Haryanarera - Gov.in View Project Project Preview Open 2772

Uploaded by

Bharat Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views

Haryanarera - Gov.in View Project Project Preview Open 2772

Uploaded by

Bharat Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 43

HRERA Gurugram Temp Project Id : RERA-GRG-PROJ-1536-2024

Submission Date : 09-02-2024 02:26:37 PM


Applicant Type : Company
Project Type: NEW

FORM REP-I
Part - A

1. Name and registered


GODREJ PROPERTIES LTD
address of the company
3RD FLOOR, PLOT NO 35, UM
(Annex a copy in Folder A)
HOUSE TOWER A, SECTOR 44
Phone(Landline) 01244842300
8800207105 (Number Shared by
Phone(Mobile)
Promoter in Public)
Email ID [email protected]
Website https://www.godrejproperties.com
Pan No.
XXXX995M
(Annex a copy in Folder A)
CIN No.
L74120MH1985PLC035308
(Annex a copy in Folder A)
2. Chairman of the company:
Name : MR PIROJSHA ADI GODREJ
Residential Address : Godrej One 5th Floor Pirojshanagar
Eastern Express Highway Vikhroli East Mumbai Maharashtra

Phone (landline) 02261698500


Phone (Mobile) 0226169850 (Number Shared by Promoter in Public)
Email ID [email protected]
PAN No. XXXX791J
(Annex a copy in Folder A)

3. Managing
Director/HOD/CEO:
Name : MR GAURAV PANDEY
Residential Address : Godrej One 5th Floor Pirojshanagar
Eastern Express Highway Vikhroli East Mumbai Maharashtra
Phone (landline) 02261698500
Phone (Mobile) 0226169850 (Number Shared by Promoter in Public)
Email ID [email protected]
PAN No. XXXX659J
(Annex a copy in Folder A)

4. Director 1:
Name : MR NADIR BURJOR GODREJ
Residential Address : Godrej One 5th Floor Pirojshanagar
Eastern Express Highway Vikhroli East Mumbai Maharashtra

Phone (landline) 02261698500


Phone (Mobile) 0226169850 (Number Shared by Promoter in Public)
Email ID [email protected]
PAN No. XXXX643Q
(Annex a copy in Folder A)

5. Authorised reprsentative for


correspondance with
Authority:
Name : MR ABHIJEET SINDHU
Residential Address : 3RD FLOOR PLOT NO 35 UM HOUSE
TOWER A Sector 44 Gurugram Haryana 122002

Phone (landline) 01244842300


Phone (Mobile) 8800207105 (Number Shared by Promoter in Public)
Email ID [email protected]
PAN No. XXXX452G
(Annex a copy in Folder A)

I hereby declare that the above information and particulars ase based on record and are true to the
best of my knowledge and belief and nothing has been concealed.

Signature of the Applicant/


authorised representative
Stamp _____________
Date _____________
FORM REP-I
Part - A

Location and Address of the project:


1. Name of the project GODREJ ZENITH
2. Address of the site of
the project
SECTOR 89, GURUGRAM, HARYANA
(Annex a copy in
Folder A)
Tehsil HARSARU ST
District GURUGRAM
3. Contact details of the
site office of the project:
Phone(Landline) 1244842300
9560396251 (Number Shared by Promoter
Phone(Mobile)
in Public)
Email [email protected]
4. Contact person at the
site office:
Name SURESH KUMAR RATHI
Phone(Landline) 1244842300
9560396251 (Number Shared by Promoter
Phone(Mobile)
in Public)
Email [email protected]

I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.

Signature of the Applicant / Authorised


Representative
Stamp _____________
Date _____________
FORM REP-I
Part - A
Fee Details

As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017,
the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------

2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr Draft/Cheque Draft
Amount Payee Bank Payable To
No. No. Date
19-01- HRERA
1 1592 9950000 AXIS BANK
2024 Gurugram

I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.

Signature of the Applicant


Mobile no. _____________
Email ID _____________
FORM REP-I
Part - B

Information relating to the project land and license:


1. Land area of the project 14.20625 (Acre)
2. Permissible FAR 3.62
3. FAR proposed to be utilized in the
3.58998
project
4. Total licensed area,
if the land area of the present project is 14.20625 (Acre)
a part thereof
5. License number granted by the Town
& Country Planning Department for the
project/Allotted By Municipal 151 OF 2023
Corporation/Permission by Local dated 20.07.2023
Bodies
(Annex copy in folder B)
6. Is the applicant owner-licensee of
the land for which the registration is Yes
being sought.

I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.

Signature of the
Applicant /
Authorised
Representative
Stamp
_____________
Date
_____________
FORM REP-I
Part - C

Project Details:
1. Estimated cost of the project:
(Annex a copy of the project in 214873.14 Lakhs
Folder C)
i. Cost of the land (if included in the
33785.46 Lakhs
estimated cost)
ii. Estimated cost of construction of
127895.11 Lakhs
apartments
iii. Estimated cost of infrastructure
24632.59 Lakhs
and other structures
iv. Other Costs including EDC,
28559.98 Lakhs
Taxes, Levies etc.

