0% found this document useful (0 votes)
107 views

17 MEPL DCS CLCS Logic Co Ordinated Control

DCS CLCS Logic Co ordinated Control

Uploaded by

anbarasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views

17 MEPL DCS CLCS Logic Co Ordinated Control

DCS CLCS Logic Co ordinated Control

Uploaded by

anbarasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

THERMAX LIMITED POWER DIVISION-LPP GROUP

CUSTOMER: MEPL-THAMMINAPATNAM,AP CONSULTANT: EVONIK


PROJECT: 2 x 150 MW IPP
DCS LOGIC - SECTION :

TRBN I/L STM PR


MW

PT PT PT 21-KI-100
MW SET POINT
103A 103B 103C MANL SP CALCULATION
ALGORITHM

TRK BLR FOLLOW MODE ON


TMS REF
TRBN FOLLOW MODE ON
PR SET POINT
CALCULATION MANL SP LOAD RATE TRK
ALGORITHM MW SET OR CSC MODE ON
POINT STN FLAG
LOAD LIMIT RUN BACK ACTV

GCB OPN
TRK REF BLR MASTER AUTO
OR TRK FLAG
PR SET POINT
MW RAMP
TRBN CALCULATION
RATE
TRIPPED ALGORITHM
CALCULATION
ALGORITHM

PV SP PV SP
RATE
LIMITOR
BOILER
PID PID MODEL

PR RAMP RATE
CALCULATION FF FF
ALGORITHM

BOILER FOLLOW TURBINE FOLLOW


OR MODE
CMC MODE

TURBINE FOLLOW SEL

TRK REF
TRK FLAG

BOILER MASTER

TRIP MANL

TRBN I/L PR SET POINT TO DEH BOILER MASTER DMND MW SET POINT TO DEH
REFER PAGE 65 REFER PAGE 65
(REFER PAGE 50)

LOOP NAME : COORDINATED CONTROL

R0 28.03.2014 SS DB DB
REV DATE PURPOSE BY CHKD APPD
REVISION HISTORY DRAWING NUMBER : SHEET- 64
THERMAX LIMITED POWER DIVISION-LPP GROUP
CUSTOMER: MEPL-THAMMINAPATNAM,AP CONSULTANT: EVONIK
PROJECT: 2 x 150 MW IPP
DCS LOGIC - SECTION :

TRBN I/L STM PR LOAD (MW) TRBN SPEED

PT PT PT DEH DEH DEH SI SI SI


103D 103E 103F 7 58 33 104 105 106

TMS TMS TMS

REFER PAGE 64 REFER PAGE 64

TRB THRIL PR SP FRM CMC LOAD SP FROM CMC

SP SP SP

TRBN BOILER
FOLLOW FOLLOW

SP PV SP PV SP PV

THROTTLE PR LOAD PID SPEED


PID PID PID PID PID

D D D

LOAD CONTROL

THROTTLE PR CONTROL

VALVE POSITION SET POINT

NOTE - THIS LOGIC IS IMPLEMENTED IN DEH.

LOOP NAME : COORDINATED CONTROL

R0 28.03.2014 SS DB DB
REV DATE PURPOSE BY CHKD APPD
REVISION HISTORY DRAWING NUMBER : SHEET- 65