Load Flow Analysis - LF1S - Complete

Load Flow Analysis.LF1S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views12 pages

Load Flow Analysis - LF1S - Complete

Load Flow Analysis.LF1S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Project: load flow analysis ETAP Page: 1

Location: Pune 19.0.1C Date: 26-05-2023


Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Jaidev singh Dhariwal Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 1 6 8

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 8 0 0 2 0 1 11

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: Kirti Govind

Output Filename: C:\ETAP 1901\Kirti Govind \Load Flow Analysis.lfr


Project: load flow analysis ETAP Page: 2
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable / Busway Resistance: Yes Individual


Project: load flow analysis ETAP Page: 3
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 11.000 1 100.0 0.0

Bus2 66.000 1 100.0 0.0

Bus3 66.000 1 100.0 0.0

Bus4 22.000 1 100.0 0.0 2.550 1.580

Bus5 0.415 1 100.0 0.0 3.406 2.111

Bus6 66.000 1 100.0 0.0

Bus7 66.000 1 100.0 0.0

Bus8 11.000 1 100.0 0.0 0.842 0.522 0.008 0.005

Total Number of Buses: 8 6.797 4.213 0.008 0.005 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits


ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus1 11.000 Swing 1 100.0 0.0

Bus8 11.000 Voltage Control 1 100.0 0.0 0.000 0.000 0.000

0.000 0.000
Project: load flow analysis ETAP Page: 4
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal

Line/Cable/Busway Input Data

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (C) R X Y

Cable1 22NCUS1 150 10000.0 0.0 1 75 0.151650 0.125000

Cable3 22NCUS1 150 10000.0 0.0 1 75 0.151650 0.125000

Line / Cable / Busway resistances are listed at the specified temperatures.


Project: load flow analysis ETAP Page: 5
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 3-Phase 110.000 11.000 66.000 12.50 45.00 0 0 0 0 0 12.5000 YNd 0.000


T2 3-Phase 50.000 66.000 22.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 0.000
T3 3-Phase 5.000 22.000 0.415 7.15 8.50 0 0 0 0 0 7.1500 Dyn 0.000
T4 3-Phase 5.000 22.000 0.415 8.35 13.00 0 0 0 0 0 8.3500 Dyn 0.000
T7 3-Phase 50.000 66.000 22.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 0.000
T8 3-Phase 110.000 11.000 66.000 12.50 45.00 0 0 0 0 0 12.5000 YNd 0.000
T11 3-Phase 5.000 22.000 0.415 7.15 8.50 0 0 0 0 0 7.1500 Dyn 0.000
T12 3-Phase 5.000 22.000 0.415 8.35 13.00 0 0 0 0 0 8.3500 Dyn 0.000
Project: load flow analysis ETAP Page: 6
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus1 Bus2 0.25 11.36 11.36

T2 2W XFMR Bus3 Bus4 0.56 24.99 25.00


T3 2W XFMR Bus4 Bus5 16.71 142.02 143.00

T4 2W XFMR Bus4 Bus5 12.81 166.51 167.00

T7 2W XFMR Bus7 Bus4 0.56 24.99 25.00

T8 2W XFMR Bus1 Bus6 0.25 11.36 11.36

T11 2W XFMR Bus4 Bus5 16.71 142.02 143.00

T12 2W XFMR Bus4 Bus5 12.81 166.51 167.00

Cable1 Cable Bus2 Bus3 3.48 2.87 4.51

Cable3 Cable Bus6 Bus7 3.48 2.87 4.51

CB11 Tie Breakr Bus8 Bus1


Project: load flow analysis ETAP Page: 7
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 11.000 100.000 0.0 6.823 4.381 0.000 0.000 Bus2 2.986 1.927 186.6 84.0

