0% found this document useful (0 votes)
21 views

03 Seatwork 1

Ctto

Uploaded by

enerojia98
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

03 Seatwork 1

Ctto

Uploaded by

enerojia98
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

IT2011

Seatwork
I. Do as indicated.

1. A discrete random variable 𝑋 has the following probability distribution: (6 items × 2 points)

x 0 1 2 3 4
P(x) 0.15 0.15 0.20 0.40 0.10

a. What is 𝑃(3)?

b. What is 𝑃(𝑥 > 3)?

c. What is 𝑃(𝑥 ≤ 3)?

d. What is the mean/ Expected value 𝐸(𝑥)?

e. What is the variance (𝜎 2 ) of 𝑋?

f. What is the coefficient of variation (CV)?

2. Two fair dice are rolled at once. Let 𝑋 denote the difference in the number of dots that appear on the
top faces of the two dice. For example, if a one and a five are rolled, 𝑋 = 4, and if two sixes are rolled,
𝑋 = 0. (4 items × 2 points)

a. Construct the probability distribution for 𝑋.

b. Compute the mean/ expected value 𝐸(𝑥).

c. Compute the variance (𝜎 2).

d. Compute the coefficient of variation (CV).

3. Xavier’s production line and Yves’ production line produce variable number of defective parts in an
hour, with probabilities shown in the tables below.

The probability distribution of the random variable 𝑋, represents the number of defective parts in an hour
produced by Xavier’s production line.

𝑋 0 1 2 3 4
𝑃(𝑥) 0.15 0.30 0.25 0.20 0.10

The number of defective parts produced each hour by Yves’ production line is a random variable 𝑌 with
the following probability distribution:

𝑌 0 1 2 3 4
𝑃(𝑦) 0.05 0.05 0.10 0.75 0.05
(4 items × 5 points)

a. Compute the means/ expected values of 𝑋 and 𝑌.

b. Compute the variance of 𝑋 and 𝑌.

c. Compute the coefficient of variance of 𝑋 and 𝑌.

d. Interpret the variability of the two distribution.

03 Seatwork 1 *Property of STI


Page 1 of 2
IT2011

Rubric for Item 3

Criteria Points
Complete solution with the correct answer 5
The last two major steps of the solution are incorrect. 4
Half of the solution is correct. 3
The first two major steps of the solution are correct. 2
The first major step of the solution is correct. 1

03 Seatwork 1 *Property of STI


Page 2 of 2

You might also like