Programming (QS)
Programming (QS)
1000 micrometer
10mm
100cm
3.281 ft
1000m
10cm
MATERIAL CALCULATION conc IN Cft MATERIAL CALCULATION IN CM
Tangent = -749.90523 Y
Ratio = = 1 12 Ratio = = 1
Ratio = = 4 Ratio = = 2
Ratio = = 8 Ratio = = 4
Sand used in Qty. = 355.385 Cft Sand used in Qty. = 148.096 Cft
Aggregate used in Qty. = 710.769 Cft Aggregate used in Qty. = 296.191 Cft
Ratio = = 1 Ratio = = 1
Ratio = = 2 Ratio = = 2
Ratio = = 4 Ratio = = 4
Sand used in Qty. = 1023.022 Cft Sand used in Qty. = 1023.022 Cft
Aggregate used in Qty. = 2046.044 Cft Aggregate used in Qty. = 2046.044 Cft
CEMENT PLASTER 1/2" THICK IN Sft CEMENT PLASTER 1/2" THICK IN SM
Ratio = 1. = 1 Ratio = 1 = 1
Ratio = 2 = 3 Ratio = 2 = 3
Total Qty = 500.000 Total Qty = 225.000
Cement Bags / Sft = 0.013 Bags Cement Bags / SM = 0.135 Bags
Sand / Sft = 0.047 Cft Sand / SM = 0.504 Cft
Cement used in Qty. = 6.25 Bags Cement Bags used in Qty. = 30.26 Bags
Sand used in Qty. = 23.44 Cft Sand used in Qty. = 113.48 Cft
Cement used in Qty. = 1.50 Bags Cement Bags used in Qty. = 1.50 Bags
Sand used in Qty. = 7.50 Cft Sand used in Qty. = 7.50 Cft
Cement used in Qty. = 0.17 Bags Cement Bags used in Qty. = 0.24 Bags
Sand used in Qty. = 1.29 Cft Sand used in Qty. = 1.20 Cft
Ratio = = 1 Ratio = 1 = 1
Ratio = = 6 Ratio = 2 = 8
Sand used in Qty. = 12.857 Cft Sand used in Qty. = 120.017 Cft
Ratio = 1 = 1 Ratio = 1
Ratio = 2 = 4 Ratio = 2
= 1
= 3
= 152.888
= 3.179 Bags
= 11.921 Cft
= 486.00 Bags
= 1822.50 Cft
MATERIALS FOR DIFFERENT ITEMS OF WORK.
Sr. QTY. MATERIAL IN QTY. OF MATERIAL
ITEMS OF WORK
No (F.P.S) SYSTEM IN (M.K.S) SYSTEM
Bricks for brick work. (9" x4-1/2" x3") or 50000 Nos.for 100 m3. or
1350 Nos. for 100 Cft.
1 (20x10x10cm) 500 Nos. for 1 m3.
