0% found this document useful (0 votes)
11 views

Bill of Putaties

BOQ

Uploaded by

Jude Tanig
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Bill of Putaties

BOQ

Uploaded by

Jude Tanig
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

BILL OF QUANTITIES

PROJECT: 2- STOREY RESIDENTIAL BUILDING


LOCATION: Blk 17 Lot 20 Casa Buena De Pulilan Subd., Brgy. Cutcot, Pulilan, Bulacan
OWNER: Ar. Estavillo
DATE: May 21, 2023
ITEM OF WORK
QUANTITY UNIT UNIT COST TOTAL COST
NO. DESCRIPTION
GENERAL REQUIRMENTS
1 Living area flooring 19.25 sqm ₱ 136.50 ₱ 2,627.63
2 Dining area flooring 13.3 sqm ₱ 136.50 ₱ 1,815.45
3 Kitchen area flooring 15.75 sqm ₱ 351.00 ₱ 5,528.25
4 Bedroom flooring 54.11 sqm ₱ 136.50 ₱ 7,386.02
5 Laundry area flooring 5.63 sqm ₱ 266.50 ₱ 1,500.40
6 Toilet and Bath flooring 13.38 sqm ₱ 266.50 ₱ 3,565.77
7 Lanai flooring 6.72 sqm ₱ 175.50 ₱ 1,179.36
8 Hallway flooring 13.04 sqm ₱ 136.50 ₱ 1,779.96
9 Balchony flooring 9.98 sqm ₱ 136.50 ₱ 1,362.27
10 Exterior wall: Stucco textured 33.14 sqm ₱ 244.73 ₱ 8,110.19
11 Exterior wall: Accent stone 15.92 sqm ₱ 1,456.00 ₱ 23,179.52
12 Exterior wall: Smooth plain 159.68 sqm ₱ 217.10 ₱ 34,666.53
13 Interior wall tiles: Toilet and bath 62.48 sqm ₱ 266.50 ₱ 16,650.92
14 Non-exposed ceiling 94.34 sqm ₱ 439.40 ₱ 41,453.00
15 Exposed ceiling 35.09 sqm ₱ 557.70 ₱ 19,569.69
16 Textured ceiling 9.98 sqm ₱ 429.00 ₱ 4,281.42
17 Primer 192.82 sqm ₱ 239.36 ₱ 46,153.88
18 Roofing sheets 102.7 sqm ₱ 2,795.00 ₱ 287,046.50
Subtotal: ₱ 507,856.74
DOORS AND WINDOWS
1 Main door 1 set/s ₱ 20,348.90 ₱ 20,348.90
2 Bedroom doors 4 set/s ₱ 6,370.00 ₱ 25,480.00
3 Bathroom doors 3 set/s ₱ 6,110.00 ₱ 18,330.00
4 Service and common balcony doors 3 set/s ₱ 6,890.00 ₱ 20,670.00
5 Lanai door 1 set/s ₱ 38,113.40 ₱ 38,113.40
6 Private balcony door 1 set/s ₱ 30,443.40 ₱ 30,443.40
7 Living area windows 2 set/s ₱ 6,084.00 ₱ 12,168.00
8 Open plan windows 1 set/s ₱ 2,444.00 ₱ 2,444.00
9 Garage and Kitchen windows 2 set/s ₱ 1,521.00 ₱ 3,042.00
10 Bathroom and Bedroom windows 2 set/s ₱ 2,496.00 ₱ 4,992.00
11 Stairs windows 3 set/s ₱ 1,248.00 ₱ 3,744.00
12 Bedroom windows 2 set/s ₱ 2,028.00 ₱ 4,056.00
13 Private bathroom window 1 set/s ₱ 832.00 ₱ 832.00
14 Private balcony window 1 set/s ₱ 611.00 ₱ 611.00
15 Glass panel balcony railings 2 set/s ₱ 1,311.05 ₱ 2,622.10
Subtotal: ₱ 187,896.80
CEILING FURNISHINGS / LIGHTING FIXTURES
1 High ceiling chandelier 1 set/s ₱ 4,784.00 ₱ 4,784.00
