SOAL
SOAL
DAK ATAP
P+11.30
LANTAI 2
P+7.80
LANTAI 1
P+4.30
LT.DASAR
P±0.00
TAMPAK DEPAN
SKALA 1 : 100
160 400 200 200 300 300
D
-2.95 KELUAR
GUTTER
3000
R. GENSET -2.90 -2.92 GUTTER TERBUKA RAMP
FLOOR HARDENER
FLOOR HARDENER NK
KERAMIK 40/40
C
AREA PARKIR
5000
RAMP
-3.00
FLOOR HARDENER
GUTTER FLOOR HARDENER
-3.00 R.POMPA
RAMP FLOOR HARDENER 1900
-2.90
6000
FLOOR HARDENER
FLOOR
HARDENER
KERAMIK 30/30
-2.98 -2.95
-2.98 R.PANEL
TOILET
A -2.90
1500
FLOOR HARDENER
4000
GUTTER
MASUK
1 2 3 4 5 6 7
D D
150
KELUAR
300
300
KLUIS
BACK OFFICE DINDING GYPSUM
150
VOID RANGKA HOLLOW
±0.00
C NK TR BAK BUNGA
C
120
ATM
1
±0.00
300
RAILING
2 TOILET
190 -0.05
WANITA
500
-0.02
SHAFT
B'
TOILET
200
190
200
BANKING HALL
±0.00
A'
600
RAMP
NK
400
LOADING
(RAMP)
A ENTRANCE
A
±0.00
GUITTER
400
BAK BUNGA
GUITTER
MASUK
1 2 3 4 5 6 7
225 150
D D
150
GUDANG TMPT
300 WUDHU
300
MUSHOLA R . SERVER
PANTRY
C 150 C
120
NK TR
300
TOILET
WANITA
190
500
SHAFT
B'
TOILET
200
PRIA
190
B B
200
R . KERJA
+ 4.30
A'
TR
R . ARSIP
600
R=
+ 4.30
200
4
00
NK
400
150
A A
100
BORDES
+ 1.98
50
400
PLAT BETON
80 100 170
1 2 3 4 5 6 7
80
150
70
RANGKA HOLLOW 4/4
1200
DINDING PAS. 1/2 BATA
950
ADUKAN KUAT 1 : 3
ENGSEL
100
100
40 600 40
120
PLAT DAK ATAP
1 2 3 4 5 6 7
350 300 350 400 400 400 500
225
SHAFT CEROBONG GENSET 1
D D
150
150
300
+11.40
150
150
TR
C C
2 2
300
500
200
RANGKA BAJA
B B
A
200
A'
+11.30
600
400
MENARA
A A
1
350 300 350 400 400 400
1 2 3 4 5 6 7
DENAH ATAP
SKALA 1 : 100
95
DAK ATAP
EL. +11.30
+11.30
85 15 85 15 85 15 85 15 85 15 85 55
PLAFON +10.80
TOILET
WANITA R.PINCAB
R.KERJA
LANTAI 1
EL. +4.30
+4.30
+4.30
130
1,2
TOILET PAGAR TANAMAN
BACK OFFICE R.ATM
WANITA TAMAN
LT.DASAR
EL. 0.00
+0.00 +0.00
AREA PARKIR
-1.00
(PAVING BLOCK)
AREA PARKIR
L.T BASEMENT -3.00
EL. -3.00 GROUND TANK
50
350 300 350 400 400 400 140 25 350 25 1010 150 100
1 2 3 4 5 6 7
225 150
D D
GUDANG
150
150
300
150
150
NK
TR
C C
120
300
-7.78 R. WAPINCAB
TOILET
190
+7.80
SHAFT
B'
TOILET PRIA
200
190
-7.75 -7.78
B B
200
TR
A'
R
R. ARSIP
=
600
40
+7.80
400
A A
BORDES
150
1 2 3 4 5 6 7
UKURAN (cm) 35 X 50 35 X 50 55 X 55 55 X 55 55 X 55 60 X 60 50 X 50 50 X 50 50 X 50 35 X 55 30 X 30 25 X 25
GAMBAR
TULANGAN UTAMA 12 - D 22 8 - D 22 20 - D 22 16 - D 22 12 - D 22 20 - D 22 16 - D 22 12 - D 22 8 - D 22 16 - D 22 8 - D 16 8 - D 16
TULANGAN SENGKANG Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100
K4' SL K1 SL K1 SL K5 SL K5 SL K1
DIMENSI KOLOM
D
TYPE K7 K8
300
SL SL UKURAN (cm) 15 X 65 15 X 80
K1 K2' K1 SL K2' SL K2' K4' K6
C
GAMBAR
300
SL SL SL SL SL
B' K6
TULANGAN UTAMA 8 - D 16 10 - D 16
200
SL SL SL K4'
TULANGAN SENGKANG Ø10 - 100 Ø10 - 100
B
K1 K2' K3 K3
200
SL DIMENSI SLOOF
A'
SL K4' TYPE SL
600
283
SL SL SL
UKURAN (cm) 30 X 55
400
A"
SL SL K4' SL K4' SL K4' SL K4'
K4"
A GAMBAR
