FPS FOR 1 METER FOR 1 Ft

1 foot ( ft ) = 12 inch m 1 0.3048


1 foot ( ft ) = 0.3048 m ft 3.281 1 3.281
cm 100 30.480 1
1 mile = 5281 foot ( ft ) mm 1000 304.800 10
1 mile = 1.6093 Km ang
in 39.37 12 0.393
1 inch = 2.54 cm yds 1.09361 0.333
1 inch = 25.4 mm rod 0.19884 6.06
304.8
1 Rod = 5.5 yds
1 Rod = 66 foot ( ft ) 1FOOT
1 Rod = 20.117 m 3.281 1INCH
12 1INCH
1 ginter chain = 22 yds

1 furlong = 220 yds 1mm


1 furlong = 10 chain 1cm
1 furlong = 201.17 m 1m
1 furlong = 40 Rod 1m
1km
METERIC 1dm

1 mm = 1000 mm 1MILE 1.6093 KM


1 mm = 0.0394 in 1MILE 5280 FT
1KM 1000M
1 cm = 10 mm 1M 3.281 1.6093
1 cm = 0.3937 in 1YDS 3FT
Cruch Factor = .88 *
1 Meter ( m ) = 100 cm
1 Meter ( m ) = 3.281 ft
1 Meter ( m ) = 1.0936 yds
1 Meter ( m ) = 0.27 in
12INCH
2.54CM
25.4MM

1000 micrometer
10mm
100cm
3.281 ft
1000m
10cm
MATERIAL CALCULATION conc IN Cft MATERIAL CALCULATION IN CM
Tangent = -749.90523 Y

Ratio = = 1 12 Ratio = = 1

Ratio = = 4 Ratio = = 2

Ratio = = 8 Ratio = = 4

Total Qty of Concrete = 750.00 Total Qty of Concrete = 9.529

Cement Bags / Cft = 0.095 Bags Cement Bags / CM = 6.216 Bags

Sand / Cft = 0.474 Cft Sand / CM = 15.541 Cft

Aggregate / Cft = 0.948 Cft Aggregate / CM = 31.082 Cft


Total Used Total Used
Cement used in Qty. = 71.077 Bags Cement Bags used in Qty. = 59.238 Bags

Sand used in Qty. = 355.385 Cft Sand used in Qty. = 148.096 Cft

Aggregate used in Qty. = 710.769 Cft Aggregate used in Qty. = 296.191 Cft

New Vision Engineering Consultant


Shahzad
MATERIAL CALCULATION IN Cft MATERIAL CALCULATION IN CM
Tangent = -2324.874 Y

Ratio = = 1 Ratio = = 1

Ratio = = 2 Ratio = = 2

Ratio = = 4 Ratio = = 4

Total Qty of Concrete = 2325.05 Total Qty of Concrete = 65.828

Cement Bags / Cft = 0.176 Bags Cement Bags / CM = 6.216 Bags

Sand / Cft = 0.440 Cft Sand / CM = 15.541 Cft

Aggregate / Cft = 0.880 Cft Aggregate / CM = 31.082 Cft


Total Used Total Used
Cement used in Qty. = 409.209 Bags Cement Bags used in Qty. = 409.209 Bags

Sand used in Qty. = 1023.022 Cft Sand used in Qty. = 1023.022 Cft

Aggregate used in Qty. = 2046.044 Cft Aggregate used in Qty. = 2046.044 Cft
CEMENT PLASTER 1/2" THICK IN Sft CEMENT PLASTER 1/2" THICK IN SM
Ratio = 1. = 1 Ratio = 1 = 1
Ratio = 2 = 3 Ratio = 2 = 3
Total Qty = 500.000 Total Qty = 225.000
Cement Bags / Sft = 0.013 Bags Cement Bags / SM = 0.135 Bags
Sand / Sft = 0.047 Cft Sand / SM = 0.504 Cft