2 Dry mortar for brick work. 30 Cft. for 100 Cft. 3 m3. for 100 m3.
3 Stone for rubble stone masonry. 125 Cft for 100 Cft. 125 m3. for 100 m3.
4 Dry mortar for rubble stone masonry. 42 Cft. for 100 Cft. 42 m3. for 100 m3.
5 Bricks for brick ballast for cement concrete. 1050 Nos. for 100 Cft. 3700 Nos. for 100 m3
6 Brick Bats. Or brcik ballast for lime cement. 105 Cft for 100 Cft 105 m3. for 100 m3.
7 Brick ballast for lime concrete. 100 Cft for 100 Cft 100 m3. for 100 m3.
8 Dry mortar for lime concrete. 35 Cft. for 100 Cft. 35 m3. for 100 m3.
10 Bricks for R.B slab. 1200 Nos. for 100 Cft. 4200 Nos. for 100 m3.
11 Dry mortar for R.B work. 45 Cft. for 100 Cft. 45 m3. for 100 m3.
12 Dry mortar for 12mm (1/2") Plaster. 6 Cft. for 100 Sft. 2mm3. for 100 m2.
13 Dry mortar for Cement Pointing. 2 Cft. for 100 Sft. .6 m3. for 100 m2.
14 Lime for White washing single coat. 1 Kg. for 100 Sft. 10 Kg. for 100 m2.
15 Dry distemper for 1st Coat. 0.65 Kg. for 100 Sft. 6-1/2 Kg. for 100 m2.
16 Dry distemper for 2nd Coat. 0.5 Kg. for 100 Sft. 5 Kg. for 100 m2.
17 Snow-Cement for 1st Coat. 3 Kg. for 100 Sft. 30 Kg. for 100 m2.
18 Snow- " " 2nd Coat. 2 Kg. for 100 Sft. 20 Kg. for 100 m2.
19 Paint ready mixed for painting one coat. 1/3 gl. for 100 Sft. 10 Lit. for 100m2.
20 Paint (stiff) for painting one Coat. 1 Kg. for 100 Sft. 10 Kg. for 100m2.
21 Bricks on edge. 500 Nos. for 100 Sft. 5000 Nos. for 100 m2.
22 Dry mortar for 1/2" brick wall. 12 Cft. for 100 Sft. 3.2 m3. for 100 m2.
23 Bricks on fait. 350 Nos. for. 100 Sft. 3500 Nos. for 100 m2.
24 Dry mortar for flat brick floor. 8 Cft. for 100 Sft. 2.25 m3. for 100 m2.
25 Hony comb brick wall. 325 Nos. for 100 Sft. 3250 Nos. for 100 m2.
26 Dry mortar for brick wall. (Hony comb) 8 Cft. for 100 Sft. 2.25 m3. for 100 m2.
27 Bittmen cr asphalt for D.P.C or on roof.1st coat. 15 kg. for 100 Sft. 150 Kg. for 100 m2.
28 -do- 2nd coat. 10 kg. for 100 Sft. 100 Kg. for 100 m2.
29 G.C.I. Sheet for roof. 128 Sft. for 100 Sft. 128 sqm. for 100 m2.
30 A.C. Sheet for roof. 115 Sft. for 100 Sft. 115 sqm. for 100 m2.
TOE POINT CROSS POINT
Sr. No. Ele & Dis Calculation Sr. No. Ele & Dis Calculation
-0.020
-2.423
3.417
640.202
640.202
3.417
INTERSECTION POINT BETWEEN CUT & FILL X-Sec.
Sr. No. Elevation
5013.925
AREA OF CROSS SECTION
Sr. No. Elevation Distance
1 212.420 -6.980
2 212.560 -3.420
3 212.810 -3.050
4 212.760 -4.210
5 213.090 -4.050
6 213.050 -5.050
7 212.420 -6.980
8
9
10
11
12
13
14
15
16
17
18
19
20
-1.253 Area of X-Sec.
AREA OF CROSS SECTION
Sr. No. Elevation Distance
1 130.885 0.000
2 130.848 1.850
3 130.768 3.850
4 129.989 5.407
5 129.983 2.700
6 130.477 2.300
7 130.479 1.900
8 130.508 0.000
9 130.508 -1.300 5.289 Area of X-Sec.
10 130.402 -1.800
11 130.039 -2.600
12 130.020 -5.347
13 130.768 -3.850
14 130.848 -1.850
15 130.885 0.000
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
AREA OF CROSS SECTION
Sr. No. Elevation Distance
1 130.885 0.000
2 130.848 1.850
3 130.768 3.850
4 129.989 5.407
5 129.983 2.700
6 130.477 2.300
7 130.479 1.900
8 130.508 0.000
9 130.508 -1.300
10 130.402 -1.800
11 130.039 -2.600
12 130.020 -5.347
13 130.768 -3.850
14 130.848 -1.850
15 130.885 0.000
16
17
18
19
20
21
22 5.289 Area of X-Sec.
23
24
25
26
27
28
29
30
31
32
EASTING - NORTHING BEARING -
Instrument At = BM-1 Instrument At =
Easting = 68585.709 Easting =
Northing = 41545.956 Northing =
Distance = 543.480 RO =
Bearing = 317.004 Easting =
Northing =
RO = BM-2
Next point Easting ( E ) = Sin Bearing x Distance + Easting = 68215.084 Diffrence of Easting =
Next point Northing ( N ) = Cos Bearing x Distance + Northing = 41943.458 Diffrence of Northing =
Distance =
Baering =
360, 0
E = - ve E = + ve
N = + ve N = + ve
270 90
E = - ve E = + ve
N = - ve N = - ve
180
BEARING - DISTANCE
BM-1
68585.709
41545.956
BM-2
68215.084
41943.458
-370.625
397.502
0 - 90 = 2.004
90 - 180 = 137.004
180 - 270 = 137.004
90 270 - 360 = 317.004
DMS$(F19)
DEG(F19)