DHA KARACHI STORM WATER
DRAINAGE NETWORK
KHAYABAN-E-AMEER KHUSRO OUTFALL
STRUCTURE
BILL OF QUANTITIES (BOQ)
DHA KARACHI STORM WATER DRAINAGE NETWORK
KHAYABAN-E-AMEER KHUSRO OUTFALL STRUCTURE
SUMMARY OF COST
Sr.No DESCRIPTION AMOUNT
1 STRUCTURAL WORKS COST
TOTAL COST(PKR) =
DHA KARACHI STORM WATER DRAINAGE NETWORK
KHAYABAN-E-AMEER KHUSRO OUTFALL STRUCTURE
BILL OF QUANTITIES
S.No Paid Item. Description Unit Quantity Rate Amount (Rs)
A STRUCTURAL WORKS
Excavation as in Ordinary Soil upto 1.5 M depth, in foundation and pipe
trenches upto 1.5 M wide, in shafts, wells and independent holes upto 30
01-01/ sqm each and throw earth clear of edges of excavation within 10m.
1
P-09 Timbering to be paid extra (Foundation and Trench over 1.5 M widths will
be treated as Areas).
Cum 808.18
Add for carrying soil / rock demolished brick bats, bricks,
sand and bitumen etc.), by any means, for each subsequent
2 1- 19 1000 M or part thereof (specified in items 1-1 to 1-15),
unload and stack or spread.
Cum 692.73
02-12/ Bottoming /sub base of any thickness as specified using with Granular
3 Cum 251.65
P-31 Sub Base material, all as specified.
03-02/ Providing and laying of lean concrete using crushed or broken stone
4 Cum 21.51
P-45 graded; 1:4:8, all as specified.
Providing and laying of Rcc with 4000 Psi in beams, columns, stairs,
03-15/ posts, struts, piers, lintels and the like. Reinforcement measured and paid
5
P-45 separately. (Add 5% for Sulphate Resistance Cement)
Cum 282.90
Supply and fix, bars round, using deformed bars Grade-60, including
09-56/
6 cutting, bending, binding and placing reinforcement in position.
P-95 KG 38,616
PLUM CONCRETE
7 NSI
(2:1 CONCRETE, STONE RATIO) Cum 119.90
8 NSI Screening LS 1.00
9 NSI Penstock LS 1.00
10 NSI De-Watering & Shoring LS 1.00
Total Amount Carried to Summary (PKR) =