Cement used in Qty. = 6.25 Bags Cement Bags used in Qty. = 30.26 Bags

Sand used in Qty. = 23.44 Cft Sand used in Qty. = 113.48 Cft

CEMENT PLASTER 3/4" THICK IN Sft CEMENT PLASTER 3/4" THICK IN SM


Ratio = 1 = 1 Ratio = 1 = 1
Ratio = 2 = 4 Ratio = 2 = 4
Total Qty = 100.000 Total Qty = 9.294
Cement Bags / Sft = 0.015 Bags Cement Bags / SM = 0.161 Bags
Sand / Sft = 0.075 Cft Sand / SM = 0.807 Cft

Cement used in Qty. = 1.50 Bags Cement Bags used in Qty. = 1.50 Bags

Sand used in Qty. = 7.50 Cft Sand used in Qty. = 7.50 Cft

CEMENT PLASTER 3/8" THICK IN Sft CEMENT PLASTER 3/8" THICK IN SM


Ratio = 1 = 1 Ratio = 1 = 1
Ratio = 2 = 6 Ratio = 2 = 4
Total Qty = 25.000 Total Qty = 2.323
Cement Bags / Sft = 0.007 Bags Cement Bags / SM = 0.103 Bags
Sand / Sft = 0.051 Cft Sand / SM = 0.516 Cft

Cement used in Qty. = 0.17 Bags Cement Bags used in Qty. = 0.24 Bags

Sand used in Qty. = 1.29 Cft Sand used in Qty. = 1.20 Cft

CEMENT PLASTER 1.5" THICK IN Sft


Ratio = 1 = 1
Ratio = 2 = 3
Total Qty = 225
Cement Bags / Sft = 0.032 Bags
Sand / Sft = 0.119 Cft

Cement used in Qty. = 7.14 Bags

Sand used in Qty. = 26.78 Cft


BRICK MASONRY IN Cft BRICK MASONRY IN CM
Tangent = -49.965714 Y

Ratio = = 1 Ratio = 1 = 1

Ratio = = 6 Ratio = 2 = 8

Total Qty. = 50.000 Total Qty. = 12.742

Cement Bags / Cft = 0.034 Bags Cement Bags / CM = 0.942 Bags

Sand / Cft = 0.257 Cft Sand / CM = 9.419 Cft

Bricks = 13.500 Cft Bricks = 476.752 Cft


Total Used Total Used
Cement used in Qty. = 1.714 Bags Cement Bags used in Qty. = 12.002 Bags

Sand used in Qty. = 12.857 Cft Sand used in Qty. = 120.017 Cft

BRICKS = 675.000 NO. BRICKS = 6075.000


STONE MASONRY IN Cft STONE MASONRY
Tangent = -5399.928 Y

Ratio = 1 = 1 Ratio = 1

Ratio = 2 = 4 Ratio = 2

Total Qty. = 5400.000 Total Qty.

Cement Bags / Cft = 0.072 Bags Cement Bags / CM

Sand / Cft = 0.360 Cft Sand / CM

Cement used in Qty. = 388.80 Bags Cement Bags used in Qty.

Sand used in Qty. = 1944.00 Cft Sand used in Qty.


ONE MASONRY IN CM

= 1

= 3

= 152.888

= 3.179 Bags

= 11.921 Cft

= 486.00 Bags

= 1822.50 Cft
MATERIALS FOR DIFFERENT ITEMS OF WORK.
Sr. QTY. MATERIAL IN QTY. OF MATERIAL
ITEMS OF WORK
No (F.P.S) SYSTEM IN (M.K.S) SYSTEM

Bricks for brick work. (9" x4-1/2" x3") or 50000 Nos.for 100 m3. or
1350 Nos. for 100 Cft.
1 (20x10x10cm) 500 Nos. for 1 m3.