2. The total land of the project measuring 57490.56 Square Meters will be utilised in the following
manner:

Sr. Area of land (Square


Land area under usage
No. Meters)

1 PLOTS TO BE SOLD 0

LAND AREA TO BE USED FOR CONSTRUCTION OF


2 7528.71
APARTMENTS

3 CONSTRUCTION OF ROADS 11226.06

4 PAVEMENTS 3554.18

5 PARKS AND PLAYGROUNDS 1928.4

6 GREEN BELTS 2666.34

7 VEHICLE PARKINGS 2850.00

8 ELECTRICITY SUB-STATION 2372.00


9 CLUB HOUSE 1565.19

10 SEWAGE AND SOLID WASTE TREATMENT FACILITY 1300.00

AREA TO BE LEFT FOR TRANSFERRING TO THE


11 0
GOVERNMENT FOR COMMUNITY SERVICES

12 ANY OTHER 4213.73

13 AREA UNDER COMMERCIAL UNITS 1579.05

14 HARDSCAPE INCL PLAYGROUND AND HARD SURFACES 9803.5

15 SOFTSCAPE 6903.4

Total 57490.56
3.Approvals/ NOCs from various agencies for connecting external services.

Whether Approval taken


External/ connecting
from the agency
service to be
Facility concerned. Yes/No
provided by (Name
(Annex details in folder
the agency)
C)
ROADS GMDA No

WATER SUPPLY GMDA No


ELECTRICITY DHBVN No
SEWAGE DISPOSAL GMDA No

STORM WATER DRAINAGE GMDA No


4.Details of services and facilities which will be provided inside the project area as per
service plan estimates and/or the project report:

Remarks: Yet to be
prepared / Submitted to
Estimated
HUDA, Town & Country
cost (In
Planning Department/ as
Sr. Lakhs)
Name of the facility per project report etc.
No. (Within the
(Annex relevant
project
documents showing
area only)
costing details etc. in
folder C)

1 INTERNAL ROADS AND PAVEMENTS 558.72 YET TO BE PREPARED

2 WATER SUPPLY SYSTEM 1213.25 YET TO BE PREPARED

3 STORM WATER DRAINAGE 395.98 YET TO BE PREPARED

4 ELECTRICITY SUPPLY SYSTEM 5553.79 YET TO BE PREPARED

5 SEWAGE TREATMENT & GARBAGE DISPOSAL 75.98 YET TO BE PREPARED

6 STREET LIGHTING 226.44 YET TO BE PREPARED

7 SECURITY AND FIRE FIGHTING 3403.78 YET TO BE PREPARED

8 PLAYGROUNDS AND PARKS 0 YET TO BE PREPARED

9 CLUB HOUSE/COMMUNITY CENTRE 3194.14 YET TO BE PREPARED

10 SHOPPING AREA 0 YET TO BE PREPARED

11 RENEWABLE ENERGY SYSTEM 0 YET TO BE PREPARED

12 SCHOOL 1490.43 YET TO BE PREPARED

13 HOSPITAL/DISPENSARY 0 YET TO BE PREPARED

14 ANY OTHER 5055.34 YET TO BE PREPARED

15 SOFTSCAPE 253.97 YET TO BE PREPARED


16 HARDSCAPE 761.90 YET TO BE PREPARED

17 ELECTRICAL SUB STATION 625.70 YET TO BE PREPARED

18 SIGNAGES 203.17 YET TO BE PREPARED

19 LANDSCAPE 761.90 YET TO BE PREPARED

20 HIGHSIDE 858.10 YET TO BE PREPARED

5. (a) Date of approval of latest layout plans granted by Town & Country
01-02-2024 (date)
Planning Department on the basis of which the project will be executed.
6. Date of approval of Building Plans 01-02-2024 (date)
7. New projects:
i) Likely date of starting the construction work 01-04-2024
ii) Likely date of completing the project 31-03-2035
iii) Sizes of the plots to be offered in the project

Plot Area(In Square Meter) Number of plots in the project

0 0

iv. Type of apartments to be constructed in the project:

Carpet area(In Square Number of Number of


Type
Meter) apartments towers
Apartment/Shops/Other
90.75 35 1
Buildings
Apartment/Shops/Other
67.4 34 1
Buildings
Apartment/Shops/Other
86.59 35 1
Buildings

Apartment/Shops/Other
91.57 34 1
Buildings
Apartment/Shops/Other
67.03 33 1
Buildings

Apartment/Shops/Other
86.64 35 1
Buildings
Apartment/Shops/Other
86.84 66 1
Buildings
Apartment/Shops/Other
67.4 69 1
Buildings
Apartment/Shops/Other
75.68 4 1
Buildings
Apartment/Shops/Other
128.45 63 1
Buildings
Apartment/Shops/Other
128.55 67 1
Buildings
Apartment/Shops/Other
108.81 1 1
Buildings
Apartment/Shops/Other
108.73 4 1
Buildings
Apartment/Shops/Other
59.04 70 1
Buildings
Apartment/Shops/Other
98.42 65 1
Buildings
Apartment/Shops/Other
78.64 4 1
Buildings

Apartment/Shops/Other
136.03 69 1
Buildings
Apartment/Shops/Other
98.97 65 1
Buildings

