100% found this document useful (1 vote)
138 views5 pages

HDD Calculation For Rupen River

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
138 views5 pages

HDD Calculation For Rupen River

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

OIL AND NATURAL GAS CORPORATION LIMITED

Air & Gas Pipeline Replacement Project of Mehsana Asset


(APPRP_MHN)

HDD DESIGN CALCULATION FOR RUPEN RIVER

AGPRP-MEH-PL-DO-HDD-A-07

B 30.10.2024 Issued for Approval AK SKK VG

A 18.10.2024 Issued for Approval AK SKK VG

Rev. Date Purpose of Issue Prepared By Checked By Approved By

Engineering Consultant LSTK Contractor

HDD DESIGN CALCULATION


Air & Gas Pipeline Replacement Project of Mehsana Asset (APPRP_MHN)

HDD DESIGN CALCULATIONS


LSTK CONTRACTOR : CORRTECH INTERNATIONAL PVT. LTD.
ENGINEERING CONSULTANT: LYONS ENGINEERING PVT. LTD.
RUPEN RIVER CROSSING, BALOL DC-II TO LANWA GGS III AT CH: 00+000.00 TO 00+700.00, (AIR INJECTION LINE)
RIVER CROSSING CH: (00+571.39 KM)
Outside Diameter Do 21.9 cm Refe. Drg.
Inside Diameter Di 18.7 cm Calaculated
Wall Thickness T 1.59 cm Refe. Drg.
Pipe Grade X 46 Refe. Drg.
SMYS of Materials SMYS 3234.9 Kg/cm2 Given
SECTION MODULUS Z 480.4 cm3 Calaculated
Weight of Empty Pipe in Air Wp 0.05 Kg/cm Calaculated
Weight of Water filled Pipe in Air Ww 1.23 Kg/cm Calaculated
Modulus of Elasticity E 2038902 Kg/cm2 Given
Radius of Curvature R 30500 cm Refe. Drg.
2
Co-efficient of Drag fs 0.00352 Kg/cm Standard
Density of Mud Db 0.00115 Kg/cm3 Standard
Proposed Length L 21559.00 cm Refe. Drg.
Entry Angle Q1 8.0000 Deg
Exit Angle Q2 8.0000 Deg
Maximum Depth of Profile H 813.60 cm Refe. Drg.
Design Pressure P 138.00 Kg/cm2 Given
Hydrotest Pressure (1.5 X Design Pressure) Pre Pre Teast 207 Kg/cm2 Calaculated
Hydrotest Pressure (1.5 X Design Pressure) Post Post Teast 207 Kg/cm2 Calaculated
Length of one Drill Pipe Ld 3.00 m
Weight of one Drill Pipe Wd 11.74 Kg/m
Total weight of Drill pipe to be used - 253083.90 Kgs Calaculated
Co-efficient of friction down hole μf 0.36 Standard
Static friction co-efficient on roller μs 0.2 Standard
Remer Weight (Maximum Considered) Rw 750 Kg Standard
Soil density Ds 0.00185 Kg/cm2
water density Dw 0.001 Kg/cm3 Standard
B
Rig Capacity 45 Tons Given

REFERENCE :-
I)ALIGNMENT SHEET CH. 0+000.00 TO 0+700.00 KM
II) SOIL REPORT DOCUMENT NO - VGPL/24-25/0523/R4
III) PIPELINE DESIGN BASIS DOCUMENT NO- AGPRP-MEH-PL-DO-DBS-A-01
IV) DATA SHEET SEAMLESS LINE DOCUMENT NO - ADPRP-MEH-PL-DS-SML-A-10
V) RIG CAPACITY M/S CIL MAIL DATED 17/10/2024
Air & Gas Pipeline Replacement Project of Mehsana Asset (APPRP_MHN)

HDD DESIGN CALCULATIONS


LSTK CONTRACTOR : CORRTECH INTERNATIONAL PVT. LTD.
ENGINEERING CONSULTANT: LYONS ENGINEERING PVT. LTD.
RUPEN RIVER CROSSING, BALOL DC-II TO LANWA GGS III AT CH: 00+000.00 TO 00+700.00, (AIR INJECTION LINE)
RIVER CROSSING CH: (00+571.39 KM)

