0% found this document useful (0 votes)
28 views

Abhishek Kumar

Hihihiguhuguyy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

Abhishek Kumar

Hihihiguhuguyy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

CURRICULUM VITAE

SAP PP Consultant

Abhishek Kumar

Career Objective
To be SAP PP consultant with a focus on improving efficiency of PP related working process.

Career Profile

I am B. Tech having about 3 years and 11 months of working experience in SAP PP Consultant at Yogik
Technologies. I have done Full cycle SAP S/4 HANA Implementation and 2 support Project including Rise with
SAP.

SAP PP SKILLS

 Master Data:
 Material Master
Finished Goods, Semi- Finished Goods, Raw Materials, Configurable Material
 Bill of Materials (BOM)
Single Level BOM, Multilevel BOM, Variant BOM, Multiple BOM
 Work center/ Resources
 Routing/Rate Routing
 Production Version
 MRP Type
 PD (MRP)
 ND (No Planning)
 VB (Manual reorder point planning)
 VM (Automatic reorder point planning)
 SAP PP Process from Demand Management to Close Production Order
 Create PIR (Planned Independent Requirement)/ Sales Order
 To Run MRP (Single Item, Multiple level)
 Conversion Planned Order (In-House Production) to Production Order
 Conversion Purchase Requisition (External Procurement) to Purchase order
 GRN against Purchase Order
 Release Production Order
 Goods issue against production order
 Confirmation of operation against production order
 Goods Receipt against production order
 TECO (Technically Completed)
 Settlement of production order
 Close production order
 Physical Inventory:
Removing quantity from the SAP system for those materials’ quantity which is not physically
available in the stock
 Planning Strategy
 Make to Order Production
 Make to Stock Production
 Make to Stock production/ Gross Requirement Planning
 Planning with final assembly
 Stock Transfer
 One Plant to other Plant within same company code
 One Storage location to other Storage location
 To stock upload in the system
 Integration: PP with MM, SD, and QM Module
 Shop Floor Control Configuration
1. Master Data
 Order
 Define Order Types
 Define Order Type-Dependent parameters
 Define Number Ranges for Orders
 Define Number Ranges for confirmation
 Define Number Ranges for reservation
 Define Number Ranges for operation
 Define Number Ranges for Capacity Requirements
 Define production scheduling profile
2. Operations
 Task List Selection
 Define Default Values

 Availability Check
 Checking Control

 Scheduling
 Define Scheduling Parameters for Production Order
 Define Standard Value Keys
 Define Scheduling Margin Key
 Capacity Requirement Planning
 Define Capacity Category
 Define Shift Sequence
 Define Formula Parameters
 Confirmation
 Define Confirmation Parameters
3. Integration
 Define Valuation of Goods Received

 Variant Configuration:
 Super BOM
 Super Routing
 Characteristic
 Class
 Configuration Profile
 Object dependency
 Pre- Condition
 Selection Condition
 Action Condition
 Procedure
 Constraints

SAP TECHINICAL SKILLS


 LSMW
 BDC
 Knowledge of SAP PP tables and fields
 Functional Specifications
 Data Dictionary
 Enhancement

SAP QM SKILLS

 Master Data:
 Master Inspection Plan (MIC)
 Inspection Method
 Sampling Procedure
 Inspection Plan
 Inspection Lot Creation
 Result Recording
 Usage Decision (UD)
 Long Term Inspection (LTIN)

Other Skills

 Language Known: C, C++, Java


 Operating System: Windows XP, 7, 8.1
 Application Software: MS-Office

Working Experience

Organisation: Yogik Technologies Pvt Ltd (October 2020 to till date)


Projects in reverse order

1st Project

Client: “Fomento Resources Private Limited”


Project Name: SAP S/4 HANA Implementation
Project Type: Implementation and support.
SAP Version: SAP S/4HANA 1909
Duration: DECEMBER 2020 till August 2023

● Report development
● Issue resolve
● User training
● Unit testing.

2nd Project
Client: “KRPL” SHAHJAHANPUR (UP).
Project Name: SAP S/4 HANA Implementation
Project Type: Implementation.
SAP Version: S/4 HANA 2209
Duration: July 2022 till date
Role & Responsibility: IMPLEMENTATION
● Collecting client’s requirements
● Mapping the process in SAP
● Blueprint preparation
● System configuration
● Testing
● Prepare FS as per the Clients New Business Requirement.
● Master data creation.
● Functional Specification (FS) writing.
● Unit testing.
● Integrated testing.
● User Manual preparation & training.
● Day to day Issue resolution in Hypercare support

3rd Project
Client: “BAIDYANATH AYURVEDICS.
Project Name: SAP S/4 HANA SUPPORT.
Project Type: ENHANCEMENT AND SUPPORT.
SAP Version : S/4 HANA 2209
Duration : July 2023 till date
Role & Responsibility: ISSUE RESOLVE & DEVELOPMENT.

Academic Profile

 Have completed Bachelor of Engineering in Mechanical (ME)) from NEELKANT INSTITUTE OF


TECHNOLOGY, MEERUT affiliated to AKTU Uttar Pradesh in 2018 with an aggregate percentage of 70.
Have completed AISSCE (CBSE) in 2013 with an aggregate percentage of 63%.
 Have completed AISSE (CBSE) in 20011 with an aggregate CGPA 8.0.

Personal Details

Name: ABHISHEK KUMAR.


Date of Birth: 17\12\1995.
Father’s name: Mr. RANJEET KR. Rawani.

Declaration:
I declare that the information provided here is corrected to my knowledge and I will be responsible for any
discrepancy.

Date: SEPTEMBER 2024.

You might also like