Apartment/Shops/Other
110.96 1 1
Buildings
Apartment/Shops/Other
78.56 4 1
Buildings
Apartment/Shops/Other
127.46 134 2
Buildings
Apartment/Shops/Other
160.31 142 2
Buildings
Apartment/Shops/Other
139.97 2 2
Buildings
Apartment/Shops/Other
106.32 8 2
Buildings
Apartment/Shops/Other
113.2 130 1
Buildings

Apartment/Shops/Other
85.44 1 1
Buildings
Apartment/Shops/Other
95.1 4 1
Buildings

Apartment/Shops/Other
128.55 63 1
Buildings
Apartment/Shops/Other
127.89 68 1
Buildings

Apartment/Shops/Other
107.09 4 1
Buildings
Apartment/Shops/Other
22.03 1 1
Buildings
Apartment/Shops/Other
24.6 2 1
Buildings
Apartment/Shops/Other
27.25 3 1
Buildings
Apartment/Shops/Other
28.35 3 1
Buildings
Apartment/Shops/Other
9.28 3 1
Buildings
Apartment/Shops/Other
9.94 1 1
Buildings
Apartment/Shops/Other
16.81 1 1
Buildings

Apartment/Shops/Other
9.94 1 1
Buildings
Apartment/Shops/Other
17.34 1 1
Buildings
Apartment/Shops/Other
16.87 1 1
Buildings
Apartment/Shops/Other
17.22 1 1
Buildings
Apartment/Shops/Other
17.31 1 1
Buildings
Apartment/Shops/Other
17.43 1 1
Buildings
Apartment/Shops/Other
17.61 1 1
Buildings
Apartment/Shops/Other
20.31 1 1
Buildings
Apartment/Shops/Other
35.89 1 1
Buildings

Apartment/Shops/Other
18.74 1 1
Buildings
Apartment/Shops/Other
31.12 1 1
Buildings

Apartment/Shops/Other
20.69 1 1
Buildings
Apartment/Shops/Other
16.19 1 1
Buildings
Apartment/Shops/Other
24.12 3 1
Buildings
Apartment/Shops/Other
15.29 1 1
Buildings
Apartment/Shops/Other
15.26 1 1
Buildings
Apartment/Shops/Other
22.03 3 1
Buildings
Apartment/Shops/Other
25.11 3 1
Buildings
Apartment/Shops/Other
10.94 1 1
Buildings
Apartment/Shops/Other
11.48 3 1
Buildings
Apartment/Shops/Other
11.32 3 1
Buildings

Apartment/Shops/Other
3.48 1 1
Buildings
Apartment/Shops/Other
2.32 1 1
Buildings
Apartment/Shops/Other
7.43 1 1
Buildings
Apartment/Shops/Other
7.55 1 1
Buildings
Apartment/Shops/Other
39.64 2 1
Buildings
Apartment/Shops/Other
34.79 2 1
Buildings
Apartment/Shops/Other
34.93 2 1
Buildings

Apartment/Shops/Other
35.46 2 1
Buildings
Apartment/Shops/Other
35.00 2 1
Buildings

Apartment/Shops/Other
32.82 2 1
Buildings
Apartment/Shops/Other
30.00 2 1
Buildings
Apartment/Shops/Other
87.97 2 1
Buildings
Apartment/Shops/Other
37.67 2 1
Buildings
Apartment/Shops/Other
31.16 2 1
Buildings
Apartment/Shops/Other
3.48 2 1
Buildings
Apartment/Shops/Other
30.30 1 1
Buildings
Apartment/Shops/Other
30.28 1 1
Buildings
Apartment/Shops/Other
11.97 2 1
Buildings

Apartment/Shops/Other
4.59 2 1
Buildings
Apartment/Shops/Other
9.05 2 1
Buildings
Apartment/Shops/Other
3.5 2 1
Buildings
Apartment/Shops/Other
24.59 10 1
Buildings
Apartment/Shops/Other
27.91 10 1
Buildings
Apartment/Shops/Other
35.65 10 1
Buildings
Apartment/Shops/Other
38.08 8 1
Buildings
Apartment/Shops/Other
27.58 10 1
Buildings
Apartment/Shops/Other
27.43 10 1
Buildings
Apartment/Shops/Other
30.64 10 1
Buildings

Apartment/Shops/Other
27.85 10 1
Buildings
Apartment/Shops/Other
28.16 10 1
Buildings

Apartment/Shops/Other
28.20 10 1
Buildings
Apartment/Shops/Other
28.13 10 1
Buildings
Apartment/Shops/Other
28.23 10 1
Buildings
Apartment/Shops/Other
28.11 10 1
Buildings
Apartment/Shops/Other
28.03 10 1
Buildings
Apartment/Shops/Other
17.58 16 1
Buildings
Apartment/Shops/Other
17.58 16 1
Buildings
Apartment/Shops/Other
17.58 16 1
Buildings
Apartment/Shops/Other
17.58 16 1
Buildings

Apartment/Shops/Other
17.44 16 1
Buildings
Apartment/Shops/Other
17.28 16 1
Buildings
Apartment/Shops/Other
17.56 16 1
Buildings
Apartment/Shops/Other
17.54 16 1
Buildings
Apartment/Shops/Other
17.56 16 1
Buildings
Apartment/Shops/Other
17.56 16 1
Buildings
Apartment/Shops/Other
17.54 16 1
Buildings
Apartment/Shops/Other
17.54 16 1
Buildings

