0% found this document useful (0 votes)
87 views7 pages

ERCOT EHV Infrastructure Initiative Update October 2024

Uploaded by

Carlos Fernandez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views7 pages

ERCOT EHV Infrastructure Initiative Update October 2024

Uploaded by

Carlos Fernandez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

ERCOT Extra-High Voltage (EHV)

Infrastructure Initiative
Update

ERCOT Regional Transmission Planning

October 16, 2024


Agenda

• September RPG – Recap


• 2024 RTP – 765-kV Scope
• 2024 RTP – 765-kV Deliverables

PUBLIC 2
September RPG – Recap

• ERCOT presented the initial holistic 765-kV plan


considered in the 2024 RTP
• Initial 765-kV Infrastructure Plan Summary
– Phase I represented potential maximum benefits considering 2030
load level
– Phase II represented additional benefits beyond 2030 load level
– Capital costs not yet considered

• ERCOT is continuing to work on a “765-kV Core” plan


(subset of Phase I) to address the 2030 RTP reliability
need

PUBLIC 3
2024 RTP – 765-kV Scope
• Two RTP assessments will be performed
– Standard RTP assessment (without 765-kV Core plan)
• Corrective Action Plans (CAPs) will be developed for
– N-1, G-1+N-1, X-1+N-1
» Will include 69-kV, 138-kV, and 345-kV
– N-1-1 maintenance outage scenario
» Will include 69-kV, 138-kV, and 345-kV
– Minimum Deliverability
» Will include 69-kV, 138-kV, and 345-kV

– EHV RTP assessment (with 765-kV Core plan)


• CAPs will be developed for
– N-1, G-1+N-1, X-1+N-1
» Will include 69-kV, 138-kV, and 345-kV
– N-1-1 maintenance outage scenario
» Will include 345-kV only
– Minimum Deliverability
» Will not be performed

PUBLIC 4
2024 RTP – 765-kV Deliverables

• Two complete RTP CAP lists


– Standard RTP assessment (without 765-kV Core plan)
– EHV RTP assessment (with 765-kV Core plan)

• Capital cost comparison between two final RTP plans


• Right-of-Way comparison
• System Loss comparison
• Completed by end of December 2024

PUBLIC 5
Additional – 765-kV vs Standard RTP Plan

• System Stability Analysis


– Evaluation of existing impacted GTCs
– Potential impact on Series Compensation

• System congestion analysis


• Completed by mid-January 2025