2 Dry mortar for brick work. 30 Cft. for 100 Cft. 3 m3. for 100 m3.

3 Stone for rubble stone masonry. 125 Cft for 100 Cft. 125 m3. for 100 m3.

4 Dry mortar for rubble stone masonry. 42 Cft. for 100 Cft. 42 m3. for 100 m3.

5 Bricks for brick ballast for cement concrete. 1050 Nos. for 100 Cft. 3700 Nos. for 100 m3

6 Brick Bats. Or brcik ballast for lime cement. 105 Cft for 100 Cft 105 m3. for 100 m3.

7 Brick ballast for lime concrete. 100 Cft for 100 Cft 100 m3. for 100 m3.

8 Dry mortar for lime concrete. 35 Cft. for 100 Cft. 35 m3. for 100 m3.

9 Dry material for P.C.C a 154 m3. for 100 m3.

10 Bricks for R.B slab. 1200 Nos. for 100 Cft. 4200 Nos. for 100 m3.

11 Dry mortar for R.B work. 45 Cft. for 100 Cft. 45 m3. for 100 m3.

12 Dry mortar for 12mm (1/2") Plaster. 6 Cft. for 100 Sft. 2mm3. for 100 m2.

13 Dry mortar for Cement Pointing. 2 Cft. for 100 Sft. .6 m3. for 100 m2.

14 Lime for White washing single coat. 1 Kg. for 100 Sft. 10 Kg. for 100 m2.

15 Dry distemper for 1st Coat. 0.65 Kg. for 100 Sft. 6-1/2 Kg. for 100 m2.

16 Dry distemper for 2nd Coat. 0.5 Kg. for 100 Sft. 5 Kg. for 100 m2.

17 Snow-Cement for 1st Coat. 3 Kg. for 100 Sft. 30 Kg. for 100 m2.

18 Snow- " " 2nd Coat. 2 Kg. for 100 Sft. 20 Kg. for 100 m2.

19 Paint ready mixed for painting one coat. 1/3 gl. for 100 Sft. 10 Lit. for 100m2.

20 Paint (stiff) for painting one Coat. 1 Kg. for 100 Sft. 10 Kg. for 100m2.

21 Bricks on edge. 500 Nos. for 100 Sft. 5000 Nos. for 100 m2.
22 Dry mortar for 1/2" brick wall. 12 Cft. for 100 Sft. 3.2 m3. for 100 m2.

23 Bricks on fait. 350 Nos. for. 100 Sft. 3500 Nos. for 100 m2.

24 Dry mortar for flat brick floor. 8 Cft. for 100 Sft. 2.25 m3. for 100 m2.

25 Hony comb brick wall. 325 Nos. for 100 Sft. 3250 Nos. for 100 m2.

26 Dry mortar for brick wall. (Hony comb) 8 Cft. for 100 Sft. 2.25 m3. for 100 m2.

27 Bittmen cr asphalt for D.P.C or on roof.1st coat. 15 kg. for 100 Sft. 150 Kg. for 100 m2.

28 -do- 2nd coat. 10 kg. for 100 Sft. 100 Kg. for 100 m2.

29 G.C.I. Sheet for roof. 128 Sft. for 100 Sft. 128 sqm. for 100 m2.

30 A.C. Sheet for roof. 115 Sft. for 100 Sft. 115 sqm. for 100 m2.
TOE POINT CROSS POINT
Sr. No. Ele & Dis Calculation Sr. No. Ele & Dis Calculation

1 14.837 -0.004 1 640.270 J =


5.850 P = -0.008 0.000 K =
2 10.621 Q = 2810.000 2 640.182 X =
15.000 4.450 Y =
3 10.602 3 640.680
20.000 3.220
4 638.790
Slope = -2.000 Elevation = 10.624 4.000
Distance = 14.277 Elevation =
NOTE : NSL Distance =
Fill Sec. Slope is - VE Cut Sec. Slope is + VE 3
PGL 1 2
4
POINT
Calculation

-0.020
-2.423
3.417
640.202

640.202
3.417
INTERSECTION POINT BETWEEN CUT & FILL X-Sec.
Sr. No. Elevation

1 135.000 PGL Fill Sec.


