SWITCHGEAR ELECTROMECHANICAL
Client MASDAR DISTRICT COOLING PLANT Equipment 22KV RMU
Manufacturer LUCY Date
Contractor Sub Station
5×Is 0.427
EARTH FAULT (Ie >>)
Pick – Up (A)
Set APPLIED CURRENT (A) (Is x CALCULATED
value 2) TIME (ms) MEASURED TIME(ms)
(A)
4.0 0
SBEF RELAY TEST REPORT
EARTH FAULT (Ie >)
APPLIED CURRENT Pick – Up (A) CALCULATED
Set value
(A) TIME (SEC) MEASURED TIME(SEC)
(A)
2×Is 1.0
5×Is 0.427
EARTH FAULT (Ie >>)
Pick – Up (A)
Set APPLIED CURRENT (A) (Is x CALCULATED
value 2) TIME (ms) MEASURED TIME(ms)
(A)
4.0 0
Fault Record:
Record No : Threshold :
Fault : Magnitude:
REMARKS:--
Trip test: Connected through (1) Primary Injection (2) Secondary Injection
3. Phase fault -- Passed Failed
4. Earth fault -- Passed Failed
DATE : TRANSFORMER :
RATING
RELAY : ASHIDA
1. FUNCTIONAL TEST
Sl.No. Description Result Remarks
5 Painting
Remarks:
5×Is
OVERCURRENT (I >>)
Pick – Up (A)
Set APPLIED CURRENT (A) (Is CALCULATED MEASURED TIME(ms)
value x 2) TIME (ms)
(A) R Y B R Y B
0
OVERCURRENT (I >>>)
Pick – Up (A)
Set APPLIED CURRENT (A) (Is CALCULATED MEASURED TIME(s)
value x 2) TIME (s)
(A) R Y B R Y B
5×Is
EARTH FAULT (Ie >>)
Pick – Up (A)
Set APPLIED CURRENT (A) (Is x CALCULATED
value 2) TIME (ms) MEASURED TIME(ms)
(A)
4.0 0
Fault Record:
Record No : Threshold :
Fault : Magnitude:
REMARKS:--
5×Is
EARTH FAULT (Ie >>)
Pick – Up (A)
Set APPLIED CURRENT (A) (Is x CALCULATED
value 2) TIME (ms) MEASURED TIME(ms)
(A)
4.0 0
Fault Record:
Record No : Threshold :
Fault : Magnitude:
Trip test: Connected through (1) Primary Injection (2) Secondary Injection
1. Phase fault -- Passed Failed
2. Earth fault -- Passed Failed
3. PROTECTION RELAY TEST
MANUFACTURER : Alstom MODEL No. :
SERIAL No. : VERSION :
RELAY SETTING :-
P/F CURVE : IEC SI
I> : tI > :
I >> : tI>> :
I >>> : tI >>> :
E/F CURVE : IEC SI
Ie > : tIe > :
Ie >> : tIe>> :
OVERCURRENT ( I >)
Pick – Up (A)
Set CALCULATED MEASURED TIME(SEC)
value APPLIED CURRENT (A)
R Y B TIME (SEC) R Y B
(A)
2×Is 1.0
5×Is 0.427
OVERCURRENT (I >>)
Pick – Up (A)
Set APPLIED CURRENT (A) (Is CALCULATED MEASURED TIME(ms)
value x 2) TIME (ms)
(A) R Y B R Y B
0
OVERCURRENT (I >>>)
APPLIED CURRENT (A) (Is Pick – Up (A) CALCULATED
Set MEASURED TIME(s)
5 KV Y to Earth+ R+B
5 KV B to Earth+R+Y
DIELECTRIC TEST
Test Voltage ac (1min.) (kV) Test connection Leakage Current (mA) REMARKS
22.4 KV R to Earth+Y+B
22.4 KV B to Earth+R+Y
Measured
Test Voltage dc (1Min.) (kV) Test connection REMARKS
Resistance(ohm)
5 KV R to Earth+Y+B
5 KV Y to Earth+ R+B
5 KV B to Earth+R+Y
REMARKS:-
SL. NO.
MAKE & MODEL MEGGER&MIT 510/2 HIGH VOLTAGE VLF HIPOT /PFT-5030MF
CALIB.DUE
5. CT RATIO TEST
POLARITY CHECKS:
6. METERING CT TEST:
8. EARTH RESISTANCE:
TRM Body :
TRANSFORMER :
TR.NEUTRAL :
I> t>
I>> t>>
t>>>
I>>>
E/F CURVE : IEC SI
Ie> t>
Ie>> t>>
UNIT I:
I> t>
I>> t>>
t>>>
I>>>
E/F CURVE : IEC SI
Ie> t>
Ie>> t>>
SNAG
LIST OF TESTS:
1. Visual Inspection
2. Insulation Resistance Measurement Test
3. Winding Resistance Measurement Test
4. Voltage Ratio & Magnetizing Current Test
5. Vector Group Test
6. Functional Test of Supervisory Equipment
COMPANY SGE
NAME
SIGNATURE
DATE
Page 1 of 4
SITE TEST REPORT
SWITCHGEAR ELECTROMECHANICAL
Client Doc. No.
Project Title Manufacturer
Consultant Date
Contractor Sub Station
COMPANY SGE
NAME
SIGNATURE
DATE
Page 2 of 4
SITE TEST REPORT
SWITCHGEAR ELECTROMECHANICAL
Client Doc. No.
Project Title Manufacturer
Consultant Date
Contractor Sub Station
COMPANY SGE
NAME
SIGNATURE
DATE
Page 3 of 4
SITE TEST REPORT
SWITCHGEAR ELECTROMECHANICAL
Client Doc. No.
Project Title Manufacturer
Consultant Date
Contractor Sub Station
Note:
Voltage& Vector group according to rating plate checked by TTR kit.
SL. NO.
MAKE & MODEL
CALIB.DUE
COMPANY SGE
NAME
SIGNATURE
DATE
Page 4 of 4