Apartment/Shops/Other
17.07 16 1
Buildings
Apartment/Shops/Other
17.08 16 1
Buildings

Apartment/Shops/Other
17.28 1 1
Buildings
Apartment/Shops/Other
17.56 1 1
Buildings
Apartment/Shops/Other
17.54 1 1
Buildings
Apartment/Shops/Other
17.56 1 1
Buildings
Apartment/Shops/Other
17.56 1 1
Buildings
Apartment/Shops/Other
17.54 1 1
Buildings
Apartment/Shops/Other
17.54 1 1
Buildings
Apartment/Shops/Other
17.07 1 1
Buildings
Apartment/Shops/Other
17.08 1 1
Buildings

Apartment/Shops/Other
24.40 3 1
Buildings
Apartment/Shops/Other
25.11 3 1
Buildings

Apartment/Shops/Other
24.33 3 1
Buildings
Apartment/Shops/Other
25.11 3 1
Buildings
(vi) Quarterly schedule of development of whole/remaining part of the project:

(c) Apartments/Shops/Other Buildings

Expenditure incurred till the date of application (In Lakhs)

Particulars Expenditure
Apartments 546

Shops 0
Plots 0
EDC 1827
IDC 1295
Land 33785

Other 3350

Expenditure to be made in each quarter (In Lakhs)

Year-2024
Particulars
Jan-Mar Apr-June July-Sep Oct-Dec
Apartments 0 298 301 498

Shops 0 0 0 0
Plots 0 0 0 0
Other 64 128 565 128
EDC 911.99

Year-2025
Particulars
Jan-Mar Apr-June July-Sep Oct-Dec
Apartments 487 652 694 908
Shops 0 0 0 0
Plots 0 0 0 0
Other 514 256 582 128
EDC 911.99 911.99

Year-2026
Particulars
Jan-Mar Apr-June July-Sep Oct-Dec

Apartments 888 898 908 908


Shops 0 0 0 0
Plots 0 0 911.99 0
Other 532 256 474 385
EDC 911.99 0

Year-2027
Particulars
Jan-Mar Apr-June July-Sep Oct-Dec
Apartments 1034 1641 1797 2167
Shops 0 0 0 0
Plots 0 0 0 0

Other 294 256 493 256


EDC 911.99 911.99

Year-2028
Particulars
Jan-Mar Apr-June July-Sep Oct-Dec

Apartments 2714 3515 4331 4554


Shops 0 0 0 0
Plots 0 0 0 0
Other 440 128 256 256
EDC 908.96

Year-2029
Particulars
Jan-Mar Apr-June July-Sep Oct-Dec
Apartments 4649 4979 5071 5255
Shops 0 0 0 0
Plots 0 0 0 0
Other 385 641 898 1026

Year-2030
Particulars
Jan-Mar Apr-June July-Sep Oct-Dec

Apartments 5298 5357 5416 5461


Shops 0 0 0 0
Plots 0 0 0 0
Other 769 256 385 128

Year-2031
Particulars
Jan-Mar Apr-June July-Sep Oct-Dec
Apartments 5347 5608 5196 4991
Shops 0 0 0 0
Plots 0 0 0 0
Other 256 256 256 256

Year-2032
Particulars
Jan-Mar Apr-June July-Sep Oct-Dec
Apartments 4443 4024 3521 3265
Shops 0 0 0 0

Plots 0 0 0 0
Other 256 256 256 256

Year-2033
Particulars
Jan-Mar Apr-June July-Sep Oct-Dec
Apartments 2872 2741 2771 2682

Shops 0 0 0 0
Plots 0 0 0 0
Other 256 256 256 256

Particulars Year-2034
Jan-Mar Apr-June July-Sep Oct-Dec
Apartments 2133 2069 2062 1787

Shops 0 0 0 0
Plots 0 0 0 0
Other 256 128 128 128

Year-2035
Particulars
Jan-Mar Apr-June July-Sep Oct-Dec
Apartments 1158
Shops 0

Plots 0
Other 192
(d) Infrastructure

Expenditure incurred till the date of application (In Lakhs)

Particulars Expenditure
Roads & Pavements 0
Water Supply System 0
Sewerage treatment & garbage disposal 0

Electricity Supply System 0


Storm Water Drainage 0
Parks and Playgrounds 0
Clubhouse/community centres 0
Shopping area 0
Other 0
Electrical sub station 0
Hardscape 0
Highside 0
Landscape 0

School 0
Security and fire fighting 0
Signages 0
Softscape 0
Street Lighting 0
Expenditure to be made in each quarter (In Lakhs)

Year-2024
Particulars Apr- July-
Jan-Mar Oct-Dec
June Sep
Roads & Pavements 0 0 0

Water Supply System 0 0 0


Sewerage treatment & garbage disposal 0 0 0
Electricity Supply System 0 0 0
Storm Water Drainage 0 0 0
Parks and Playgrounds 0 0 0
Clubhouse/community centres 0 0 0
Shopping area 0 0 0
Other 0 0 0

