power, frequency, weight, production date,
bar code, origin and so on.
Page 6 of 18
$42201170
Hangzhou
Funstar
Installation
Illustration
A Hanger
225
810
950
Support
Note:
Observe different A
shape and installation
of hanger and support
Figure 6
Page 7 of 18
$42201170
Hangzhou
Funstar
Please switch off the air circuit breaker FU1、FU2 and switch on the
device switch to the position of “check” before installing battery.
Caution: A battery can present a risk of electrical shock and high short
circuit current. The following precautions should be observed
when working on batteries:
(1) Remove watched, rings or other metal objects.
(2) Use tools with insulated handles.
(3) Wear rubber gloves and boots.
(4) Do not lay tools or metal parts on top of batteries.
(5) Disconnect the charging source prior to connecting or
disconnecting battery terminals.
(6) Determine if battery is inadvertently grounded. If inadvertently
grounded, remove source from ground. Contact with any part of a
grounded battery can result in electrical shock. The likelihood of
such shock can be reduced if such grounds are removed during
installation and maintenance (applicable to equipment and remote
battery supplies not having a grounded supply circuit).
Page 8 of 18
$42201170
Hangzhou
Funstar
Figure 7 Figure 8
(2) Please use M5*10 screws to fix battery cables on the battery
contact. As the Figure 9 and Table 4 shows:
Box label Bag label Parts name Quantity
Battery cables 7pcs
III E M5*10 screws 12pcs
Table 4
O O
F
N F
FU2
O O
F
N F
FU1
V
e 0
r
k
c
i a First piece Second piece d
e
w l
B battery R
e battery
u
l
B
er
k
V
8
iw .t
c Third piece d 4
a
l
B battery
Fourth piece
battery
e
R e
r eh ce
i
W
d
t rr
e
R er oc
us
si
ek
V am no
k
c d
2
7 it
a
l
B Fifth piece Sixth piece e
R e
r
es ce
battery battery i
W ae n
d
e l no
R
P c
Figure 9
Page 9 of 18
$42201170
Hangzhou
Funstar
Figure 10 Figure 11
(2) Please use M6*16 hex bolts, M6*16 flat gasket and M6 spring
washer to fix the battery cables to the battery contacts. As the Figure
12 and table 5 shows:
Box label Bag label Parts name Quantity
Battery cables 7pcs
M6*16 hex bolts, M6 spring washer,
III B 12sets
M6*16 flat gasket
Table 5
O O
F
N F
FU2
O O
F
N F
FU1
0V k
rei acl First piece Second piece d
w e
R
B battery battery
eu
Bl
e
r
k
V
8
i
w .
acl Third piece Fourth piece d
e
R
4
e e t
c
B battery battery r
i h e
W t r
d
e
R e r
o
r
u c
s s
i
e
k
V a n
o
cka d
2
7 m i
t
lB Fifth piece Sixth piece e
R e e
s c
battery battery r
i
W a e
n
d e
l n
e
R
P o
c
Figure 12
Page 10 of 18
$42201170
Hangzhou
Funstar
3.4.3 The diagram for AESD and battery box connected, as figure 13 shows:
电源指示
P ow er indicator
电梯断电自动平层装置
充电指示
C harge indicator
浮充指示
Fl oati ng i ndic ator
欠压指示
Low-v ol tage indicator AUTOMATIC EVACUATION SUPPLY DEVICE
运行指示
Runni ng indicator
O O
F
S
N F
FU2
O O
F
N F
FU1
e
r
i
W
d
e
R e
r
i
W
d
e k
R e c
a First piece d
r
i l Second piece e
R
w B battery battery
e
u
l
B
e
r
k
V
8 i
w
c Third piece d 4 .
当心触电 a
l
B battery
Fourth piece e
R e
r e tc
battery i
W h
t er
orc
d
e
R e
r
u
警 告 s s
e i
k n
V a o
k 2
7 m i
c
a d
e t
l Fifth piece Sixth piece e
R e
s c
B battery battery r
i
a e
W
e n
d
e l no
R
P c
Figure 13
3.5.1 When installation of the batteries are completed, the order of the check
actions shall be jump JH-1 and JH-2, jump KEFE-1 and KEFE-2, then
switch the circuit breakers and turn the rocker switch to “work”
position.
