0% found this document useful (0 votes)
139 views

06 Task Performance 1

Uploaded by

ChiLL MooD
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views

06 Task Performance 1

Uploaded by

ChiLL MooD
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

BM2106

TASK PERFORMANCE

Instruction: Prepare your proposed business's production/service delivery process and waste
disposal/management plan.

Production Process and Service Delivery (50 points)


A flow chart that presents the manufacturing process of the product or the delivery of service to the
consumers. A detailed procedure presenting product manufacturing/service delivery with corresponding
photos and descriptions must be included. It includes the following:

• Organization work plan


• Individual and/or team work plans
• Individual project plans

Waste Disposal/Management Plan (50 points)


The primary tool to guide workers toward waste management and includes the management's
initiatives to achieve the goals managing construction waste. This addresses the management of all solid
and liquid refuse, including hazardous and non-hazardous waste, produced due to a project.

GRADING RUBRIC:
CRITERIA PERFORMANCE INDICATORS POINTS
Content Provided pieces of evidence and supporting details 30

Organization Expressed the points in a clear and logical arrangement of ideas in the 20
of ideas paragraph
TOTAL 50

06 Task Performance 1 *Property of STI


Page 1 of 5
BM2106

CHARTS AND TABLES

Figure 1. Production Processes

Figure 2. Sample Production Process (Flowchart)


Source: https://www.researchgate.net/publication/262441966/figure/fig1/AS:668924475621407@1536495431991/The-basic-
production-process-of-rendering.png

06 Task Performance 1 *Property of STI


Page 2 of 5
BM2106

Figure 3. Sample Service Delivery Process (Flowchart)


Source: https://landing.moqups.com/img/content/diagrams/process-flows/product-shipping-process-flowchart-template.png

06 Task Performance 1 *Property of STI


Page 3 of 5
BM2106

SAMPLE ORGANIZATIONAL WORK PLAN

TASK/ACTIVITY RESPONSIBILITY BUDGET ESTIMATED


TIME/COMPLETION
DATE
Create online training Accessibility P5,000 2 hours / December 1,
on how to respond to coordinator with 2021
requests for alternate Human Resources
formats and local
service providers

SAMPLE INDIVIDUAL WORK PLAN

Employee Simon Bolton Employee 69092 Position Title: Sheet Metal


Name: Number: Worker
Department: Manufacturing Salary range: P500 - P1,000
(Construction) per hour
Supervisor’s Julio Lopez Supervisor’s Iron Work
Name: Title: Contractor

Key Performance Planned Activities Accomplishments Outcomes/Outputs


Indicators (KPIs) (How to achieve the
(From the Job KPIs)
Description)
Building and installing 1.1. To build and install  High resistance of  Heavy-duty and
products air and heat ducts, installation of air polished air and
roof decking, and and heat ducks, roof heat ducks, roof
sheet metal decking, and sheet decks, and metal
buildings. metal buildings. sheets.
1.2. To ensure the  Finished tasks in five
durability and (5) hours (saved one
quality of the built (1) hour for the
and installed project)
products.

06 Task Performance 1 *Property of STI


Page 4 of 5
BM2106

PROJECT (INDIVIDUAL/TEAM) WORK PLAN TEMPLATE

Introduction:

(1) State the business problem/s.


(2) State the goal/s for solving the problem/s.
(3) State the project or solution.
(4) Explain why and how the project will solve the problem/s of the business.

GOAL 1: State the first goal concisely using the SMART (specific, measurable, attainable,
relevant, time-bound) approach.
Objectives Timeline Resources Team Strategy
Responsibilities
List the specific State when the People, money, Write the detailed List the sub-tasks
tasks to achieve project will begin stocks, and other roles and required to
the goal and end. Also, things needed to responsibilities of achieve the
mentioned include any other accomplish the each team objectives for this
deadlines or project member. goal.
milestones *be specific to
avoid confusion
during the project

06 Task Performance 1 *Property of STI


Page 5 of 5

You might also like