127.5
115
K1 K4' K6 K8
165
K7
SL
EL.MUKA ATAS SLOOF -2.10 SL
TULANGAN UTAMA 8 - D 22
283
TULANGAN SAMPING 2 - D13
85 290 335
B1 B1 B1 B1 B1 B1
D
600
285
B1 B2 BA B4 BA B4 B1
B1 B2 BA B4 BA B4 B1 B1
1000
BA BA BA BA BA BA BA
B'
400
BA BA
B3' B3 B3 B3'
B
400
400
BA BA B1' ( 30 x 100 )
BA BA BA BA
A'
B1
BA B4
283
B4 BA B1
B2
800
BA BA
A" BA BA BA
300
234
BA
B1 B1 B1 B1
A B1
230
240
BA BA BA K4'
330
170 580
EMS -1.00
400 300
1 2 3 4 5 6 7
B1 B1 B1 B1 B1 B1 B1
D
3000
B1 B2 BA B4 BA B1 B1
B1 B2 BA B4 BA B1 BA
BA BA BA BA BA BA
B'
2000
BA
B3' B3' B3' B3'
B
2000
BA BA BA B1
BA BA BA BA BA
A'
ELEV.+2.63
2830
B1
1500
BA
4000
B1 B2 BA B4 BA B1
BA BA BA BA
A"
1500
B1 B1 B1 B4 B1 BA B1 B1
A
1000
1000
BA BA BA BA BA BA
1650
BA
BA EMS +1.91
850 2900
1 2 3 4 5 6 7
3530
3530
B1 B1 B1 B1 EML : +7.80 (Lt. 2) B2 B2 B2 B2
EMS : +7.72 (Lt. 2)
3500
3500
B1 B1 B1 B1 EML : +4.30 (Lt. 1) B2 B2 B2 B2
EMS : +4.22 (Lt. 1)
4300
4300
B1 B1 B1 EML : ±0.00 (Lt. Dasar) B2 B2 B2
EMS : -0.08 (Lt. Dasar)
3120
3120
EML : -3.00 (Lt. Basement)
SL SL SL EMS : -3.20 (Lt. Basement) SL SL
1000 800
1000 800
1000 6000 2000 3000 3000 1000 6000 2000 3000 3000
PORTAL AS 1 PORTAL AS 2
SKALA 1 : 100 SKALA 1 : 100
EML :+11.30 (Lt Atap) EML :+11.30 (Lt Atap)
BA BA BA BA BA BA EML :+11.25 (Lt Atap) B5 B5 B5 B5 EML :+11.25 (Lt Atap)
150
110
353
K4' K4' K1'
353
K4" K1' K1'
150
350
K4' K4 K4' K1'
350
K4" K1' K1'
150
430
430
K4' K1 K1
K4' K2 K2' K1
EML :+ 0.00 (Lt Dasar)
EML :- 0.08 (Lt Dasar) B4 B4 B4 B4 B4 B4
BA BA BA BA BA BA EML :+ 0.00 (Lt Dasar)
EML :- 0.08 (Lt Dasar)
K1 K1 150
312
K4'
312
K4' K3 K2' K5
150
EML :-3.00(Lt Basement)
EML :-3.20(Lt Basement) SL SL
EML :-3.00(Lt Basement)
EML :-3.20(Lt Basement)
PORTAL AS 3 PORTAL AS 4
SKALA 1:100 SKALA 1:100
MUTU BETON : K-300
SL : SLOOF 30 x 55cm
TULANGAN : D > 13mm - U 39
Ø > 12mm - U 24 B1 : BALOK INDUK 30 x 60cm
P. CEMENT : SEMEN TYPE I B2 : BALOK INDUK 35 x 60cm
B3, B3' : BALOK INDUK 35 x 70cm
K1, K1' : KOLOM 35 x 50cm B4 : BALOK INDUK 35 x 65cm
K2, K2', K2" : KOLOM 55 x 55cm BA : BALOK ANAK 30 x 50cm
K3 : KOLOM 60 x 60cm
K4, K4', K4" : KOLOM 50 x 50cm
K5 : KOLOM 35 x 35cm
K6 : KOLOM 30 x 30cm
K7 : KOLOM 15 x 65cm
K8 : KOLOM 15 x 80cm
353
K4' K4" K4"
353
K1' K1'
350
K4' K4" K4"
350
K1' K1'
B4 B4 B4 B4 EML : +4.30 (Lt.1) B1 B1 EML : +4.30 (Lt.1)
EMS : +4.22 (Lt.1) EMS : +4.22 (Lt.1)
430
K4'
430
K2' K2'
K4' K4' K4'
K1 K1
B4 B4 B4 EML : ±0.00 (Lt.Dasar) B1 B1 EML : ±0.00 (Lt.Dasar)
EMS : -0.08 (Lt.Dasar) EMS : -0.08 (Lt.Dasar)
312
K4' K3 K2'
312
K4' K4' K4'
110
110
EML : -3.00 (Lt.Basement)
EML : -3.00 (Lt.Basement) EML : -3.00 (Lt.Basement)
SL SL
80
80
EMS : -3.20 (Lt.Basement)
430 430 430
100
430 430
100
55 80 80 55 55 80 80 55 55 80 80 55
55 80 80 55 55 80 80 55
PORTAL AS 6 PORTAL AS 7
SKALA 1 : 100 SKALA 1 : 100