Pit Optimization Training

MineScape 2021
Materi
• Pit Optimization Concept
• Pit Optimization Setup (Basic)
• Pit Optimization Setup (Study Case)
Pit Optimization Concept

New pit optimization is an import step in the mine planning process. It is used to define the
most profitable pit shell (ultimate pit limit) from a set of geological model and economical
parameters applied. These pit shell is used as a guide to make a detailed pit design.

Pit Optimization will use input parameter such as geological model (schema) and economic
model ( cost of OB and Coal, also other additional cost). Pit optimization also can accept
variable parameter such as pit slope wall and cost haul parameter.

New MineScape Pit Optimization Pro used Push Relable algorithm that can generate ultimate
pit limit in shorter period of time. Push Relable algorithm also available for 3D model.
Pit Optimization Concept

TOPO

COAL
Pit Optimization Concept
Pit Optimization Concept
Example of Cost Variable for Pit Optimization:
Item Cost Mining $/Tonnes
1. Stripping cost 2
2. Equipment cost 2
3. Maintenance Cost 1
4. Hauling Cost 2
TOTAL 7

For cost-based unit will be setup specifically for OB in volume based (BCM,
1000 BCM) and COAL in mass based (Tonnes, 1000 Tonnes)
Pit Optimization Concept

+ 20
+ 30 + 25

Optimum pit
Pit Optimization Concept

Optimum Pit

Noted : masih dalam bentuk pit shell, belum detail engineering design (DED)
Setup Pit Optimisasi (Basic)
• New MineScape pit optimization pro tool is fully integrated
with Stratmodel schema.
• MineScape Pit Optimization pro accept basic input of economic
model such as coal and OB cost mining, sell price, coal
processing cost included complex setup for additional variable
cost (lifting cost, hauling cost, etc), optimization by quality and
various pit slope wall setup.
Setup Pit Optimisasi (Basic)
✓ On Start Page –
Select MineScape
Product Engineering
Optimization- Load
✓ Select Pit
Optimization on
Install Apps

✓ Pit Optimization Ribbon Menu


Setup Pit Optimisasi (Basic)
• Setup :
o Reserves
Similar to reserving process in
open cut modul
o Optimization
• Run All

To activate the pit optimization nodes


type a new name scenario or choose
from available list
Setup Pit Optimisasi (Basic)
• Schema – Select the
schema, model type, quality
that will be base in pit
optimization process
Setup Pit Optimisasi (Basic)
• Parameters
o Model Limit
o Data Limits
o Defaults
o Sampling
o Input
o Output
Setup Pit Optimisasi (Basic)
• Parameters
o Data limits
▪ Depth Low Limit
▪ Depth Increment
▪ Grid Row Division
▪ Grid Column Division
Setup Pit Optimisasi (Basic)
• Intervals/Quality
Choose interval seam &
quality
Setup Pit Optimisasi (Basic)
• Run Reserves
Click “Run ” to run the
reserve process
Setup Pit Optimisasi (Basic)
• Parameters
o Input / Output
o Regions
o Revenue
Setup Pit Optimisasi (Basic)
• Input / Output
o Input
o Output
o Optimizer Iterations
Setup Pit Optimisasi (Basic)
• Input / Output
o Input
o Output
o Optimizer Iterations
Setup Pit Optimisasi (Basic)
• Regions
o Default Slope
o Bench Up
o Multi
Setup Pit Optimisasi (Basic)
• Regions
o Bench Up
Setup Pit Optimisasi (Basic)
• Revenue
• Basic
o Lower Revenue
o Upper Revenue
o Recovery
Setup Pit Optimisasi (Basic)
• Costing
o Coal
o Burden
o Parting
o Processing
Setup Pit Optimisasi (Basic)
• Run Optimization
Click Run to run the pit
optimization process
Setup Pit Optimisasi (Basic)
• Pit Optimization
result with
iteration 4
Report Pit Optimization Result
• Reserve Categorization
• Net Profit Analysis
Report Pit Optimization Result
• To generate reserve
from block model
output, Select Block
Model Menu and
select Categorization
Report Pit Optimization Result
1. Select Block Model Name
output from Pit Optimization
Pro.
2. Type the name of the table
report output.
3. Select attributes to display in
the table report output.
4. Select attribute name of density.
Report Pit Optimization Result
1. On attribute tab, Select
attributes to be the
categorisation:
1. Block_Rocktype
2. Pitopt_Phase
2. Click Ok or Apply
Report Pit Optimization Result
Net Profit Analysis
PHASE Waste Resource SR Waste Cost Coal Cost Prcessing Cost Sales Price Gross Profit Total Cost Total Net Profit % Net Profit
1 2,259,120.61 3,113,458.02 0.73 2.2 2 0.4 15 46,701,870.30 12,442,364.59 34,259,505.71 73%
2 40,493,974.04 18,988,402.95 2.13 2.2 2 0.4 15 284,826,044.25 134,658,909.97 150,167,134.28 53%
3 132,050,904.89 39,767,866.18 3.32 2.2 2 0.4 15 596,517,992.70 385,954,869.59 210,563,123.11 35%
4 377,311,816.01 73,502,698.56 5.13 2.2 2 0.4 15 1,102,540,478.40 1,006,492,471.77 96,048,006.63 9%

• With the coal price of $15/tonnes it proves that pit shell number 3 is the optimum pit shell with SR 3.32
Setup Pit Optimisasi (Study Case)
• Additional Cost Lifting
• Additional Cost Processing
• Optimization By Quality
• Additional Cost by Polygon
Setup Pit Optimisasi (Cost Lifting)
• The increase in the cost lifting parameter is related to the additional costs that occur from the mining
progress that getting deeper to the pit floor.
• MineScape Pit Optimization pro calculates this formula based on the decrease in elevation that occurs
following to the mining progress and adjusted to the 3D model used.
• User can simply add the formula to form to calculate the cost lifting automatically.
• The calculation can be done in one input process with the basic setup.
Setup Pit Optimisasi (Cost Lifting)
• The implementation of cost lifting formula can be visualized using Blockmodel section.
• The detail valued of block_MCAF will show the cost applied in each block 3D based on the calculation

Without Cost Lifting

With Cost Lifting


Setup Pit Optimisasi (Cost Processing)
Processing cost modification will be based on company condition. In this case the user has different cost for
specific coal seam
One of coal processing expression:
if(currentinterval=='S06') THEN;4.1;else;1.1;endif
Optimization By Qualities
Many users also consider about coal qualities for pit optimization process. Because each qualities will produce
many kind of coal product based on specific quality, and each level of product will have different sell prices.

To setup the qualities process in new


pit optimization pro use expression
and setup under revenue node

16
Additional Cost by Polygon
• Additional Cost by Polygon will help user to setup specific cost that applied in specific area. It can handle
additional cost for mud cases, additional hauling cost, etc.
• User can simply add the formula to form to calculate the cost by polygon automatically.
Additional Cost by Polygon
• Run the pit optimization process

Mining Cost Distribution Section Cost by Polygon Limited Result

With polygon cost limit


Without polygon cost limit
Additional Cost for Variative Waste Meterial
• This additional cost will help user to setup different costing for variative of material that will have different
cost value.
• This setup will be in costing pro setup field
THANK YOU