0% found this document useful (0 votes)
45 views3 pages

01-BOQ Khayaban-e-Amir Khusro Outfall DHA Khi (31.08.24)

Uploaded by

Alam Aziz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views3 pages

01-BOQ Khayaban-e-Amir Khusro Outfall DHA Khi (31.08.24)

Uploaded by

Alam Aziz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

DHA KARACHI STORM WATER

DRAINAGE NETWORK
KHAYABAN-E-AMEER KHUSRO OUTFALL
STRUCTURE

BILL OF QUANTITIES (BOQ)


DHA KARACHI STORM WATER DRAINAGE NETWORK
KHAYABAN-E-AMEER KHUSRO OUTFALL STRUCTURE

SUMMARY OF COST

Sr.No DESCRIPTION AMOUNT

1 STRUCTURAL WORKS COST

TOTAL COST(PKR) =
DHA KARACHI STORM WATER DRAINAGE NETWORK
KHAYABAN-E-AMEER KHUSRO OUTFALL STRUCTURE

BILL OF QUANTITIES

S.No Paid Item. Description Unit Quantity Rate Amount (Rs)

A STRUCTURAL WORKS
Excavation as in Ordinary Soil upto 1.5 M depth, in foundation and pipe
trenches upto 1.5 M wide, in shafts, wells and independent holes upto 30
01-01/ sqm each and throw earth clear of edges of excavation within 10m.
1
P-09 Timbering to be paid extra (Foundation and Trench over 1.5 M widths will
be treated as Areas).
Cum 808.18
Add for carrying soil / rock demolished brick bats, bricks,
sand and bitumen etc.), by any means, for each subsequent
2 1- 19 1000 M or part thereof (specified in items 1-1 to 1-15),
unload and stack or spread.
Cum 692.73
02-12/ Bottoming /sub base of any thickness as specified using with Granular
3 Cum 251.65
P-31 Sub Base material, all as specified.
03-02/ Providing and laying of lean concrete using crushed or broken stone
4 Cum 21.51
P-45 graded; 1:4:8, all as specified.
Providing and laying of Rcc with 4000 Psi in beams, columns, stairs,
03-15/ posts, struts, piers, lintels and the like. Reinforcement measured and paid
5
P-45 separately. (Add 5% for Sulphate Resistance Cement)
Cum 282.90
Supply and fix, bars round, using deformed bars Grade-60, including
09-56/
6 cutting, bending, binding and placing reinforcement in position.
P-95 KG 38,616
PLUM CONCRETE
7 NSI
(2:1 CONCRETE, STONE RATIO) Cum 119.90

8 NSI Screening LS 1.00

9 NSI Penstock LS 1.00

10 NSI De-Watering & Shoring LS 1.00

Total Amount Carried to Summary (PKR) =