Year-2025
Particulars Apr- July-
Jan-Mar Oct-Dec
June Sep
Roads & Pavements 0 0 0 0
Water Supply System 0 0 0 0
Sewerage treatment & garbage disposal 0 0 0 0
Electricity Supply System 0 0 0 0
Storm Water Drainage 0 0 0 0
Parks and Playgrounds 0 0 0 0
Clubhouse/community centres 0 0 0 0
Shopping area 0 0 0 0
Other 0 0 0 0

Year-2026
Particulars Apr- July-
Jan-Mar Oct-Dec
June Sep
Roads & Pavements 0 0 0 6
Water Supply System 12 12 12 12
Sewerage treatment & garbage disposal 0 1 1 1
Electricity Supply System 56 56 56 56
Storm Water Drainage 4 4 4 4
Parks and Playgrounds 0 0 0 0
Clubhouse/community centres 0 0 0 0
Shopping area 0 0 0 0
Other 0 0 0 0

Year-2027
Particulars Apr- July-
Jan-Mar Oct-Dec
June Sep
Roads & Pavements 6 11 11 11
Water Supply System 24 24 24 36
Sewerage treatment & garbage disposal 1 2 2 2
Electricity Supply System 111 111 111 167
Storm Water Drainage 8 8 8 12
Parks and Playgrounds 0 0 0 0
Clubhouse/community centres 0 0 0 0

Shopping area 0 0 0 0
Other 0 51 101 101
Hardscape 8 8 8 8
Highside 9 17 17
Security and fire fighting 34 34
Landscape 8 8

Year-2028
Particulars Apr- July-
Jan-Mar Oct-Dec
June Sep

Roads & Pavements 11 17 17 17


Water Supply System 36 36 36 36
Sewerage treatment & garbage disposal 2 2 2 2
Electricity Supply System 167 167 167 167
Storm Water Drainage 12 12 12 12
Parks and Playgrounds 0 0 0 0
Clubhouse/community centres 0 40 41 41
Shopping area 0 0 0 0
Other 101 101 202 202
Hardscape 15 15 15 23
Highside 17 17 34 34
Landscape 15 15 23 23
Signages 2 2 2 2

Electrical sub station 6 6 6 6


Softscape 0 0 0 0
School 0 19 19 19
Security and fire fighting 68 68 102 102
Street Lighting 0 0 0 0

Year-2029
Particulars Apr- July-
Jan-Mar Oct-Dec
June Sep
Roads & Pavements 17 17 17 17

Water Supply System 36 36 36 49


Sewerage treatment & garbage disposal 2 2 2 2
Electricity Supply System 167 167 167 222
Storm Water Drainage 12 12 12 16
Parks and Playgrounds 0 0 0 0
Clubhouse/community centres 40 40 41 80
Shopping area 0 0 0 0
Other 202 202 202 202
Softscape 0 0 0 0
Hardscape 23 23 30 30
Electrical sub station 12 13 13 19

Signages 4 4 4 6
Landscape 30 30 38 38
Highside 43 43 43 43
Street Lighting 2 2 5 5
Security and fire fighting 136 136 170 170
School 19 19 19 37

Year-2030
Particulars Apr- July-
Jan-Mar Oct-Dec
June Sep
Roads & Pavements 17 22 22 22

Water Supply System 49 49 61 61


Sewerage treatment & garbage disposal 3 3 3 4
Electricity Supply System 222 222 278 278
Storm Water Drainage 16 16 20 20
Parks and Playgrounds 0 0 0 0
Clubhouse/community centres 112 114 115 124
Shopping area 0 0 0 0
Other 253 253 253 253
Electrical sub station 19 19 25 25
Street Lighting 5 7 9 11
Security and fire fighting 170 170 170 204

School 52 53 54 58
Softscape 0 0 0 5
Hardscape 38 38 38 38
Signages 6 6 8 8
Landscape 38 38 38 46
Highside 43 43 43 43

Year-2031
Particulars Apr- July-
Jan-Mar Oct-Dec
June Sep

Roads & Pavements 28 28 28 22


Water Supply System 61 49 49 49
Sewerage treatment & garbage disposal 4 4 3 3
Electricity Supply System 278 222 222 222
Storm Water Drainage 20 16 16 16
Parks and Playgrounds 0 0 0 0
Clubhouse/community centres 123 167 211 211
Shopping area 0 0 0 0
Other 253 253 253 202
Landscape 53 53 46 38
Security and fire fighting 238 238 204 170
School 57 78 99 99
Softscape 8 8 10 10

Hardscape 46 46 46 38
Electrical sub station 31 38 38 44
Signages 10 12 12 14
Highside 43 43 43 34
Street Lighting 14 14 16 16

Year-2032
Particulars Apr- July-
Jan-Mar Oct-Dec
June Sep
Roads & Pavements 22 22 22 17

Water Supply System 49 36 36 36


Sewerage treatment & garbage disposal 3 3 2 2
Electricity Supply System 222 167 167 167
Storm Water Drainage 16 12 12 12
Parks and Playgrounds 0 0 0 0
Clubhouse/community centres 209 209 211 211
Shopping area 0 0 0 0
Other 202 202 202 152
Signages 14 12 12 10
Landscape 38 38 30 30

Electrical sub station 44 38 38 31


Street Lighting 16 14 14 14
Security and fire fighting 170 170 136 136
School 98 98 99 99
Softscape 13 15 18 20
Hardscape 38 30 30 23
Highside 34 26 26 26