3.5.2 After a 30s delay, AESD will start its inverter and pick up contactor SAE.
Use the multi-meter to measure the voltage between LV1 and N, LV2
and N, LV3 and N, and its voltage should be AC230V ±10%. The
running indicating is light on the top right corner of the device.
3.5.3 Disconnected KEFE-1 and KEFE-2, AESD will drop contactor SAE. The
resistance between KEF-1 and KEF-2 should be in the connect state.
Check has finished.
3.5.4 Please switch the AESD rocker switch on “check” position and air
circuit breaker on ‘’OFF’ position, dismount short jumper.
Page 11 of 18
$42201170
Hangzhou
Funstar
Note 1: Please be sure that switch off the main power of the elevator
before connecting AESD device.
4 Adjustment
Page 12 of 18
$42201170
Hangzhou
Funstar
Table 6
6 Notice
6.1.1 Please be sure that the device rocker switch “S” is switched on
“check(0)” position when AESD device is transported, stored or
checked, and it should be switched on “work(1)” position after
adjustment and checking.
6.1.2 The AESD device should be put to use manually once a month in order
to that whether the device is normal or not (please artificial interrupt
power supply when the elevator no-load running).
Page 13 of 18
$42201170
Hangzhou
Funstar
(1) Battery should be stored at low temperature, dry and clean
environment. And it should be avoided heat source and direct
sunlight. Storage battery is fully charged. Every three months,
recommend equalization charge for one time. Charge the batteries
at least once every six months, if they are stored at 25℃.
(2) The battery must be immediately charged after discharge.
(3) The battery which set aside for a period of time should be
recharged until the capacity is restored to its original level.
(4) When the capacity is only or below 40% of its rated capacity, the
battery should be with balanced charging to make the capacity
recovery.
6.2.4 Routine inspection the battery
.Regular inspection (at least once every 3 months) , you need to replace
the battery if the following exception occurred:
(1) Any abnormal voltage
(2) Any physical effects (such as impact or shell deformation)
(3) Any electrolyte leaks out
(4) Any abnormal heat
6.2.5 Tips
(1) To avoid danger, you should be not arbitrary removable battery.
(2) When use multiple batteries, please pay attention to the connection
of battery. Be careful not to short circuit.
(3) The battery should not be used under the environment of sealed or
high temperature. The 20-25℃ is the battery best operating.
(4) Please don’t use chemical cleaning agents, dry cloth or duster to
clean the battery.
(5) Please don’t let the rain poured into the battery or put the battery
into the water.
(6) Please don’t tank mix with different capacity, old and new, different
battery manufacturers’ batteries in the same box.
(7) Please don’t place the battery near the fire place or in the fire.
(8) Used batteries should be concentrated on the designated location
or recycled by the battery manufacturers.
6.3.1 Before discharging C capacitance, please switch off the air circuit
breaker FU1、 FU2, turn the device switch “S” to the “Check” (0)
position.
6.3.2 Before discharging C capacitance, please plug off the plug from “Work”
position and plug into “Discharge” position on the REB PCBA, then press
reset switch CDB by hand, the LED1 indicator lights and FM1 buzzer
beeps, the C capacitance begin discharging until LED1 indicator goes
out and FM1 buzzer stops beeping. This process would last 30-60s.
Page 14 of 18
$42201170
Hangzhou
Funstar
6.3.3 Release the reset switch CDB, plug off the plug from “Discharge”
position and plug into “Work” position. The discharging process of C
capacitance is finished.
Figure 14
6.4.2 The model of knot adjusting tool for phase relay is slotted screwdriver
LC2.5-75mm as figure 15 shows, the usage instructions of adjusting tool
(slotted screwdriver)as figure 16 shows:
Page 15 of 18
$42201170
Hangzhou
Funstar
6.4.3 Phase relay input electric supply 3-phase rated voltage setting:
(1)When ZDSCHQTA-A9 ex-factory, setting the input 3-phase rated
voltage of phase relay with 380VAC as figure 17 shows:
Page 16 of 18
$42201170
Hangzhou
Funstar
7 Appendix
Appendix 1:
Weidmuller terminals
C3
1 2 2
-
LV1
LV2
LV3
L1S
L2S
L3S
2
J
4
U
F
C2
1 2
C1
1 2
2 4 6 2 4 6
SAE
SH
1 3 5
J-15
J-18
1 3 5
COM
NO
TU-W
TU-U
TU-V
-
U
T
J
J-L1 L1
L2
J-L3 L3
J-L2
W
U
V
5 4
- 3
-
2 2 -
2 40.
