Assignment Estimate (Than Lwin Moe Thet)

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views10 pages

Assignment Estimate (Than Lwin Moe Thet)

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Project Name : One Storyed RC Building

Detail of Measurment

Measurment
Total of
Item Particular No Deduction Content
Each
L B H

1 Site Cleaning Work 1 x 1 58 50 2900 Sqft

29

Labour

Worker Nos 14.5

2 Surveying And Leveling Work

1 x 1 38 30 1140 Sqft

11.4

Labour

Worker Nos 11.4

3 Earthwork Excavation Work

Footing (F1) 13 x 1 6.5 6.5 6 3295.5 Cuft

32.955

Retaining Wall

Line 1 , 2 & 3 3 x 1 18 2 5 540 Cuft

Line 2a 2 x 1 2.75 2 5 55 Cuft

Line ABCD 4 x 1 17 2 5 680 Cuft

Line E 1 x 1 0.5 2 5 5 Cuft

1280 Cuft

4575.5 Cuft

45.755
Labour

Worker Nos 137.265

4 Hardcore Laying Work

Footing F1 13 x 1 5.5 5.5 0.75 294.9375 Cuft

Retaining Wall

Line 1 , 2 & 3 3 x 1 16 2 1 96 Cuft

Line 2a 2 x 1 2.75 2 1 5.5 Cuft

Line ABCD 4 x 1 20 2 1 160 Cuft

Line E 1 x 1 2 2 1 4 Cuft

265.5 Cuft

560.4375 Cuft

5.604375

Materials

Hardcore Suds 4.203

Sand Suds 1.401

Labour

Worker Nos 5.604

5 (1:3:6) Lean Concrete

Footing 13 x 1 5.5 5.5 0.25 98.3125 Cuft

0.983125

Materials

Cement Bags 12.87

Sand Suds 0.4719

Aggregate Suds 0.9438

Fuel Gals 1.96625

Labour

Mason Nos 0.983125


Worker Nos 5.89875

Machine Driver Nos 0.491563

6 Cement Concrete (1:2:4)

Footing 13 x 1 5 5 1 325 Cuft

Column

Footing to Plinth 13 x 1 0.75 0.75 5.5 40.21875 Cuft

Plinth to Roof 13 x 1 0.75 0.75 12 87.75 Cuft

Ground Beam

Line 1 , 2 & 3 3 x 1 28.75 0.75 0.75 48.51563 Cuft

Line 2a 2 x 1 6.25 0.75 0.75 7.03125 Cuft

Line ABCD 4 x 1 28.5 0.75 0.75 64.125 Cuft

Line E 1 x 1 6.25 0.75 0.75 3.515625 Cuft

Roof Beam

Line 1 , 2 & 3 3 x 1 28.75 0.75 0.75 48.51563 Cuft

Line 2a 1 x 1 6.25 0.75 0.75 3.515625 Cuft

Line ABCD 4 x 1 28.5 0.75 0.75 64.125 Cuft

Line E 1 x 1 6.25 0.75 0.75 3.515625 Cuft

695.8281 Cuft

6.958281

Materials

Cement Bags 130.94

Sand Suds 3.20

Aggregate Suds 6.40

Fuel Gal 13.92

Labour
Mason Nos 6.96

Worker Nos 20.87

Machine Driver Nos 3.48

7 9" thick brick work with (1-3) cement mortor

R.W Brick Work

Line 1 , 2 & 3 3 x 1 28.75 0.75 4.75 307.2656 Cuft

Line 2a 2 x 1 6.25 0.75 4.75 44.53125 Cuft

Line ABCD 4 x 1 28.5 0.75 4.75 406.125 Cuft

Line E 1 x 1 6.25 0.75 4.75 22.26563 Cuft

780.1875 Cuft

7.801875

Materials

Brick Nos 10532.53

Cement Bags 55.32239

Sand Suds 2.028488

Labour

Masons Nos 31.2075

Workers Nos 46.81125

8 4-1/2 Brick Work with (1-3) cement mortor

Line 1 , 2 & 3 3 x 1 28.75 0.375 11.25 363.8672 Cuft

Line 2a 2 x 1 6.25 0.375 11.25 52.73438 Cuft

Line ABCD 4 x 1 28.5 0.375 11.25 480.9375 Cuft

Line E 1 x 1 6.25 0.375 11.25 26.36719 Cuft

923.9063 Cuft

Detection

W1 (2'6" x 2'6") 6 x 1 2.5 0.375 2.5 14.0625 Cuft

D1 (3' x 6'9") 4 x 1 3 0.375 6.75 30.375 Cuft


D2 (2'6 x 6'6") 2 x 1 2.5 0.375 6.5 12.1875 Cuft

56.625 Cuft

867.2813 Cuft

8.672813

Materials

Bricks Nos 11708.3

Cements Bags 61.49812

Sand Suds 2.254931

Labour

Mason Nos 34.69125

Workers Nos 52.03687

9 Rebar Work

Footing Steel

X- direction 13 x 10 5.436 706.68 Cuft

Y-direction 13 x 10 5.436 706.68 Cuft

Column steel

Main Building 13 x 4 18.33

Stirrup

C1 9 x 9

Main Building 13 x 52 2.5 Cuft


Unit

Suds

````

Suds

Suds

Suds
Suds

suds
Suds
Suds
Suds