17 MEPL DCS CLCS Logic Co Ordinated Control
17 MEPL DCS CLCS Logic Co Ordinated Control
PT PT PT 21-KI-100
MW SET POINT
103A 103B 103C MANL SP CALCULATION
ALGORITHM
GCB OPN
TRK REF BLR MASTER AUTO
OR TRK FLAG
PR SET POINT
MW RAMP
TRBN CALCULATION
RATE
TRIPPED ALGORITHM
CALCULATION
ALGORITHM
PV SP PV SP
RATE
LIMITOR
BOILER
PID PID MODEL
PR RAMP RATE
CALCULATION FF FF
ALGORITHM
TRK REF
TRK FLAG
BOILER MASTER
TRIP MANL
TRBN I/L PR SET POINT TO DEH BOILER MASTER DMND MW SET POINT TO DEH
REFER PAGE 65 REFER PAGE 65
(REFER PAGE 50)
R0 28.03.2014 SS DB DB
REV DATE PURPOSE BY CHKD APPD
REVISION HISTORY DRAWING NUMBER : SHEET- 64
THERMAX LIMITED POWER DIVISION-LPP GROUP
CUSTOMER: MEPL-THAMMINAPATNAM,AP CONSULTANT: EVONIK
PROJECT: 2 x 150 MW IPP
DCS LOGIC - SECTION :
SP SP SP
TRBN BOILER
FOLLOW FOLLOW
SP PV SP PV SP PV
D D D
LOAD CONTROL
THROTTLE PR CONTROL
R0 28.03.2014 SS DB DB
REV DATE PURPOSE BY CHKD APPD
REVISION HISTORY DRAWING NUMBER : SHEET- 65