SAT Report
SAT Report
1. Service Specification
1.1 L-L voltage V 1.2 L-N voltage V 1.3 Wires
2. Visual Checks Result either (OK: Confirmed), (N/OK: Failed), (N/A: not applicable)
2.1 Components Labeling 2.2 Scratches
2.3 Panel Name Plates 2.4 Cleanness
2.5 Terminals Numbering 2.6 Cable entry/incoming
2.7 Cables Numbering (control wire) 2.8 Cable Entry/Outgoing
2.9 Cable Marking (power cable) 2.10 Bus Bar Marking
2.11 System Bas Bars
3. Conformity check of components Result either (OK: Confirmed), (N/OK: Failed), (N/A: not applicable)
3.1 Enclosures 3.2 Molded Case Circuit Breakers
3.3 Air Circuit Breakers 3.4 Miniature Circuit Breakers
3.5 Variable Speed Drives 3.6 PLC (Programmable Logic Control)
3.7 Soft starters 3.8 BMS Components
3.9 Contactors 3.10 Metering Components
3.11 Indication Components 3.12 Protection elements
3.13 MIMIC Diagrams 3.14 Auto transformer
3.15 Relays 3.16 UPS
3.17 Fuses 3.18 Power supply
3.19 Transformers (CT) 3.20 Transformers (VT)
3.21 Generator Protection & 3.22 Signaling Components
Synchronization Relays
4. Mechanical checks Result either (OK: Confirmed), (N/OK: Failed), (N/A: not applicable)
4.1 Tightness of Bolts & Screws 4.2 Interlocking mechanical operating
4.3 Breakers Opening & closing 5 times 4.4 Switches mechanical operating
4.5 Handles mechanically Operating 4.6 Torque marks for bolts of power circuits
4.7 Earthing Parts 4.8 Doors interlocking with breakers
Page 1 of 2
Qetaf Electrics The Highest QUALITY
5. Electric Tests Result either (OK: Confirmed), (N/OK: Failed), (N/A: not applicable)
5.1 Phase Continuity L1 L2 L3 N E
Test
5.2 Megger L1-L2 insulation >1000MΩ E-N insulation >1000MΩ
Tests 1000V L1-L3 insulation >1000MΩ
DC Ω L3-L2 insulation >1000MΩ
L-N insulation >1000MΩ
L-E insulation >1000MΩ
5.3 Dielectric L1-L2 E-N
Test or H.V. L2-L3
Test 2.5kV AC
L3-L1
L-N
L-E
6. Functional tests Result either (OK: Confirmed), (N/OK: Failed), (N/A: not applicable)
6.1 Direct online starting 6.2 PLC control
6.3 Star delta Starting 6.4 BMS control
6.5 Auto transformer starting 6.6 Synchronization control
6.7 Soft starter starting 6.8 ATS control
6.9 Variable speed starting
QC Comments:
CONTROLLED
Page 2 of 2