Year-2033
Particulars Apr- July-
Jan-Mar Oct-Dec
June Sep
Roads & Pavements 17 17 17 17

Water Supply System 36 36 24 24


Sewerage treatment & garbage disposal 2 2 2 2
Electricity Supply System 167 167 111 111
Storm Water Drainage 12 12 8 8
Parks and Playgrounds 0 0 0 0
Clubhouse/community centres 138 101 106 106
Shopping area 0 0 0 0
Other 152 152 101 101
Electrical sub station 31 19 18 19
Hardscape 23 23 15 15

Softscape 23 23 21 20
School 64 49 48 49
Security and fire fighting 68 68 34 34
Street Lighting 14 11 9 9
Highside 17 17 17 17
Landscape 15 15 8 8
Signages 10 6 6 6

Year-2034
Particulars Apr- July-
Jan-Mar Oct-Dec
June Sep
Roads & Pavements 11 11 11 6
Water Supply System 24 12 12 0
Sewerage treatment & garbage disposal 2 2 1 1
Electricity Supply System 111 56 56 0
Storm Water Drainage 8 4 4 0
Parks and Playgrounds 0 0 0 0
Clubhouse/community centres 103 105 106 78
Shopping area 0 0 0 0
Other 51 51 51 0
Highside 9 9 9 0
Signages 6 6 4 4
Landscape 0 0 0 0

Electrical sub station 19 19 13 13


Hardscape 8 8 8 8
Softscape 18 15 13 10
School 48 49 49 36
Security and fire fighting 0 0 0 0
Street Lighting 9 7 5 2

Year-2035
Particulars
Jan-Mar Apr-June July-Sep Oct-Dec
Roads & Pavements 6
Water Supply System 0

Sewerage treatment & garbage disposal 0


Electricity Supply System 0
Storm Water Drainage 0
Parks and Playgrounds 0
Clubhouse/community centres 6
Shopping area 0
Other 0
Hardscape 0
Landscape 0
Highside 0
Street Lighting 0

Security and fire fighting 0


School 3
Softscape 3
Signages 2
Electrical sub station 6

It is hereby stated and declared and the above information is correct and true and nothing has been
concealed or misrepresented.

Signature of the Applicant / Authorised Representative


Stamp _____________
Date _____________
FORM REP-I
Part - D

Accounts related information:

1. Annex copy of the balance sheet of last 3 years Yes


2. In case of on-going projects,cash flow statement
since start of the project up-to-date in folder D.
Total receipt of funds, sources of funds and No
deployment of funds should be stated in tabulated
form.
3. Bank account to which the deposits received from
apartment buyers will be credited
AXIS BANK LIMITED, STS 25 & 45, GR,
BOYS PG BEHIND DLF STAR MALL,
Bank and Branch address
TOWER, SECTOR 30, GURUGRAM,
HARYAN
Bank Account number 923020071940926
IFSC code UTIB0003622
MICR code 110211230
Branch code 003622
4. Name and address of the person/persons who
Sushil Kumar S/O: Kali Dass, Bah (391),
would ordinarily be operating the account (Change at
Mandi, Himachal Pradesh, 175049
any time must be intimated to the Authority)
5. Attach certificate issued by a Chartered
Accountant that the applicant has not defaulted in its
Yes
debt liabilities in the past five years in folder D. (In
case of default, give details)

I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.

Signature of the Applicant / Authorised


Representative
Stamp _____________
Date _____________
FORM REP-I
Part - E

Details of the statutory approvals:

1. Annex copies of the following in Folder E:

i. Lay out Plan No


ii. Demarcation Plan Yes
iii. Zoning Plan Yes
iv. Building Plan Yes
Site Plan Yes
Floor Plan Yes
Apartment Plans Yes
Elevation Section Yes
Detail of Permissible FAR Yes
Detail of covered area achieved FAR Yes
2. Annex copies of the following in Folder E:

I. ROADS AND PAVEMENT PLAN No


II. ELECTRICITY SUPPLY PLAN No
III. WATER SUPPLY PLAN No
IV. SEWERAGE AND GARBAGE DISPOSAL PLAN No
V. STROM WATER DRAINAGE No
VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY No
VII. STREET LIGHTING PLAN Yes
VIII. PARKING PLAN Yes
3. Statutory Approvals Status

Statutory Approvals
Statutory Approvals Date
Status
ALREADY BEEN 13-02-
I. LETTER OF INTENT (LOI)
OBTAINED 2023
ALREADY BEEN 20-07-
II. LICENCE NO. 151 OF 2023
OBTAINED 2023
ALREADY BEEN 16-08-
III. NOC FOR HEIGHT CLEARANCE
OBTAINED 2023
ALREADY BEEN 25-08-
IV. ASSURANCE OF WATER SUPPLY
OBTAINED 2023