2 132.150 NSL
3 140.000 NSL Cut Sec.
4 138.450 PGL

Length Between X-Sec. To X-sec.= 20.000

First X-sec. Rd. = 250.000

Inter Point, RD 262.955


PGL IN VERTICAL CURVE (LHS) PGL IN VERTICAL CURVE
Tangent = 75 Y = -4.019 Tangent =
Next Grade = -9.154 X = 25.000 Next Grade =
Back Grade = 12.28 M = -0.447 Back Grade =
Required Ch. = 00+100 Dis = 50.000 Required Ch. =
Pvc. Ch. = 00+075 L1 = 5011.860 Pvt. Ch. =
Pvi. Ch. = 00+150 A1 = 5011.413 Pvi. Ch. =
Pvi Ele. = 5018.000 Pvi Ele. =

Req. Elevation = 5011.413 Req. Elevation =

Mid Ordinate = -4.019

I.P Elevation = 5013.981

Normal Grade Normal PGL


Rd. 1 = 00+000 IP RD. = 00+000
Elevation 1 = 675.330 Grade = -0.125
Rd. 2 = 03+000 IP Elevation = 675.330
Elevation 2 = 671.58 Required Rd. = 03+000
Distance = 3000.000 Distance = 3000
Grade = -0.125 P.G.L = 671.580
L IN VERTICAL CURVE (RHS)
75 Y = -4.019
-9.154 X = 50.000
12.28 M = -1.786
00+175 Dis = 25.000
00+225 L1 = 5015.712
00+150 A1 = 5013.925
5018

5013.925
AREA OF CROSS SECTION
Sr. No. Elevation Distance
1 212.420 -6.980
2 212.560 -3.420
3 212.810 -3.050
4 212.760 -4.210
5 213.090 -4.050
6 213.050 -5.050
7 212.420 -6.980
8
9
10
11
12
13
14
15
16
17
18
19
20
-1.253 Area of X-Sec.
AREA OF CROSS SECTION
Sr. No. Elevation Distance
1 130.885 0.000
2 130.848 1.850
3 130.768 3.850
4 129.989 5.407
5 129.983 2.700
6 130.477 2.300
7 130.479 1.900
8 130.508 0.000
9 130.508 -1.300 5.289 Area of X-Sec.
10 130.402 -1.800
11 130.039 -2.600
12 130.020 -5.347
13 130.768 -3.850
14 130.848 -1.850
15 130.885 0.000
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
AREA OF CROSS SECTION
Sr. No. Elevation Distance
1 130.885 0.000
2 130.848 1.850
3 130.768 3.850
4 129.989 5.407
5 129.983 2.700
6 130.477 2.300
7 130.479 1.900
8 130.508 0.000
9 130.508 -1.300
10 130.402 -1.800
11 130.039 -2.600
12 130.020 -5.347
13 130.768 -3.850
14 130.848 -1.850
15 130.885 0.000
16
17
18
19
20
21
22 5.289 Area of X-Sec.
23
24
25
26
27
28
29
30
31
32
EASTING - NORTHING BEARING -
Instrument At = BM-1 Instrument At =
Easting = 68585.709 Easting =
Northing = 41545.956 Northing =
Distance = 543.480 RO =
Bearing = 317.004 Easting =
Northing =
RO = BM-2
Next point Easting ( E ) = Sin Bearing x Distance + Easting = 68215.084 Diffrence of Easting =
Next point Northing ( N ) = Cos Bearing x Distance + Northing = 41943.458 Diffrence of Northing =

Distance =
Baering =

360, 0
E = - ve E = + ve
N = + ve N = + ve
270 90
E = - ve E = + ve
N = - ve N = - ve
180
BEARING - DISTANCE
BM-1
68585.709
41545.956
BM-2
68215.084
41943.458

-370.625
397.502

SQR (Diff of Easting ^2 + Diff of Northing ^2) 543.480


Tan-1 x (Diff of Easting / Diff of Northing) = -42.996

0 - 90 = 2.004
90 - 180 = 137.004
180 - 270 = 137.004
90 270 - 360 = 317.004