2 Round light 7 set/s ₱ 11,048.70 ₱ 77,340.90
3 Surface light 41 set/s ₱ 284.70 ₱ 11,672.70
4 Round downlight 18 set/s ₱ 221.00 ₱ 3,978.00
5 Outdoor light 8 set/s ₱ 700.70 ₱ 5,605.60
6 Pendant lights 4 set/s ₱ 6,193.20 ₱ 24,772.80
Subtotal: ₱ 128,154.00
TOILET FIXTURES AND ACCESSORIES
1 Toilet 3 set/s ₱ 6,814.60 ₱ 20,443.80
2 Sink 3 set/s ₱ 2,709.20 ₱ 8,127.60
3 Faucet 3 set/s ₱ 1,274.00 ₱ 3,822.00
4 Bidet 3 set/s ₱ 3,195.40 ₱ 9,586.20
5 Shower set 3 set/s ₱ 12,334.40 ₱ 37,003.20
Subtotal: ₱ 78,982.80
EARTH WORKS
1 Site setting out work and marking 1 lot ₱ 14,000.00 ₱ 14,000.00
2 Excavation 1 lot ₱ 14,000.00 ₱ 14,000.00
3 Backfill 1 lot ₱ 14,000.00 ₱ 14,000.00
4 Gravel bedding 26.95 cu.m ₱ 715.00 ₱ 19,269.25
5 Soil poisoning 134.75 sqm ₱ 260.00 ₱ 35,035.00
Subtotal: ₱ 96,304.25
REINFORCED CONCRETE WORKS
1 Concrete 47.68 sqm ₱ 6,253.00 ₱ 298,143.04
2 16mm diameter rebars 742 pc/s ₱ 520.00 ₱ 385,840.00
3 10mm diameter rebars ties 37 pc/s ₱ 520.00 ₱ 19,240.00
Subtotal: ₱ 703,223.04
PLUMBING WORKS
1 Sewer line 36 pc/s ₱ 121.88 ₱ 4,387.50
2 Cold water line 22 pc/s ₱ 216.45 ₱ 4,761.90
3 Pvc drain pipe 5 pc/s ₱ 494.00 ₱ 2,470.00
4 Sewage service connection 1 pc/s ₱ 765.91 ₱ 765.91
5 Shower drain 3 pc/s ₱ 399.10 ₱ 1,197.30
6 Floor drain 9 pc/s ₱ 249.60 ₱ 2,246.40
7 Kitchen sink 4 pc/s ₱ 2,221.70 ₱ 8,886.80
8 Cleanout 3 pc/s ₱ 1,222.00 ₱ 3,666.00
9 Catch basin 4 pc/s ₱ 3,248.70 ₱ 12,994.80
10 Check valve 1 pc/s ₱ 1,222.00 ₱ 1,222.00
11 Gate valve 6 pc/s ₱ 1,222.00 ₱ 7,332.00
12 Water meter 1 pc/s ₱ 2,316.60 ₱ 2,316.60
13 Cold waterline down feed 1 pc/s ₱ 216.45 ₱ 216.45
14 Soil stack 1 pc/s ₱ 382.20 ₱ 382.20
Subtotal: ₱ 52,845.86
WIRING COMPONENTS
2.1 Power line 14 pc/s 1182.376 ₱ 16,553.26
2.2 Lighting line 78 pc/s 180.7 ₱ 14,094.60
2.3 Switch line 36 pc/s 1144 ₱ 41,184.00
2.5 Duplex convenience outlet 28 pc/s 178.1 ₱ 4,986.80
2.6 Refrigerator outlet 1 pc/s 647.4 ₱ 647.40
2.7 Weather-proof outlet 5 pc/s 325 ₱ 1,625.00
2.8 Countertop outlet 2 pc/s 473.2 ₱ 946.40
2.9 Fan coil unit 4 pc/s 18934.5 ₱ 75,738.00
2.1 Circuit homerun 14 pc/s 260 ₱ 3,640.00
2.11 Panel board 1 pc/s 988 ₱ 988.00
2.12 Telephone outlet 1 pc/s 546 ₱ 546.00
2.13 Cable outlet 2 pc/s 1352 ₱ 2,704.00
2.14 Electrical meter 1 pc/s 2028 ₱ 2,028.00
2.15 Electrical service entrance 1 pc/s 882.687 ₱ 882.69
Subtotal: ₱ 166,564.15
TOTAL ESTIMATED COST ₱ 275,690.98
TOTAL PROJECT COST ₱ 1,921,827.63

You might also like