ALREADY BEEN 25-08-


V. ASSURANCE OF ELECTRICAL LOAD
OBTAINED 2023
ALREADY BEEN 23-08-
VI. ASSURANCE OF SEWERAGE CONNECTION
OBTAINED 2023
ALREADY BEEN 23-08-
VII. ASSURANCE OF STORM WATER CONNECTION
OBTAINED 2023
VIII. ASSURANCE OF WATER SUPPLY FOR ALREADY BEEN 23-08-
CONSTRUCTION PURPOSE OBTAINED 2023
ALREADY BEEN 12-05-
IX. APPROVAL OF FOREST NOC
OBTAINED 2023
ALREADY BEEN 28-07-
X. APPROVAL OF ARAVALI NOC
OBTAINED 2023
ALREADY BEEN 08-12-
XI. APPROVAL OF ENVIRONMENT CLEARANCE
OBTAINED 2023
ALREADY BEEN 21-07-
XII. ZONING PLAN
OBTAINED 2023
ALREADY BEEN 01-02-
XIII. BUILDING PLAN APPROVAL
OBTAINED 2024

It is undertaken that the project shall be completed within the time schedule given in Part C and the
same will not be delayed on account of non- receipt of any of the statutory approval. The liability for
the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay,
compensation as per law may be given to the allottees.

Signature _____________
Seal _____________
Date _____________
FORM REP-I
Part - F

1. A copy of the draft allotment letter by which the apartment shall


be allotted/ booked in favour of the apartment buyers. Yes
(Annex a copy in Folder F)

2. A copy of the Draft Agreement which shall be made before


seeking any deposit exceeding 10% of the cost of the apartment.
Yes
(Based on the model agreement prescribed in the Rules)
(Annex a copy in Folder F)

3. Gist of the important provisions of the Draft Agreement The draft agreement is in the
(Annex a copy in Folder F) prescribed format

I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.

Signature of the Applicant /


Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - G

Projects launched by the promoter in last five years:


1. Name and location of the project GODREJ RETREAT AROMA
2. Particulars of the project in brief:
i. Total area of the project 9.7063
ii. Total number of apartments 0
iii. Total number of plots 180
3. The number of plots/ apartments booked/sold to the
allottees:
(a) Apartments 0
(b) Plots 177
4. Details of the expenditure incurred upto date:

Initially Expenditure incurred


Revised
estimated upto the date of
cost (In
cost (In application (In
Lakhs)
Lakhs) Lakhs)

Total cost of the project


3223.82 2885.79 2424.21
(Other than cost of land)

Cost of the apartments 0 0 0

Cost of the infrastructure 399.18 399.18 234.43

Others costs 4344.52 4830.49 4830.49

5. Total amount of money collected from current allottees of


5763 Lakhs
the apartments/ plots upto the date of filing this application.
6. Remaining amount of sale price money to be collected from
4650 Lakhs
the current allottees of the apartments.
7. Loan sanctioned by the banks/ other financial institutions
0 Lakhs
against the project.
8. Amount drawn from the banks/ other financial institutions till
0 Lakhs
the date of filing this application.
9. Whether any litigation is pending against the Project:
Yes/No No
(If yes-give Annex details in folder G)
10. Initial date of completion of the project. 08-12-2022
11. Likely date of completion of the project. 08-12-2022

I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.

Signature of the Applicant /


Authorised Representative
Stamp _____________
Date _____________
FORM REP-I
Part - H

SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
FLOORING DETAILS OF
1 VITRIFIED TILES / CERAMIC TILES
VARIOUS PARTS OF HOUSE
2 WALL FINISHING DETAILS ACRYLIC EMULSION/ OIL BOUND DISTEMPER
FLOOR: VITRIFIED TILES WALL: CERAMIC TILES 2'-0"
3 KITCHEN DETAILS ABOVE COUNTER & OIL BOUND DISTEMPER
CEILING: OIL BOUND DISTEMPER
4 BATHROOM FITTINGS ALL PROVIDED WITH STANDARD COMPANY MAKE
LAMINATE FINISH FLUSH DOORS/MOULDED
5 WOOD WORK ETC SHUTTER WITH WOODEN FRAME)(PREHUNG- LVL
WITH LAMINATE)
LAMINATE FINISH FLUSH DOORS/MOULDED
6 DOORS AND WINDOS FRAMES SHUTTER WITH WOODEN FRAME)(PREHUNG- LVL
WITH LAMINATE)
7 GLASS WORK 4MM & ABOVE AS PER SPECIFICATION
8 ELECTRIC FITTINGS AS PER BUILDING NORMS
CONDUCTING AND WIRING
9 AS PER BUILDING NORMS
DETAILS
10 CUPBOARD DETAILS NA
UNDERGROUND WASTER TANK & OVERHEAD
11 WATER STORAGE
WATER TANK