1.0 CROSS AREA SEECTIONAL

2 2
AS = π/4(Do -Di )
2
= 101.40 cm

2.0 MOMENT OF INERTIA


4 4
I= π/64(Do -Di )
4
= 5260.42 cm

3.0 BUOYANT WEIGHT OF PIPE

W= WEIGHT OF WATER FILLED PIPE - BUOYANCY OF PIPE

= 0.840 Kg/cm

COMBINED STRESS LIMITATION


= 90%SMYS
= 204.7 Kg/cm2

HOOP STRESS + TENSILE STRESS


= 90%SMYS
= 204.7 Kg/cm2

4.0 OVERBURDEN PRESSURE & COLLAPSE PRESSURE

COLLAPSE PRESSURE (Pc) = 2E/{(1-μ2)*(D/T)*(D/T‐1)2 D/T = 13.77

= 2060 Kg/cm2

VBERBURDEN PRESSURE (Po) = HDb+HsDs+HwDw


= 10 Kg/cm2

Pc/Po = 206 PIPE IS SAFE

5.0 BUOYANCY OF PIPE


2
B= π/4(Do )*Db
= 0.43 Kg/cm

6.0 NET BUOYANCY


= B-Wp
= 0.38 Kg/cm

7.0 MAXIMUM TENSILE STRESS


T= 45/163.27*1000
= 443.8 Kg/cm2

13.7 % OF SMYS

8.0 MAXIMUM BENDING STRESS

ROC = 25000 cm

Bending Stress = EY/R


2
893.04 Kg/cm
27.61 % OF SMYS

9.0 COMBINED TENSILE & BENDING STRESS


= (ft/0.9*SMYS)+(fb/0.9*SMYS
= 0.44 SMYS < 1.00

IS SAFE
Air & Gas Pipeline Replacement Project of Mehsana Asset (APPRP_MHN)

HDD DESIGN CALCULATIONS


LSTK CONTRACTOR : CORRTECH INTERNATIONAL PVT. LTD.
ENGINEERING CONSULTANT: LYONS ENGINEERING PVT. LTD.
RUPEN RIVER CROSSING, BALOL DC-II TO LANWA GGS III AT CH: 00+000.00 TO 00+700.00, (AIR INJECTION LINE)
RIVER CROSSING CH: (00+571.39 KM)

10.0 BEFORE INSTALLATION DURING HYDROTEST

HOOP STRESS = PD/2T


= 1425.6 Kg/cm2

44.1 % OF SMYS

11.0 BENDING MOMENT FOR PIPE

800 cm Support
= WwL2/12
= 65600 Kg/cm

BENDING STRESS = 65600/480.4


2
136.55 Kg/cm

TOTAL STRESS = HOOP STRESS + BENDING STRESS


2
= 1562.1 Kg/cm

COMBINED LONGITUDIONAL STRESS

= ϒ(Hoop Stress)-Ea(T1-T2)+Bending Stress


2
= 634 Kg/cm

Equ. STRESS
2 2
= √Hoop Stress +Long. Stress -Hoop Stress*Long Stress

2
= 1237.09 Kg/cm

38.2 % OF SMYS

12.0 AFTER INSTALLATION

Hoop Stress = 1425.6 Kg/cm2


Bending Stress (Tb) = 893.04 Kg/cm2

COMBINED LONGITUDIONAL STRESS

= ϒ(Hoop Stress)-Ea(T1-T2)+Bending Stress


= 1419 Kg/cm2

Equ. STRESS
2 2
√Hoop Stress +Long. Stress -Hoop Stress*Long Stress
= 1422 Kg/cm2

44 % OF SMYS

13.0 DURIND OPERATION

Hoop Stress = 950.4 Kg/cm2

COMBINED LONGITUDIONAL STRESS

= ϒ(Hoop Stress)-Eb+Ea(T1-T2)

= 1252 Kg/cm2
Equ. STRESS
= 2 2
√Hoop Stress +Long. Stress -Hoop Stress*Long Stress
= 1571 Kg/cm2
49 % OF SMYS
Air & Gas Pipeline Replacement Project of Mehsana Asset (APPRP_MHN)

HDD DESIGN CALCULATIONS


LSTK CONTRACTOR : CORRTECH INTERNATIONAL PVT. LTD.
ENGINEERING CONSULTANT: LYONS ENGINEERING PVT. LTD.
RUPEN RIVER CROSSING, BALOL DC-II TO LANWA GGS III AT CH: 00+000.00 TO 00+700.00, (AIR INJECTION LINE)
RIVER CROSSING CH: (00+571.39 KM)

14.0 PULL FORCE

πDLfs+fwL+DbHA (A= π/4*D2)

= (3.14*21.9*215.59*0.0035)+(0.36*21559*0.38)+(0.00115*813.6*376.5)
= 5218.49 + 6519.44 + 352.26
= 12090.20 Kg
= 12.09 Tons CONSIDERING SAFETY FACTOR 2 TIME

= 24.18 Tons

53.7 % of Force Required to Rig Capacity B