Load Flow Analysis - LF1S - Complete
Load Flow Analysis - LF1S - Complete
Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 8 0 0 2 0 1 11
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Total Number of Buses: 8 6.797 4.213 0.008 0.005 0.000 0.000 0.000 0.000
0.000 0.000
Project: load flow analysis ETAP Page: 4
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal
Line/Cable/Busway Length
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
Branch Connections
* Bus1 11.000 100.000 0.0 6.823 4.381 0.000 0.000 Bus2 2.986 1.927 186.6 84.0
Bus2 66.000 99.774 -0.2 0.000 0.000 0.000 0.000 Bus3 2.986 1.913 31.1 84.2
Bus3 66.000 99.615 -0.2 0.000 0.000 0.000 0.000 Bus2 -2.982 -1.909 31.1 84.2
Bus4 22.000 99.122 -0.6 0.000 0.000 2.550 1.580 Bus3 -2.981 -1.878 93.3 84.6
Bus5 0.415 98.158 -1.4 0.000 0.000 3.406 2.111 Bus4 -0.928 -0.552 1530.0 86.0
Bus6 66.000 99.774 -0.2 0.000 0.000 0.000 0.000 Bus7 2.986 1.913 31.1 84.2
Bus7 66.000 99.615 -0.2 0.000 0.000 0.000 0.000 Bus6 -2.982 -1.909 31.1 84.2
* Bus8 11.000 100.000 0.0 0.000 0.000 0.850 0.527 Bus1 -0.850 -0.527 52.5 85.0
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
#Indicates a bus with a load mismatch of more than 0.1 MVA
Project: load flow analysis ETAP Page: 8
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal
*Indicates operating load of a bus exceeds the bus critical limit (100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: load flow analysis ETAP Page: 9
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
(Amp) Amp (MVA)
ID Type % MVA % MVA %
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable1 2.986 1.913 -2.982 -1.909 4.4 3.6 99.8 99.6 0.16
Cable3 2.986 1.913 -2.982 -1.909 4.4 3.6 99.8 99.6 0.16
T11 0.930 0.569 -0.928 -0.552 2.0 17.2 99.1 98.2 0.96
T12 0.776 0.519 -0.775 -0.504 1.1 14.8 99.1 98.2 0.96
17.2 163.0
* This Transmission Line includes Series Capacitor.
Project: load flow analysis ETAP Page: 11
Location: Pune 19.0.1C Date: 12-05-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Kirti Govind Config.: Normal
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable / Busway 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Critical Report
MW Mvar MVA % PF
Number of Iterations: 3