J J J
/04
20
0.-
TE 4-
PSU
S
W
V
U
TE-U
TE-V
TE-W
E
c
W
V
U
P
i
g
IGBT
o
L
5 432 1
N
- - -
P
1 1 -1 -1 1
r J JJ J J
C
e
t
l
i C
F M
E
C +
M
E -
2
2345 + -
-
2-2-2-2
Weidmuller terminals
J J J J
FU2
1
L 2
L 3
L N EP
C
4-1H 4
3-1H 3 C/
2-1H 2 F0 H
02
1-1H 1 CD
H
H1
DC72V
DC0V
Page 17 of 18
$42201170
Hangzhou
Funstar
Appendix 2:
Auxiliary contact of
main air circuit
Weidmuller terminals
2
X X HS 31
70 - 2
V8 - V8 1- 2- 1- 2- 1- 2- 1
k k
N- 26 A1K 40N o o
C4 C4 JH JH FEE FEE EFK EFK -
t
-
t
TU I + D + D t t
1 14 K K a
b
a
b
K 11
S
2A 2 1A
1
- 3-
AES
K 4 D
1
X 1 8 0
- E
X P 5 L
1A 9 A1
7 D
E
K
2- 5
L
1 0V HJ 2J
CA 6 1 7 1 5 1
J 2 3 4 J 2 3 4 5 J 2 3
4
1
EA 2 HJ
S 2
-
8 4 2
22 17 P u
f
HS 1- V
0
V
2
HJ C 7
J D C
D 35
器 2
7
电 15 2 1 2 3 H
继 -J S
序 21 1
U 45
相 F
discharging pcb
1
18- 1A A
C capacitance
- 3
J K 0
5 4
- -
B 1
m K K
8 E
R
p
i
-
S S
CD
e
v
i
r
KS 1 0
2- D
1U 8V
V4 )1 4
F 2 1
E-A
1 P P
2 D 12 3 4 5 6 D 1 23 4 5 6 7 8
AC S(
12 3
1
- 2
To Drive-ipm150-A
To Drive-ipm150-A
U -
To CONTROL-DSP-4
K K
V0 S S
V2 V8
7C 4C CD
D D F
To LED-04
1
3
-
C
U
1 2 J
0V k
o k
o
C 8 7 6 5 4 3 2 1 - -
D - - - - - - - - 1 2 3 4 5 6 t t 1 2
1
P 1
P 1
P 1
P 1
P 1
P 1
P 1
P -
2 -
2 -
2 -
2 -
2 -
2
t
a t
a - -
1- 2- 3- D D D D D D D D P P P P P P b b 1 2 3 4 F
E F
- - - - E
+
C 21 21 21 -16 -26 -36 -46 D D D D D D 1 1 1
H H H
1
H
K K
P P P J J J J
2
1A
K 0
1 1 3 6
P P 1 2 3 4 5 6 1
1 2 3 4 5 6 7 8 1 P 1 2 P 1 2 3 4 8
P 1 2 3 4 5 6 2
P 1 2 3
01
2Y
1 4 Y4D 1 2 3 Y5D 1 2 3 4
D
V
5 V D D
1 5
1 6 N
G N
G
+ - P A A
色 色
棕 兰
BH re 4
_ L
21 ga P O
R
-V hC S
D T
27 _ N
O
-Y L
O C
T R
T
N
O
2 C
V4 V0 V4 V0
12 C 62 CA
A + +
C C
A A
EP 7 5
1 1 2 3 4 4
1 1 9 1 5 1 2 3
D
E 2 1 D
E 2 1 1
P
2 1 1
P 1 2 3 P 6 5 4 3 2 1 P 2 P 2 3 4 P
L L
2
N W N V N U 3 3 3
8 1
FU3
1
5 1 2
1
- 2
- 4
- 5
- - -
3L 2L 7
J
7
J
7
J
7
J 1 H H E
A E
F E
F
- S S S
1
6
k
r + E
K E
K
- o C 4 4
8 4
1
H W 5
S
To LED-04
To LED-04
3 4
-
- 2
2 J
J
Page 18 of 18
$42201170
HANGZHOU FUNSTAR CO., LTD.
,
Hangzhou China
P.C.: 311100
E-mail: [email protected]
URL: http://www.funstar-tech.com