12 LIFT DETAILS 3 IN EACH TOWER- 2 PASSENGER AND 1 SERVICE


13 EXTERNAL GLAZINGS NA
13.1 WINDOWS/GLAZINGS POWDER COATED ALUMINUM / UPVC
(LAMINATE FINISH FLUSH DOORS/MOULDED
14 DOORS SHUTTER WITH WOODEN FRAME) (PREHUNG- LVL
WITH LAMINATE)
(LAMINATE FINISH FLUSH DOORS/MOULDED
14.1 MAIN DOORS SHUTTER WITH WOODEN FRAME)(PREHUNG- LVL
WITH LAMINATE)
(LAMINATE FINISH FLUSH DOORS/MOULDED
14.2 INTERNAL DOORS SHUTTER WITH WOODEN FRAME)(PREHUNG- LVL
WITH LAMINATE)
15 AIR CONDITIONING NA
16 ELECTRICAL FITTINGS AS PER BUILDING NORMS
17 CNG PIPE LINE NA
PROVISION OF WIFI AND
18 NA
BROADBAND FACILITY
EXTERNAL
19 TBD
FINISHING/COLOUR SCHEME
PROVIDING AND APPLYING 10 TO 12MM THICK
20 INTERNAL FINISHING PLASTER TO MASONRY AND RCC WALLS, COLUMNS
ETC. IN CEMENT MORTAR 1:5
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1.1 FLOOR VITRIFIED TILES
1.2 WALLS ACRYLIC EMULSION/ OIL BOUND DISTEMPER
1.3 CEILING OIL BOUND DISTEMPER
2 . MASTER BEDROOM/DRESSROOM
2.1 FLOOR LAMINATED WOODEN FLOORING
2.2 WALLS ACRYLIC EMULSION
2.3 CEILING OIL BOUND DISTEMPER
2.4 MODULAR WARDROBES NA
3 . MASTER TOILET

3.1 FLOOR ANTI SKID CERAMIC TILES


CERAMIC TILES TILL 7' ON ALL SIDES & OIL
3.2 WALLS
BOUND DIST
3.3 CEILING GRID CEILING
3.4 COUNTERS GRANITE
SANITARY WARE/CP
3.5 ALL PROVIDED OF STANDARD COMPANY NAME
FITTINGS
3.6 FITTING/FIXTURES ALL PROVIDED OF STANDARD COMPANY NAME
4 . BED ROOMS

4.1 FLOOR LAMINATED WOODEN FLOORING


4.2 WALLS ACRYLIC EMULSION
4.3 CEILING OIL BOUND DISTEMPER
4.4 WARDROBES NA
5 . TOILET
5.1 FLOOR ANTI SKID CERAMIC TILE
5.2 WALLS ACRYLIC EMULSION / OIL BOUND DISTEMPER
5.3 CEILING OIL BOUND DISTEMPER
5.4 COUNTERS GRANITE
SANITARY WARE/CP
5.5 ALL PROVIDED OF STANDARD COMPANY NAME
FITTINGS
5.6 FIXTURES ALL PROVIDED OF STANDARD COMPANY NAME
6 . KITCHEN
6.1 FLOOR VITRIFIED TILES
6.2 WALLS OIL BOUND DISTEMPER
6.3 CEILING OIL BOUND DISTEMPER
6.4 COUNTERS CERAMIC TILES 2FT ABOVE COUNTER
6.5 FIXTURES ALL PROVIDED OF STANDARD COMPANY NAME
6.6 KITCHEN APPLIANCES NA

7 . UTILITY ROOMS/UTILITY BALCONY/TOILET


7.1 FLOOR VITRIFIED TILES
7.2 WALLS & CEILING ACRYLIC EMULSION / OIL BOUND DISTEMPER
7.3 TOILET ANTI SKID TILE
7.4 BALCONY VITRIFIED TILES
8 . SIT-OUTS

8.1 FLOOR ANTI SKID CERAMIC TILE


8.2 WALLS & CEILING ACRYLIC EMULSION / OIL BOUND DISTEMPER
8.3 RAILINGS MS STEEL
8.4 FIXTURES ALL PROVIDED OF STANDARD COMPANY NAME

I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.

Signature of the Applicant / Authorised Representative


Stamp _____________
Date _____________
List of Uploaded Documents

Date of
Sr. View
Document Description Document
No. Document
Upload
View
1 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 18-01-2024
Document
View
2 ZONING PLAN 18-01-2024
Document
3 APPROVAL OF SEWERAGE ASSURANCE 18-01-2024 ------
4 FOREST NOC 18-01-2024 ------
5 APPROVAL OF WATER ASSURANCE 18-01-2024 ------
6 APPROVAL OF ELECTRICAL ASSURANCE 18-01-2024 ------
7 APPROVAL OF STORM WATER ASSURANCE 18-01-2024 ------
APPROVAL OF SUPPLY OF TREATED WATER FOR
8 18-01-2024 ------
CONSTRUCTION
9 ENVIRONMENT CLEARANCE 18-01-2024 ------
10 ARAVALI NOC 18-01-2024 ------
11 NOC FOR HEIGHT CLEARANCE 18-01-2024 ------
NON DEFAULT CERTIFICATE FROM A CHARTERED View
12 27-01-2024
ACCOUNTANT Document
View
13 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 27-01-2024
Document
View
14 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 31-01-2024
Document
DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY View
15 31-01-2024
THE PROMOTER TO BE ENCLOSED. Document

CERTIFICATE FROM A CHARTERED ACCOUNTANT


CERTIFYING THAT THE INFORMSTION PROVIDED BY THE
View
16 APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE 27-01-2024
Document
BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE
APPLICANT
17 APPROVAL OF BUILDING PLAN 01-02-2024 ------
A COMPLETE SET OF THE LAST APPROVED BUILDING View
18 05-02-2024
PLANS Document
IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A View
19 05-02-2024
COPY OF THE APPROVED SITE PLAN Document

I hereby declare that the above information and particulars are based on record and are true to the
best of my knowledge and belief and nothing has been concealed.