Bus6 2.986 1.927 186.6 84.0

Bus8 0.850 0.527 52.5 85.0

Bus2 66.000 99.774 -0.2 0.000 0.000 0.000 0.000 Bus3 2.986 1.913 31.1 84.2

Bus1 -2.986 -1.913 31.1 84.2

Bus3 66.000 99.615 -0.2 0.000 0.000 0.000 0.000 Bus2 -2.982 -1.909 31.1 84.2

Bus4 2.982 1.909 31.1 84.2

Bus4 22.000 99.122 -0.6 0.000 0.000 2.550 1.580 Bus3 -2.981 -1.878 93.3 84.6

Bus5 0.930 0.569 28.9 85.3

Bus5 0.776 0.519 24.7 83.1

Bus7 -2.981 -1.878 93.3 84.6

Bus5 0.930 0.569 28.9 85.3

Bus5 0.776 0.519 24.7 83.1

Bus5 0.415 98.158 -1.4 0.000 0.000 3.406 2.111 Bus4 -0.928 -0.552 1530.0 86.0

Bus4 -0.775 -0.504 1310.1 83.8

Bus4 -0.928 -0.552 1530.0 86.0

Bus4 -0.775 -0.504 1310.1 83.8

Bus6 66.000 99.774 -0.2 0.000 0.000 0.000 0.000 Bus7 2.986 1.913 31.1 84.2

Bus1 -2.986 -1.913 31.1 84.2

Bus7 66.000 99.615 -0.2 0.000 0.000 0.000 0.000 Bus6 -2.982 -1.909 31.1 84.2

Bus4 2.982 1.909 31.1 84.2

* Bus8 11.000 100.000 0.0 0.000 0.000 0.850 0.527 Bus1 -0.850 -0.527 52.5 85.0
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
#Indicates a bus with a load mismatch of more than 0.1 MVA
Project: load flow analysis ETAP Page: 8
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 11.000 8.108 84.1 425.6


Bus2 66.000 3.546 84.2 31.1
Bus3 66.000 3.541 84.2 31.1
Bus4 22.000 2.550 1.580 7.046 84.6 186.6
Bus5 0.415 3.406 2.111 4.007 85.0 5679.0
Bus6 66.000 3.546 84.2 31.1
Bus7 66.000 3.541 84.2 31.1
Bus8 11.000 0.842 0.522 0.008 0.005 1.000 85.0 52.5

*Indicates operating load of a bus exceeds the bus critical limit (100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: load flow analysis ETAP Page: 9
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
(Amp) Amp (MVA)
ID Type % MVA % MVA %

Cable1 Cable 333.53 31.09 9.32

Cable3 Cable 333.53 31.09 9.32

T1 Transformer 110.000 3.554 3.2 3.546 3.2

T2 Transformer 50.000 3.541 7.1 3.523 7.0

T3 Transformer 5.000 1.090 21.8 1.080 21.6

T4 Transformer 5.000 0.933 18.7 0.924 18.5

T7 Transformer 50.000 3.541 7.1 3.523 7.0

T8 Transformer 110.000 3.554 3.2 3.546 3.2

T11 Transformer 5.000 1.090 21.8 1.080 21.6

T12 Transformer 5.000 0.933 18.7 0.924 18.5

*Indicates a branch with operating load exceeding the branch capability.


Project: load flow analysis ETAP Page: 10
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable1 2.986 1.913 -2.982 -1.909 4.4 3.6 99.8 99.6 0.16

Cable3 2.986 1.913 -2.982 -1.909 4.4 3.6 99.8 99.6 0.16

T1 2.986 1.927 -2.986 -1.913 0.3 14.4 100.0 99.8 0.23

T11 0.930 0.569 -0.928 -0.552 2.0 17.2 99.1 98.2 0.96

T12 0.776 0.519 -0.775 -0.504 1.1 14.8 99.1 98.2 0.96

T2 2.982 1.909 -2.981 -1.878 0.7 31.6 99.6 99.1 0.49

T3 0.930 0.569 -0.928 -0.552 2.0 17.2 99.1 98.2 0.96

T4 0.776 0.519 -0.775 -0.504 1.1 14.8 99.1 98.2 0.96

T7 -2.981 -1.878 2.982 1.909 0.7 31.6 99.1 99.6 0.49

T8 2.986 1.927 -2.986 -1.913 0.3 14.4 100.0 99.8 0.23

17.2 163.0
* This Transmission Line includes Series Capacitor.
Project: load flow analysis ETAP Page: 11
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable / Busway 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Gen1 Generator Under Excited 0.000 Mvar 0.000 0.0 3-Phase

Gen1 Generator Under Power 0.000 MW 0.000 0.0 3-Phase


Project: load flow analysis ETAP Page: 12
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 6.823 4.381 8.108 84.15 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 6.823 4.381 8.108 84.15 Lagging

Total Motor Load: 6.797 4.213 7.997 85.00 Lagging

Total Static Load: 0.008 0.005 0.010 85.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.017 0.163

System Mismatch: 0.000 0.000

Number of Iterations: 3